首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 31 毫秒
1.
This article treats the problem of scheduling multiple cranes processing jobs along a line, where cranes are divided into different groups and only cranes in the same group can interfere with each other. Such crane scheduling problems occur, for example, at indented berths or in container yards where double rail‐mounted gantry cranes stack containers such that cranes of the same size can interfere with each other but small cranes can pass underneath larger ones. We propose a novel algorithm based on Benders decomposition to solve this problem to optimality. In a computational study, it is shown that this algorithm solves small and medium‐sized instances and even many large instances within a few seconds or minutes. Moreover, it improves several best known solutions from the literature with regard to the simpler problem version with only one crane group. We also look into whether investment in more complicated crane configurations with multiple crane groups is actually worthwhile.  相似文献   

2.
In this paper we propose some non‐greedy heuristics and develop an Augmented‐Neural‐Network (AugNN) formulation for solving the classical open‐shop scheduling problem (OSSP). AugNN is a neural network based meta‐heuristic approach that allows integration of domain‐specific knowledge. The OSSP is framed as a neural network with multiple layers of jobs and machines. Input, output and activation functions are designed to enforce the problem constraints and embed known heuristics to generate a good feasible solution fast. Suitable learning strategies are applied to obtain better neighborhood solutions iteratively. The new heuristics and the AugNN formulation are tested on several benchmark problem instances in the literature and on some new problem instances generated in this study. The results are very competitive with other meta‐heuristic approaches, both in terms of solution quality and computational times. © 2005 Wiley Periodicals, Inc. Naval Research Logistics, 2005.  相似文献   

3.
针对花朵授粉算法易陷入局部极值、收敛速度慢等不足,提出一种具有族群机制的花朵授粉算法。该算法把种群分成多个族群,各族群的最优个体再组成新的种群,进而促进种群间的信息交流,有效地协调种群进化过程中的全局搜索和局部搜索能力,避免个体的早熟收敛,提高算法的全局寻优能力及收敛速度。通过8个CEC2005benchmark测试函数进行测试比较,仿真结果表明,改进算法的寻优性能明显优于基本的花朵授粉算法、粒子群算法和蝙蝠算法,其收敛精度、收敛速度、鲁棒性均较对比算法有较大提高。  相似文献   

4.
In this paper we consider the problem of scheduling a set of jobs on a single machine on which a rate‐modifying activity may be performed. The rate‐modifying activity is an activity that changes the production rate of the machine. So the processing time of a job is a variable, which depends on whether it is scheduled before or after the rate‐modifying activity. We assume that the rate‐modifying activity can take place only at certain predetermined time points, which is a constrained case of a similar problem discussed in the literature. The decisions under consideration are whether and when to schedule the rate‐modifying activity, and how to sequence the jobs in order to minimize some objectives. We study the problems of minimizing makespan and total completion time. We first analyze the computational complexity of both problems for most of the possible versions. The analysis shows that the problems are NP‐hard even for some special cases. Furthermore, for the NP‐hard cases of the makespan problem, we present a pseudo‐polynomial time optimal algorithm and a fully polynomial time approximation scheme. For the total completion time problem, we provide a pseudo‐polynomial time optimal algorithm for the case with agreeable modifying rates. © 2005 Wiley Periodicals, Inc. Naval Research Logistics, 2005  相似文献   

5.
Despite its ability to result in more effective network plans, the telecommunication network planning problem with signal‐to‐interference ratio constraints gained less attention than the power‐based one because of its complexity. In this article, we provide an exact solution method for this class of problems that combines combinatorial Benders decomposition, classical Benders decomposition, and valid cuts in a nested way. Combinatorial Benders decomposition is first applied, leading to a binary master problem and a mixed integer subproblem. The subproblem is then decomposed using classical Benders decomposition. The algorithm is enhanced using valid cuts that are generated at the classical Benders subproblem and are added to the combinatorial Benders master problem. The valid cuts proved efficient in reducing the number of times the combinatorial Benders master problem is solved and in reducing the overall computational time. More than 120 instances of the W‐CDMA network planning problem ranging from 20 demand points and 10 base stations to 140 demand points and 30 base stations are solved to optimality. © 2010 Wiley Periodicals, Inc. Naval Research Logistics, 2010  相似文献   

6.
We describe the application of a decomposition based solution method to a class of network interdiction problems. The problem of maximizing the probability of sufficient disruption of the flow of information or goods in a network whose characteristics are not certain is shown to be solved effectively by applying a scenario decomposition method developed by Riis and Schultz [Comput Optim Appl 24 (2003), 267–287]. Computational results demonstrate the effectiveness of the algorithm and design decisions that result in speed improvements. © 2005 Wiley Periodicals, Inc. Naval Research Logistics, 2005.  相似文献   

7.
Capacity planning decisions affect a significant portion of future revenue. In the semiconductor industry, they need to be made in the presence of both highly volatile demand and long capacity installation lead‐times. In contrast to traditional discrete‐time models, we present a continuous‐time stochastic programming model for multiple resource types and product families. We show how this approach can solve capacity planning problems of reasonable size and complexity with provable efficiency. This is achieved by an application of the divide‐and‐conquer algorithm, convexity, submodularity, and the open‐pit mining problem. © 2005 Wiley Periodicals, Inc. Naval Research Logistics, 2005.  相似文献   

8.
Many important problems in Operations Research and Statistics require the computation of nondominated (or Pareto or efficient) sets. This task may be currently undertaken efficiently for discrete sets of alternatives or for continuous sets under special and fairly tight structural conditions. Under more general continuous settings, parametric characterisations of the nondominated set, for example through convex combinations of the objective functions or ε‐constrained problems, or discretizations‐based approaches, pose several problems. In this paper, the lack of a general approach to approximate the nondominated set in continuous multiobjective problems is addressed. Our simulation‐based procedure only requires to sample from the set of alternatives and check whether an alternative dominates another. Stopping rules, efficient sampling schemes, and procedures to check for dominance are proposed. A continuous approximation to the nondominated set is obtained by fitting a surface through the points of a discrete approximation, using a local (robust) regression method. Other actions like clustering and projecting points onto the frontier are required in nonconvex feasible regions and nonconnected Pareto sets. In a sense, our method may be seen as an evolutionary algorithm with a variable population size. © 2005 Wiley Periodicals, Inc. Naval Research Logistics, 2005.  相似文献   

9.
In this article, we propose a branch‐and‐price‐and‐cut (BPC) algorithm to exactly solve the manpower routing problem with synchronization constraints (MRPSC). Compared with the classical vehicle routing problems (VRPs), the defining characteristic of the MRPSC is that multiple workers are required to work together and start at the same time to carry out a job, that is, the routes of the scheduling subjects are dependent. The incorporation of the synchronization constraints increases the difficulty of the MRPSC significantly and makes the existing VRP exact algorithm inapplicable. Although there are many types of valid inequalities for the VRP or its variants, so far we can only adapt the infeasible path elimination inequality and the weak clique inequality to handle the synchronization constraints in our BPC algorithm. The experimental results at the root node of the branch‐and‐bound tree show that the employed inequalities can effectively improve the lower bound of the problem. Compared with ILOG CPLEX, our BPC algorithm managed to find optimal solutions for more test instances within 1 hour. © 2016 Wiley Periodicals, Inc. Naval Research Logistics 63: 138–171, 2016  相似文献   

10.
Capacity planning decisions affect a significant portion of future revenue. In equipment intensive industries, these decisions usually need to be made in the presence of both highly volatile demand and long capacity installation lead times. For a multiple product case, we present a continuous‐time capacity planning model that addresses problems of realistic size and complexity found in current practice. Each product requires specific operations that can be performed by one or more tool groups. We consider a number of capacity allocation policies. We allow tool retirements in addition to purchases because the stochastic demand forecast for each product can be decreasing. We present a cluster‐based heuristic algorithm that can incorporate both variance reduction techniques from the simulation literature and the principles of a generalized maximum flow algorithm from the network optimization literature. © 2005 Wiley Periodicals, Inc. Naval Research Logistics, 2006  相似文献   

11.
Motivated by challenges in the smartphone manufacturing industry, we develop a dynamic production ramp-up model that can be applied to economically satisfy nonstationary demand for short-life-cycle products by high-tech companies. Due to shorter life cycles and more rapid evolution of smartphones, production ramp-up has been increasingly critical to the success of a new smartphone. In the production ramp-up, the key challenge is to match the increasing capacity to nonstationary demand. The high-tech smartphone manufacturers are urged to jointly consider the effect of increasing capacity and decreasing demand. We study the production planning problem using a high-dimensional Markov decision process (MDP) model to characterize the production ramp-up. To address the curse of dimensionality, we refine Monte Carlo tree search (MCTS) algorithm and theoretically analyze its convergence and computational complexity. In a real case study, we find that the MDP model achieves revenue improvement by stopping producing the existing product earlier than the benchmark policy. In synthetic instances, we validate that the proposed MCTS algorithm saves computation time without loss of solution quality compared with traditional value iteration algorithm. As part of the Lenovo production solution, our MDP model enables high-tech smartphone manufacturers to better plan the production ramp-up.  相似文献   

12.
在提升五株形小波多尺度分解的基础上,给出一种新的像素级图像融合方法.该方法利用提升五株形小波变换对每一幅图像进行多尺度分解,按照不同的融合规则,采用多种融合算子去构造融合图像对应的各小波系数,再根据融合图像的各小波系数重构融合图像.该方法被成功地用于模糊图像的融合处理.试验结果表明该融合方法十分有效,获得的融合图像更符合人们的视觉特性、更有利于进行监视和侦察之类的视觉感知.  相似文献   

13.
This paper develops a new model for allocating demand from retailers (or customers) to a set of production/storage facilities. A producer manufactures a product in multiple production facilities, and faces demand from a set of retailers. The objective is to decide which of the production facilities should satisfy each retailer's demand, in order minimize total production, inventory holding, and assignment costs (where the latter may include, for instance, variable production costs and transportation costs). Demand occurs continuously in time at a deterministic rate at each retailer, while each production facility faces fixed‐charge production costs and linear holding costs. We first consider an uncapacitated model, which we generalize to allow for production or storage capacities. We then explore situations with capacity expansion opportunities. Our solution approach employs a column generation procedure, as well as greedy and local improvement heuristic approaches. A broad class of randomly generated test problems demonstrates that these heuristics find high quality solutions for this large‐scale cross‐facility planning problem using a modest amount of computation time. © 2005 Wiley Periodicals, Inc. Naval Research Logistics, 2005.  相似文献   

14.
The optimization framework for optimal sensor placement for underwater threat detection has been developed. It considers single‐period and multiperiod detection models, each of which includes two components: detection algorithm and optimization problem for sensor placement. The detection algorithms for single‐period and multiperiod models are based on likelihood ratio and sequential testing, respectively. For the both models, the optimization problems use the principle of superadditive coverage, which is closely related to energy‐based and information‐based approaches. An algorithm for quasi‐regular sensor placement approximating solutions to the optimization problems has been developed based on corresponding continuous relaxations and a criterion for its applicability has been obtained. Numerical experiments have demonstrated that the algorithm consistently outperforms existing optimization techniques for optimal sensor placement.© 2008 Wiley Periodicals, Inc. Naval Research Logistics, 2008  相似文献   

15.
In networks, there are often more than one sources of capacity. The capacities can be permanently or temporarily owned by the decision maker. Depending on the nature of sources, we identify the permanent capacity, spot market capacity, and contract capacity. We use a scenario tree to model the uncertainty, and build a multi‐stage stochastic integer program that can incorporate multiple sources and multiple types of capacities in a general network. We propose two solution methodologies for the problem. Firstly, we design an asymptotically convergent approximation algorithm. Secondly, we design a cutting plane algorithm based on Benders decomposition to find tight bounds for the problem. The numerical experiments show superb performance of the proposed algorithms compared with commercial software. © 2016 Wiley Periodicals, Inc. Naval Research Logistics 63: 600–614, 2017  相似文献   

16.
We develop an approximate planning model for a distributed computing network in which a control system oversees the assignment of information flows and tasks to a pool of shared computers, and describe several optimization applications using the model. We assume that the computers are multithreaded, and have differing architectures leading to varying and inconsistent processing rates. The model is based on a discrete‐time, continuous flow model developed by Graves [Oper Res 34 (1986), 522–533] which provides the steady‐state moments of production and work‐in‐queue quantities. We make several extensions to Graves' model to represent distributed computing networks. First, we approximately model control rules that are nonlinear functions of the work‐in‐queue at multiple stations through a linearization approach. Second, we introduce an additional noise term on production and show its use in modeling the discretization of jobs. Third, we model groups of heterogeneous computers as aggregate, “virtual computing cells” that process multiple tasks simultaneously, using a judiciously selected control rule. © 2005 Wiley Periodicals, Inc. Naval Research Logistics, 2005.  相似文献   

17.
In many manufacturing environments, equipment condition has a significant impact on product quality, or yield. This paper presents a semi‐Markov decision process model of a single‐stage production system with multiple products and multiple maintenance actions. The model simultaneously determines maintenance and production schedules, accounting for the fact that equipment condition affects the yield of each product differently. It extends earlier work by allowing the expected time between decision epochs to vary by both action and machine state, by allowing multiple maintenance actions, and by treating the outcome of maintenance as less than certain. Sufficient conditions are developed that ensure the monotonicity of both the optimal production and maintenance actions. While the maintenance conditions closely resemble previously studied conditions for this type of problem, the production conditions represent a significant departure from earlier results. The simultaneous solution method is compared to an approach commonly used in industry, where the maintenance and production problems are treated independently. Solving more than one thousand test problems confirms that the combination of both features of the model—accounting for product differences and solving the problems simultaneously—has a significant impact on performance. © 2007 Wiley Periodicals, Inc. Naval Research Logistics, 2008  相似文献   

18.
A joint optimization of the production run length and preventive maintenance (PM) policy is studied for a deteriorating production system where the in‐control period follows a general probability distribution with non‐decreasing failure rate. In the literature, the sufficient conditions for the optimality of the equal‐interval PM schedule is explored to derive an optimal production run length and an optimal number of PM actions. Nevertheless, an exhaustive search may arise. In this study, based on the assumption that the conditions for the optimality of the equal‐interval PM schedule hold, we derive some structural properties for the optimal production/PM policy, which increases the efficiency of the solution procedure. These analyses have implications for the practical application of the production/PM model to be more available in practice. A numerical example of gamma shift distribution with non‐decreasing failure rates is used to illustrate the solution procedure, leading to some insight into the management process. © 2005 Wiley Periodicals, Inc. Naval Research Logistics, 2006  相似文献   

19.
We formulate and solve a discrete‐time path‐optimization problem where a single searcher, operating in a discretized three‐dimensional airspace, looks for a moving target in a finite set of cells. The searcher is constrained by maximum limits on the consumption of one or more resources such as time, fuel, and risk along any path. We develop a specialized branch‐and‐bound algorithm for this problem that uses several network reduction procedures as well as a new bounding technique based on Lagrangian relaxation and network expansion. The resulting algorithm outperforms a state‐of‐the‐art algorithm for solving time‐constrained problems and also is the first algorithm to solve multi‐constrained problems. © 2010 Wiley Periodicals, Inc. Naval Research Logistics, 2010  相似文献   

20.
This paper presents a branch‐and‐price algorithm for scheduling n jobs on m nonhomogeneous parallel machines with multiple time windows. An additional feature of the problem is that each job falls into one of ρ priority classes and may require two operations. The objective is to maximize the weighted number of jobs scheduled, where a job in a higher priority class has “infinitely” more weight or value than a job in a lower priority class. The methodology makes use of a greedy randomized adaptive search procedure (GRASP) to find feasible solutions during implicit enumeration and a two‐cycle elimination heuristic when solving the pricing subproblems. Extensive computational results are presented based on data from an application involving the use of communications relay satellites. Many 100‐job instances that were believed to be beyond the capability of exact methods, were solved within minutes. © 2005 Wiley Periodicals, Inc. Naval Research Logistics, 2006  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号