首页 | 本学科首页   官方微博 | 高级检索  
文章检索
  按 检索   检索词:      
出版年份:   被引次数:   他引次数: 提示:输入*表示无穷大
  收费全文   190篇
  免费   29篇
  2021年   1篇
  2019年   5篇
  2018年   2篇
  2017年   5篇
  2016年   11篇
  2015年   14篇
  2014年   8篇
  2013年   58篇
  2012年   9篇
  2011年   7篇
  2010年   5篇
  2009年   7篇
  2008年   10篇
  2007年   11篇
  2006年   7篇
  2005年   11篇
  2004年   8篇
  2003年   11篇
  2002年   10篇
  2001年   6篇
  2000年   5篇
  1999年   6篇
  1993年   1篇
  1986年   1篇
排序方式: 共有219条查询结果,搜索用时 15 毫秒
171.
Standard approaches to classical inventory control problems treat satisfying a predefined demand level as a constraint. In many practical contexts, however, total demand is comprised of separate demands from different markets or customers. It is not always clear that constraining a producer to satisfy all markets is an optimal approach. Since the inventory‐related cost of an item depends on total demand volume, no clear method exists for determining a market's profitability a priori, based simply on per unit revenue and cost. Moreover, capacity constraints often limit a producer's ability to meet all demands. This paper presents models to address economic ordering decisions when a producer can choose whether to satisfy multiple markets. These models result in a set of nonlinear binary integer programming problems that, in the uncapacitated case, lend themselves to efficient solution due to their special structure. The capacitated versions can be cast as nonlinear knapsack problems, for which we propose a heuristic solution approach that is asymptotically optimal in the number of markets. The models generalize the classical EOQ and EPQ problems and lead to interesting optimization problems with intuitively appealing solution properties and interesting implications for inventory and pricing management. © 2003 Wiley Periodicals, Inc. Naval Research Logistics, 2004.  相似文献   
172.
Cardiovascular diseases (CVDs) are the leading cause of death and disability both in the United States and worldwide. Despite high morbidity, mortality, and cost in the United States and global healthcare systems, cardiovascular care has been understudied in the healthcare operations management literature. In this paper, we identify research opportunities for healthcare operations management scholars to aid in improving cardiovascular care. We focus on three burdensome conditions, including (1) coronary artery disease, (2) stroke, and (3) heart failure, which, collectively, lead to the vast majority of CVD‐caused mortality and disability. For each condition, we characterize a typical patient's journey in receiving cardiovascular care, elucidating key challenges in improving care and outlining research questions for healthcare operations management scholars. We close with a reference to new research opportunities that emerge as artificial intelligence is likely to transform much of cardiovascular care.  相似文献   
173.
This paper considers a warehouse sizing problem whose objective is to minimize the total cost of ordering, holding, and warehousing of inventory. Unlike typical economic lot sizing models, the warehousing cost structure examined here is not the simple unit rate type, but rather a more realistic step function of the warehouse space to be acquired. In the cases when only one type of stock‐keeping unit (SKU) is warehoused, or when multiple SKUs are warehoused, but, with separable inventory costs, closed form solutions are obtained for the optimal warehouse size. For the case of multi‐SKUs with joint inventory replenishment cost, a heuristic with a provable performance bound of 94% is provided. © 2001 John Wiley & Sons, Inc. Naval Research Logistics 48: 299–312, 2001  相似文献   
174.
Retrial queueing systems are widely used in teletraffic theory and computer and communication networks. Although there has been a rapid growth in the literature on retrial queueing systems, the research on retrial queues with nonexponential retrial times is very limited. This paper is concerned with the analytical treatment of an M/G/1 retrial queue with general retrial times. Our queueing model is different from most single server retrial queueing models in several respectives. First, customers who find the server busy are queued in the orbit in accordance with an FCFS (first‐come‐first‐served) discipline and only the customer at the head of the queue is allowed for access to the server. Besides, a retrial time begins (if applicable) only when the server completes a service rather upon a service attempt failure. We carry out an extensive analysis of the queue, including a necessary and sufficient condition for the system to be stable, the steady state distribution of the server state and the orbit length, the waiting time distribution, the busy period, and other related quantities. Finally, we study the joint distribution of the server state and the orbit length in non‐stationary regime. © 1999 John Wiley & Sons, Inc. Naval Research Logistics 46: 561–581, 1999  相似文献   
175.
We consider the problem of determining the capacity to assign to each arc in a given network, subject to uncertainty in the supply and/or demand of each node. This design problem underlies many real‐world applications, such as the design of power transmission and telecommunications networks. We first consider the case where a set of supply/demand scenarios are provided, and we must determine the minimum‐cost set of arc capacities such that a feasible flow exists for each scenario. We briefly review existing theoretical approaches to solving this problem and explore implementation strategies to reduce run times. With this as a foundation, our primary focus is on a chance‐constrained version of the problem in which α% of the scenarios must be feasible under the chosen capacity, where α is a user‐defined parameter and the specific scenarios to be satisfied are not predetermined. We describe an algorithm which utilizes a separation routine for identifying violated cut‐sets which can solve the problem to optimality, and we present computational results. We also present a novel greedy algorithm, our primary contribution, which can be used to solve for a high quality heuristic solution. We present computational analysis to evaluate the performance of our proposed approaches. © 2016 Wiley Periodicals, Inc. Naval Research Logistics 63: 236–246, 2016  相似文献   
176.
We consider the problem of scheduling n independent and simultaneously available jobs without preemption on a single machine, where the machine has a fixed maintenance activity. The objective is to find the optimal job sequence to minimize the total amount of late work, where the late work of a job is the amount of processing of the job that is performed after its due date. We first discuss the approximability of the problem. We then develop two pseudo‐polynomial dynamic programming algorithms and a fully polynomial‐time approximation scheme for the problem. Finally, we conduct extensive numerical studies to evaluate the performance of the proposed algorithms. © 2016 Wiley Periodicals, Inc. Naval Research Logistics 63: 172–183, 2016  相似文献   
177.
The warehouse problem with deterministic production cost, selling prices, and demand was introduced in the 1950s and there is a renewed interest recently due to its applications in energy storage and arbitrage. In this paper, we consider two extensions of the warehouse problem and develop efficient computational algorithms for finding their optimal solutions. First, we consider a model where the firm can invest in capacity expansion projects for the warehouse while simultaneously making production and sales decisions in each period. We show that this problem can be solved with a computational complexity that is linear in the product of the length of the planning horizon and the number of capacity expansion projects. We then consider a problem in which the firm can invest to improve production cost efficiency while simultaneously making production and sales decisions in each period. The resulting optimization problem is non‐convex with integer decision variables. We show that, under some mild conditions on the cost data, the problem can be solved in linear computational time. © 2016 Wiley Periodicals, Inc. Naval Research Logistics 63: 367–373, 2016  相似文献   
178.
This article considers the empty vehicle redistribution problem in a hub‐and‐spoke transportation system, with random demands and stochastic transportation times. An event‐driven model is formulated, which yields the implicit optimal control policy. Based on the analytical results for two‐depot systems, a dynamic decomposition procedure is presented which produces a near‐optimal policy with linear computational complexity in terms of the number of spokes. The resulting policy has the same asymptotic behavior as that of the optimal policy. It is found that the threshold‐type control policy is not usually optimal in such systems. The results are illustrated through small‐scale numerical examples. Through simulation the robustness of the dynamic decomposition policy is tested using a variety of scenarios: more spokes, more vehicles, different combinations of distribution types for the empty vehicle travel times and loaded vehicle arrivals. This shows that the dynamic decomposition policy is significantly better than a heuristics policy in all scenarios and appears to be robust to the assumptions of the distribution types. © 2008 Wiley Periodicals, Inc. Naval Research Logistics, 2008  相似文献   
179.
In order‐quantity reorder‐point formulations for inventory items where backordering is allowed, some of the more common ways to prevent excessive stockouts in an optimal solution are to impose either a cost per unit short, a cost per stockout occasion, or a target fill rate. We show that these popular formulations, both exact and approximate, can become “degenerate” even with quite plausible parameters. By degeneracy we mean any situation in which the formulation either cannot be solved, leads to nonsensical “optimal” solutions, or becomes equivalent to something substantially simpler. We explain the reasons for the degeneracies, yielding new insight into these models, and we provide practical advice for inventory managers. © 2002 Wiley Periodicals, Inc. Naval Research Logistics 49: 686–705, 2002; Published online in Wiley InterScience (www.interscience.wiley.com). DOI 10.1002/nav.10037  相似文献   
180.
Estimation of warranty costs, in the event of product failure within the warranty period, is of importance to the manufacturer. Costs associated with replacement or repair of the product are usually drawn from a warranty reserve fund created by the manufacturer. Considering a stochastic sales process, first and second moments (and thereby the variance) are derived for the manufacturer's total discounted warranty cost of a single sale for single‐component items under four different warranty policies from a manufacturer's point of view. These servicing strategies represent a renewable free‐replacement, nonrenewable free‐replacement, renewable pro‐rata, and a nonrenewable minimal‐repair warranty plans. The results are extended to determine the mean and variance of total discounted warranty costs for the total sales over the life cycle of the product. Furthermore, using a normal approximation, warranty reserves necessary for a certain protection level, so that reserves are not completely depleted, are found. Results and their managerial implications are studied through an extensive example. © 2002 Wiley Periodicals, Inc. Naval Research Logistics 49: 499–513, 2002; Published online in Wiley InterScience (www.interscience.wiley.com). DOI 10.1002/nav.10023  相似文献   
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号