首页 | 本学科首页   官方微博 | 高级检索  
文章检索
  按 检索   检索词:      
出版年份:   被引次数:   他引次数: 提示:输入*表示无穷大
  收费全文   60篇
  免费   1篇
  2021年   1篇
  2019年   3篇
  2017年   2篇
  2016年   7篇
  2015年   2篇
  2013年   18篇
  2012年   1篇
  2011年   2篇
  2009年   1篇
  2008年   3篇
  2007年   1篇
  2006年   3篇
  2005年   3篇
  2004年   3篇
  2002年   2篇
  2001年   1篇
  2000年   1篇
  1997年   1篇
  1986年   1篇
  1983年   1篇
  1982年   1篇
  1980年   1篇
  1977年   1篇
  1971年   1篇
排序方式: 共有61条查询结果,搜索用时 31 毫秒
41.
42.
We present a validation of a centralized feedback control law for robotic or partially robotic water craft whose task is to defend a harbor from an intruding fleet of water craft. Our work was motivated by the need to provide harbor defenses against hostile, possibly suicidal intruders, preferably using unmanned craft to limit potential casualties. Our feedback control law is a sample‐data receding horizon control law, which requires the solution of a complex max‐min problem at the start of each sample time. In developing this control law, we had to deal with three challenges. The first was to develop a max‐min problem that captures realistically the nature of the defense‐intrusion game. The second was to ensure the solution of this max‐min problem can be accomplished in a small fraction of the sample time that would be needed to control a possibly fast moving craft. The third, to which this article is dedicated, was to validate the effectiveness of our control law first through computer simulations pitting a computer against a computer or a computer against a human, then through the use of model hovercraft in a laboratory, and finally on the Chesapeake Bay, using Yard Patrol boats. © 2016 Wiley Periodicals, Inc. Naval Research Logistics 63: 247–259, 2016  相似文献   
43.
In this article, we define two different workforce leveling objectives for serial transfer lines. Each job is to be processed on each transfer station for c time periods (e.g., hours). We assume that the number of workers needed to complete each operation of a job in precisely c periods is given. Jobs transfer forward synchronously after every production cycle (i.e., c periods). We study two leveling objectives: maximin workforce size () and min range (R). Leveling objectives produce schedules where the cumulative number of workers needed in all stations of a transfer line does not experience dramatic changes from one production cycle to the next. For and a two‐station system, we develop a fast polynomial algorithm. The range problem is known to be NP‐complete. For the two‐station system, we develop a very fast optimal algorithm that uses a tight lower bound and an efficient procedure for finding complementary Hamiltonian cycles in bipartite graphs. Via a computational experiment, we demonstrate that range schedules are superior because not only do they limit the workforce fluctuations from one production cycle to the next, but they also do so with a minor increase in the total workforce size. We extend our results to the m‐station system and develop heuristic algorithms. We find that these heuristics work poorly for min range (R), which indicates that special structural properties of the m‐station problem need to be identified before we can develop efficient algorithms. © 2016 Wiley Periodicals, Inc. Naval Research Logistics 63: 577–590, 2016  相似文献   
44.
In this paper we analyze a two‐period supply contract which allows for order adjustment by the buyer. The buyer is required to place orders for two periods. After observing initial demand, the buyer is then allowed to adjust the second order, paying a per unit order adjustment penalty. We describe the optimal behavior of the buyer under such a contract, both in determining the initial order quantities and in subsequently adjusting the order. We compare the solution to a contract where no adjustment is allowed and to the case where adjustment is allowed without penalty. We demonstrate that flexible contracts can reduce the potentially negative effect of correlation of demand between two periods. Further, we investigate how the duration of the first period vis‐à‐vis the second period affects the profitability of the buyer as a function of the degree of correlation. © 2002 John Wiley & Sons, Inc. Naval Research Logistics, 49: 25–45, 2002; DOI 10.1002/nav.10002  相似文献   
45.
One way of achieving the increased levels of system reliability and availability demanded by critical computer-based control systems is through the use of fault-tolerant distributed computer systems. This article addresses the problem of allocating a set of m tasks among a set of n processors in a manner that will satisfy various task assignment, system capacity, and task scheduling constraints while balancing the workload across processors. We discuss problem background, problem formulation, and a known heuristic procedure for the problem. A new solution-improving heuristic procedure is introduced, and computational experience with the heuristics is presented. With only a modest increase in the amount of computational effort, the new procedure is demonstrated to improve dramatically solution quality as well as obtain near-optimal solutions to the test problems.  相似文献   
46.
This paper provides an overview of the Computer-Assisted Search Planning (CASP) system developed for the United States Coast Guard. The CASP information processing methodology is based upon Monte Carlo simulation to obtain an initial probability distribution for target location and to update this distribution to account for drift due to currents and winds. A multiple scenario approach is employed to generate the initial probability distribution. Bayesian updating is used to reflect negative information obtained from unsuccessful search. The principal output of the CASP system is a sequence of probability “maps” which display the current target location probability distributions throughout the time period of interest. CASP also provides guidance for allocating search effort based upon optimal search theory.  相似文献   
47.
This paper presents a comprehensive review of the research studies on direct energy system effect on aircraft composite structures to develop a good understanding of state-of-the-art research and devel-opment in this area. The review begins with the application of composite materials in the aircraft structures and highlights their particular areas of application and limitations. An overview of directed energy system is given. Some of the commonly used systems in this category are discussed and the working principles of laser energy systems are described. The experimental and numerical studies re-ported regarding the aircraft composite structures subject to the effect of directed energy systems, especially the laser systems are reviewed in detail. In particularly, the general effects of laser systems and the relevant damage mechanisms against the composite structures are reported. The review draws attention to the recent research and findings in this field and is expected to guide engineers/researchers in future theoretical, numerical, and experimental studies.  相似文献   
48.
49.
50.
This article generalizes the dynamic and stochastic knapsack problem by allowing the decision‐maker to postpone the accept/reject decision for an item and maintain a queue of waiting items to be considered later. Postponed decisions are penalized with delay costs, while idle capacity incurs a holding cost. This generalization addresses applications where requests of scarce resources can be delayed, for example, dispatching in logistics and allocation of funding to investments. We model the problem as a Markov decision process and analyze it through dynamic programming. We show that the optimal policy with homogeneous‐sized items possesses a bithreshold structure, despite the high dimensionality of the decision space. Finally, the value (or price) of postponement is illustrated through numerical examples. © 2015 Wiley Periodicals, Inc. Naval Research Logistics 62: 267–292, 2015  相似文献   
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号