首页 | 本学科首页   官方微博 | 高级检索  
文章检索
  按 检索   检索词:      
出版年份:   被引次数:   他引次数: 提示:输入*表示无穷大
  收费全文   28篇
  免费   20篇
  2021年   3篇
  2020年   2篇
  2019年   2篇
  2018年   1篇
  2017年   6篇
  2016年   3篇
  2015年   4篇
  2014年   2篇
  2013年   2篇
  2012年   1篇
  2011年   1篇
  2010年   2篇
  2009年   5篇
  2008年   2篇
  2007年   3篇
  2005年   5篇
  2003年   2篇
  2002年   1篇
  1998年   1篇
排序方式: 共有48条查询结果,搜索用时 46 毫秒
11.
针对当前具有吞吐量和时延约束的软件无线电波形部署决策算法在内存开销方面考虑的不足,提出一个更为通用的波形部署决策系统模型,将波形的处理开销、内存开销和通信带宽开销都纳入到波形部署决策过程中,并设计了一种基于动态规划的波形部署决策算法以最小化波形对平台各种计算资源的占用总和。仿真结果表明,内存对波形部署决策具有重要影响,与未考虑内存开销的解决方案相比,平台支持的平均最大波形数目和平均处理资源利用率均下降40%左右。  相似文献   
12.
This article provides an efficient heuristic based on decomposition for the twin robots scheduling problem (TRSP). TRSP concerns two moving robots executing storage and retrieval requests in parallel along a shared pathway. The depots are located at both ends of the line and a dedicated robot is assigned to each of them. While moving goods between their respective depots and some storage locations on the line, noncrossing constraints among robots need to be considered. Our heuristic uses a dynamic programming framework to determine the schedule of one robot while keeping the other one's fixed. It finds near‐optimal solutions even for large problem instances with hundreds of jobs in a short time span. © 2014 Wiley Periodicals, Inc. 62:16–22, 2015  相似文献   
13.
中继卫星调度问题的CSP模型   总被引:11,自引:2,他引:9       下载免费PDF全文
中继卫星在地球同步静止轨道上运行,既能直视中、低轨道用户航天器,又能直视地面站,是沟通用户航天器与地面站的桥梁。中继卫星调度问题是一类非常重要的调度问题。基于约束满足理论,通过分析中继卫星调度问题的特点与约束条件,建立了中继卫星调度问题的CSP模型。利用卫星工具箱STK进行模拟仿真,对CSP模型进行了求解。结果表明,所建立的CSP模型是合理的。  相似文献   
14.
为了提高风场干扰环境下飞艇的导航精度,研究飞艇抗风场干扰导航算法。在建立风场干扰条件下飞艇速度误差约束模型的基础上,设计抗风场干扰的约束Unscented卡尔曼滤波算法。首先确定风场干扰条件下飞艇的速度误差约束量,将该约束与Unscented卡尔曼滤波算法相结合,对速度误差进行估计和补偿,以减小风场对飞艇定位精度的影响;然后证明该算法的状态估计量不仅是无偏的,而且协方差小于标准UKF的协方差;最后将提出的算法应用于捷联惯导/天文/合成孔径雷达组合导航系统中进行仿真验证,并与自适应扩展卡尔曼滤波和抗差自适应UKF算法进行比较,结果表明:提出的约束UKF算法的滤波性能明显优于自适应EKF和抗差自适应UKF算法,能够有效抑制风场对飞艇定位精度的影响,提高飞艇的导航定位精度。  相似文献   
15.
We consider the scheduling of large‐scale projects to maximize the project net present value given temporal and resource constraints. The net present value objective emphasizes the financial aspects of project management. Temporal constraints between the start times of activities make it possible to handle practical problem assumptions. Scarce resources are an expression of rising cost. Since optimization techniques are not expedient to solve such problems and most heuristic methods known from literature cannot deal with general temporal constraints, we propose a new bidirectional priority‐rule based method. Scheduling activities with positive cash flows as early and activities with negative cash flows as late as possible results in a method which is completed by unscheduling techniques to cope with scarce resources. In a computational experiment, we compare the well‐known serial generation scheme where all activities are scheduled as early as possible with the proposed bidirectional approach. On the basis of a comprehensive data set known from literature containing instances with up to 1002 activities, the efficiency of the new approach is demonstrated. © 2003 Wiley Periodicals, Inc. Naval Research Logistics, 2003  相似文献   
16.
针对电磁探测卫星的特点,考虑其主要约束条件,建立了多星联合规划数学模型,提出了基于遗传算法的电磁探测卫星多星规划算法.为处理遗传算法迭代过程中产生的不可行解,引入了基于罚函数法的约束处理方法.针对罚函数法中惩罚系数难以确定的特点,设计了惩罚系数自适应调整的动态罚函数机制.根据模拟的数据进行实验及分析,表明该方法能有效解决电磁探测卫星多星规划问题.  相似文献   
17.
We consider the problem of finding the system with the best primary performance measure among a finite number of simulated systems in the presence of a stochastic constraint on a single real‐valued secondary performance measure. Solving this problem requires the identification and removal from consideration of infeasible systems (Phase I) and of systems whose primary performance measure is dominated by that of other feasible systems (Phase II). We use indifference zones in both phases and consider two approaches, namely, carrying out Phases I and II sequentially and carrying out Phases I and II simultaneously, and we provide specific example procedures of each type. We present theoretical results guaranteeing that our approaches (general and specific, sequential and simultaneous) yield the best system with at least a prespecified probability, and we provide a portion of an extensive numerical study aimed at evaluating and comparing the performance of our approaches. The experimental results show that both new procedures are useful for constrained ranking and selection, with neither procedure showing uniform superiority over the other.© 2010 Wiley Periodicals, Inc. Naval Research Logistics, 2010  相似文献   
18.
This article describes a polynomial transformation for a class of unit‐demand vehicle routing problems, named node‐balanced routing problems (BRP), where the number of nodes on each route is restricted to be in an interval such that the workload across the routes is balanced. The transformation is general in that it can be applied to single or multiple depot, homogeneous or heterogeneous fleet BRPs, and any combination thereof. At the heart of the procedure lies transforming the BRP into a generalized traveling salesman problem (TSP), which can then be transformed into a TSP. The transformed graph exhibits special properties which can be exploited to significantly reduce the number of arcs, and used to construct a formulation for the resulting TSP that amounts to no more than that of a constrained assignment problem. Computational results on a number of instances are presented. © 2015 Wiley Periodicals, Inc. Naval Research Logistics 62: 370–387, 2015  相似文献   
19.
This study introduces one modeling methodology that describes a broad range of multiple stage production planning issues, including multiple limited resources with setup times and joint fixed cost relationships. An existing production system is modeled in this fashion, creating a new set of 1350 highly generalized benchmark problems. A computational study is conducted with the 1350 benchmark problems introduced in this paper and 2100 benchmark problems, with more restrictive assumptions, from the existing literature. The relative merits of a decomposition‐based algorithm and a neighborhood search technique known as NIPPA, or the Non‐sequential Incremental Part Period Algorithm, are assessed. NIPPA is generally the more successful of the two techniques, although there are specific instances in which the decomposition‐based algorithm displayed a distinct advantage. © 2005 Wiley Periodicals, Inc. Naval Research Logistics, 2005  相似文献   
20.
高层建筑火灾具有火灾蔓延途径多、火灾荷载大、扑救难度大等特点,易造成群死群伤的严重后果。在火灾扑救中,主要有举高消防车的高度、出警速度极限、人员疏散与战斗进攻路线、战斗员体能和火场供水等五个方面的限制因素。从实战出发,提出了增强高层建筑火灾灭火救援能力应采取的措施。  相似文献   
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号