首页 | 本学科首页   官方微博 | 高级检索  
文章检索
  按 检索   检索词:      
出版年份:   被引次数:   他引次数: 提示:输入*表示无穷大
  收费全文   327篇
  免费   48篇
  2021年   2篇
  2019年   11篇
  2018年   4篇
  2017年   15篇
  2016年   19篇
  2015年   15篇
  2014年   15篇
  2013年   67篇
  2012年   14篇
  2011年   20篇
  2010年   21篇
  2009年   18篇
  2008年   21篇
  2007年   31篇
  2006年   20篇
  2005年   14篇
  2004年   18篇
  2003年   12篇
  2002年   14篇
  2001年   10篇
  2000年   11篇
  1999年   3篇
排序方式: 共有375条查询结果,搜索用时 557 毫秒
61.
In this paper, two different kinds of (N, T)‐policies for an M/M/m queueing system are studied. The system operates only intermittently and is shut down when no customers are present any more. A fixed setup cost of K > 0 is incurred each time the system is reopened. Also, a holding cost of h > 0 per unit time is incurred for each customer present. The two (N, T)‐policies studied for this queueing system with cost structures are as follows: (1) The system is reactivated as soon as N customers are present or the waiting time of the leading customer reaches a predefined time T, and (2) the system is reactivated as soon as N customers are present or the time units after the end of the last busy period reaches a predefined time T. The equations satisfied by the optimal policy (N*, T*) for minimizing the long‐run average cost per unit time in both cases are obtained. Particularly, we obtain the explicit optimal joint policy (N*, T*) and optimal objective value for the case of a single server, the explicit optimal policy N* and optimal objective value for the case of multiple servers when only predefined customers number N is measured, and the explicit optimal policy T* and optimal objective value for the case of multiple servers when only predefined time units T is measured, respectively. These results partly extend (1) the classic N or T policy to a more practical (N, T)‐policy and (2) the conclusions obtained for single server system to a system consisting of m (m ≥ 1) servers. © 2000 John Wiley & Sons, Inc. Naval Research Logistics 47: 240–258, 2000  相似文献   
62.
In this short note we study a two‐machine flowshop scheduling problem with the additional no‐idle feasibility constraint and the total completion time criterion function. We show that one of the few papers which deal with this special problem contains incorrect claims and suggest a way how these claims can be rectified. © 2000 John Wiley & Sons, Inc. Naval Research Logistics 47:353–358, 2000  相似文献   
63.
The coordination of production, supply, and distribution is an important issue in logistics and operations management. This paper develops and analyzes a single‐machine scheduling model that incorporates the scheduling of jobs and the pickup and delivery arrangements of the materials and finished jobs. In this model, there is a capacitated pickup and delivery vehicle that travels between the machine and the storage area, and the objective is to minimize the makespan of the schedule. The problem is strongly NP‐hard in general but is solvable in polynomial time when the job processing sequence is predetermined. An efficient heuristic is developed for the general problem. The effectiveness of the heuristic is studied both analytically and computationally. © 2005 Wiley Periodicals, Inc. Naval Research Logistics, 2005.  相似文献   
64.
This paper reports on a study using the available oil monitoring information, such as the data obtained using the Spectrometric Oil Analysis Programme (SOAP), to predict the residual life of a set of aircraft engines. The relationship between oil monitoring information and the residual life is established using the concept of the proportional residual, which states that the predicted residual life may be proportional to the wear increment measured by the oil analysis programmes. Assuming such a relationship between wear and the residual life exists, we formulated a recursive prediction model for the item's residual life given measured oil monitoring information to date. A set of censored life data of 30 aircraft engines (right censored due to preventive overhaul) along with the history of their monitored metal concentration information are available to us. The metal concentration information includes many variables, such as Fe, Cu, Al, etc.; not all of them are useful, and some of them may be correlated. The principal component analysis (PCA) has been adopted to reduce the dimension of the original data set and to produce a new set of uncorrelated variables, which we shall use in the prediction model. The procedure associated with estimating model parameters is discussed. The model is fitted to the actual SOAP data from the aircraft engines, and the goodness‐of‐fit test has been carried out. © 2005 Wiley Periodicals, Inc. Naval Research Logistics, 2005.  相似文献   
65.
We study a stochastic outpatient appointment scheduling problem (SOASP) in which we need to design a schedule and an adaptive rescheduling (i.e., resequencing or declining) policy for a set of patients. Each patient has a known type and associated probability distributions of random service duration and random arrival time. Finding a provably optimal solution to this problem requires solving a multistage stochastic mixed‐integer program (MSMIP) with a schedule optimization problem solved at each stage, determining the optimal rescheduling policy over the various random service durations and arrival times. In recognition that this MSMIP is intractable, we first consider a two‐stage model (TSM) that relaxes the nonanticipativity constraints of MSMIP and so yields a lower bound. Second, we derive a set of valid inequalities to strengthen and improve the solvability of the TSM formulation. Third, we obtain an upper bound for the MSMIP by solving the TSM under the feasible (and easily implementable) appointment order (AO) policy, which requires that patients are served in the order of their scheduled appointments, independent of their actual arrival times. Fourth, we propose a Monte Carlo approach to evaluate the relative gap between the MSMIP upper and lower bounds. Finally, in a series of numerical experiments, we show that these two bounds are very close in a wide range of SOASP instances, demonstrating the near‐optimality of the AO policy. We also identify parameter settings that result in a large gap in between these two bounds. Accordingly, we propose an alternative policy based on neighbor‐swapping. We demonstrate that this alternative policy leads to a much tighter upper bound and significantly shrinks the gap.  相似文献   
66.
While there has been significant previous literature on inventory transshipment, most research has focused on the dealers' demand filling decision (when to fill transshipment requests from other dealers), ignoring the requesting decision (when to send transshipment requests to other dealers). In this paper we develop optimal inventory transshipment policies that incorporate both types of decisions. We consider a decentralized system in which the dealers are independent of the manufacturer and of each other. We first study a network consisting of a very large number of dealers. We prove that the optimal inventory and transshipment decisions for an individual dealer are controlled by threshold rationing and requesting levels. Then, in order to study the impact of transshipment among independent dealers in a smaller dealer network, we consider a decentralized two‐dealer network and use a game theoretic approach to characterize the equilibrium inventory strategies of the individual dealers. An extensive numerical study highlights the impact of the requesting decision on the dealers' equilibrium behavior in a decentralized setting. © 2006 Wiley Periodicals, Inc. Naval Research Logistics, 2006  相似文献   
67.
We study optimal age‐replacement policies for machines in series with non‐instantaneous repair times by formulating two nonlinear programs: one that minimizes total cost‐rate subject to a steady‐state throughput requirement and another that maximizes steady‐state throughput subject to a cost‐rate budget constraint. Under reasonable assumptions, the single‐machine cost‐optimal and throughput‐optimal solutions are unique and orderable, and the multi‐machine optimal solutions have appealing structure. Furthermore, we establish equivalence between the two formulations and provide an illustrative numerical example. © 2006 Wiley Periodicals, Inc. Naval Research Logistics, 2006  相似文献   
68.
Burn‐in procedure is a manufacturing technique that is intended to eliminate early failures of system or product. Burning‐in a component or system means to subject it to a period of use prior to being used in field. Generally, burn‐in is considered expensive and so the length of burn‐in is typically limited. Thus, burn‐in is most often accomplished in an accelerated environment in order to shorten the burn‐in process. A new failure rate model for an accelerated burn‐in procedure, which incorporates the accelerated ageing process induced by the accelerated environmental stress, is proposed. Under a more general assumption on the shape of failure rate function of products, which includes the traditional bathtub‐shaped failure rate function as a special case, upper bounds for optimal burn‐in time will be derived. A numerical example will also be given for illustration. © 2006 Wiley Periodicals, Inc. Naval Research Logistics, 2006  相似文献   
69.
We consider the problem of scheduling orders on identical machines in parallel. Each order consists of one or more individual jobs. A job that belongs to an order can be processed by any one of the machines. Multiple machines can process the jobs of an order concurrently. No setup is required if a machine switches over from one job to another. Each order is released at time zero and has a positive weight. Preemptions are not allowed. The completion time of an order is the time at which all jobs of that order have been completed. The objective is to minimize the total weighted completion time of the orders. The problem is NP‐hard for any fixed number (≥2) of machines. Because of this, we focus our attention on two classes of heuristics, which we refer to as sequential two‐phase heuristics and dynamic two‐phase heuristics. We perform a worst case analysis as well as an empirical analysis of nine heuristics. Our analyses enable us to rank these heuristics according to their effectiveness, taking solution quality as well as running time into account. © 2006 Wiley Periodicals, Inc. Naval Research Logistics, 2006  相似文献   
70.
The (standard) randomization method is an attractive alternative for the transient analysis of continuous time Markov models. The main advantages of the method are numerical stability, well‐controlled computation error, and ability to specify the computation error in advance. However, the fact that the method can be computationally very expensive limits its applicability. In this paper, we develop a new method called split regenerative randomization, which, having the same good properties as standard randomization, can be significantly more efficient. The method covers reliability‐like models with a particular but quite general structure and requires the selection of a subset of states and a regenerative state satisfying some conditions. For a class of continuous time Markov models, model class C2, including typical failure/repair reliability‐like models with exponential failure and repair time distributions and deferred repair, natural selections are available for both the subset of states and the regenerative state and, for those natural selections, theoretical results are available assessing the efficiency of the method in terms of “visible” model characteristics. Those results can be used to anticipate when the method can be expected to be competitive. We illustrate the application of the method using a large class C2 model and show that for models in that class the method can indeed be significantly more efficient than previously available randomization‐based methods. © 2006 Wiley Periodicals, Inc. Naval Research Logistics, 2006  相似文献   
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号