全文获取类型
收费全文 | 452篇 |
免费 | 142篇 |
国内免费 | 7篇 |
出版年
2023年 | 2篇 |
2022年 | 6篇 |
2021年 | 6篇 |
2020年 | 10篇 |
2019年 | 13篇 |
2018年 | 8篇 |
2017年 | 21篇 |
2016年 | 30篇 |
2015年 | 26篇 |
2014年 | 27篇 |
2013年 | 78篇 |
2012年 | 28篇 |
2011年 | 35篇 |
2010年 | 28篇 |
2009年 | 30篇 |
2008年 | 29篇 |
2007年 | 41篇 |
2006年 | 34篇 |
2005年 | 29篇 |
2004年 | 27篇 |
2003年 | 18篇 |
2002年 | 17篇 |
2001年 | 15篇 |
2000年 | 20篇 |
1999年 | 8篇 |
1998年 | 11篇 |
1997年 | 1篇 |
1995年 | 1篇 |
1994年 | 1篇 |
1991年 | 1篇 |
排序方式: 共有601条查询结果,搜索用时 16 毫秒
51.
In this short note we study a two‐machine flowshop scheduling problem with the additional no‐idle feasibility constraint and the total completion time criterion function. We show that one of the few papers which deal with this special problem contains incorrect claims and suggest a way how these claims can be rectified. © 2000 John Wiley & Sons, Inc. Naval Research Logistics 47:353–358, 2000 相似文献
52.
In this paper we consider the discrete time/resource trade-off problem in project networks. Given a project network consisting of nodes (activities) and arcs (technological precedence relations), in which the duration of the activities is a discrete, nonincreasing function of the amount of a single renewable resource committed to it, the discrete time/resource trade-off problem minimizes the project makespan subject to precedence constraints and a single renewable resource constraint. For each activity, a work content is specified such that all execution modes (duration/resource requirement pairs) for performing the activity are allowed as long as the product of the duration and the resource requirement is at least as large as the specified work content. We present a tabu search procedure which is based on a decomposition of the problem into a mode assignment phase and a resource-constrained project scheduling phase with fixed mode assignments. Extensive computational experience, including a comparison with other local search methods, is reported. © 1998 John Wiley & Sons, Inc. Naval Research Logistics 45: 553–578, 1998 相似文献
53.
We consider a single-machine scheduling model in which the job processing times are controllable variables with linear costs. The objective is to minimize the sum of the cost incurred in compressing job processing times and the cost associated with the number of late jobs. The problem is shown to be NP-hard even when the due dates of all jobs are identical. We present a dynamic programming solution algorithm and a fully polynomial approximation scheme for the problem. Several efficient heuristics are proposed for solving the problem. Computational experiments demonstrate that the heuristics are capable of producing near-optimal solutions quickly. © 1998 John Wiley & Sons, Inc. Naval Research Logistics 45: 67–82, 1998 相似文献
54.
Kenneth R. Baker 《海军后勤学研究》1999,46(8):978-991
This paper examines heuristic solution procedures for scheduling jobs on a single machine to minimize the maximum lateness in the presence of setup times between different job families. It reviews the state of knowledge about the solution of this problem, which is known to be difficult to solve in general, and examines natural solution approaches derived from some of the underlying theory. The emphasis is on the design and computational evaluation of new heuristic procedures. © 1999 John Wiley & Sons, Inc. Naval Research Logistics 46: 978–991, 1999 相似文献
55.
The coordination of production, supply, and distribution is an important issue in logistics and operations management. This paper develops and analyzes a single‐machine scheduling model that incorporates the scheduling of jobs and the pickup and delivery arrangements of the materials and finished jobs. In this model, there is a capacitated pickup and delivery vehicle that travels between the machine and the storage area, and the objective is to minimize the makespan of the schedule. The problem is strongly NP‐hard in general but is solvable in polynomial time when the job processing sequence is predetermined. An efficient heuristic is developed for the general problem. The effectiveness of the heuristic is studied both analytically and computationally. © 2005 Wiley Periodicals, Inc. Naval Research Logistics, 2005. 相似文献
56.
In this paper we propose some non‐greedy heuristics and develop an Augmented‐Neural‐Network (AugNN) formulation for solving the classical open‐shop scheduling problem (OSSP). AugNN is a neural network based meta‐heuristic approach that allows integration of domain‐specific knowledge. The OSSP is framed as a neural network with multiple layers of jobs and machines. Input, output and activation functions are designed to enforce the problem constraints and embed known heuristics to generate a good feasible solution fast. Suitable learning strategies are applied to obtain better neighborhood solutions iteratively. The new heuristics and the AugNN formulation are tested on several benchmark problem instances in the literature and on some new problem instances generated in this study. The results are very competitive with other meta‐heuristic approaches, both in terms of solution quality and computational times. © 2005 Wiley Periodicals, Inc. Naval Research Logistics, 2005. 相似文献
57.
Xiangtong Qi 《海军后勤学研究》2005,52(4):312-320
Logistics scheduling refers to the problems where the decisions of job scheduling and transportation are integrated in a single framework. In this paper, we discuss a logistics scheduling model where the raw material is delivered to the shop in batches. By making the batching and scheduling decisions simultaneously, the total inventory and batch setup cost can be reduced. We study different models on this issue, present complexity analysis and optimal algorithms, and conduct computational experiments. Some managerial insights are observed. © 2005 Wiley Periodicals, Inc. Naval Research Logistics, 2005. 相似文献
58.
This paper reports on a study using the available oil monitoring information, such as the data obtained using the Spectrometric Oil Analysis Programme (SOAP), to predict the residual life of a set of aircraft engines. The relationship between oil monitoring information and the residual life is established using the concept of the proportional residual, which states that the predicted residual life may be proportional to the wear increment measured by the oil analysis programmes. Assuming such a relationship between wear and the residual life exists, we formulated a recursive prediction model for the item's residual life given measured oil monitoring information to date. A set of censored life data of 30 aircraft engines (right censored due to preventive overhaul) along with the history of their monitored metal concentration information are available to us. The metal concentration information includes many variables, such as Fe, Cu, Al, etc.; not all of them are useful, and some of them may be correlated. The principal component analysis (PCA) has been adopted to reduce the dimension of the original data set and to produce a new set of uncorrelated variables, which we shall use in the prediction model. The procedure associated with estimating model parameters is discussed. The model is fitted to the actual SOAP data from the aircraft engines, and the goodness‐of‐fit test has been carried out. © 2005 Wiley Periodicals, Inc. Naval Research Logistics, 2005. 相似文献
59.
总结分析了现阶段流行的实时磁盘调度算法,针对磁盘的存储特性,在对任务请求的磁盘访问时间精确预估的基础上,提出了一种新的调度算法-DSJIT(diskjustintime).该算法通过对请求文件在磁盘上分布的预分析得出处理请求所需时间的一个精确预估值,然后根据此预估值再对任务队列进行调度调整,它在保证应用程序对磁盘工作实时要求的同时,尽可能地提高磁盘的吞吐量.最后通过模拟试验,验证了算法的有效性. 相似文献
60.