排序方式: 共有148条查询结果,搜索用时 109 毫秒
51.
52.
We consider scheduling problems involving two agents (agents A and B), each having a set of jobs that compete for the use of a common machine to process their respective jobs. The due dates of the A‐jobs are decision variables, which are determined by using the common (CON) or slack (SLK) due date assignment methods. Each agent wants to minimize a certain performance criterion depending on the completion times of its jobs only. Under each due date assignment method, the criterion of agent A is always the same, namely an integrated criterion consisting of the due date assignment cost and the weighted number of tardy jobs. Several different criteria are considered for agent B, including the maxima of regular functions (associated with each job), the total (weighted) completion time, and the weighted number of tardy jobs. The overall objective is to minimize the performance criterion of agent A, while keeping the objective value of agent B no greater than a given limit. We analyze the computational complexity, and devise polynomial or pseudo‐polynomial dynamic programming algorithms for the considered problems. We also convert, if viable, any of the devised pseudopolynomial dynamic programming algorithms into a fully polynomial‐time approximation scheme. © 2016 Wiley Periodicals, Inc. Naval Research Logistics 63: 416–429, 2016 相似文献
53.
54.
55.
56.
针对弹道导弹主动段防御中多枚弹道导弹同时跟踪问题,提出了基于多假设思想的主动段跟踪算法.重点阐述了该算法中假设生成、假设概率计算、假设约简以及假设剪枝等环节.从工程实用的角度出发,采用求解一个线性分配问题(LAP)方法得到M个最优假设,大大减少了假设数量,并运用N-scan回溯剪枝方法对假设进行剪枝,确定要输出的航迹,提高了算法的效率和实用性.仿真实验表明,该算法能够对主动段多枚弹道导弹目标准确关联跟踪. 相似文献
57.
58.
There are n boxes with box i having a quota value Balls arrive sequentially, with each ball having a binary vector attached to it, with the interpretation being that if Xi = 1 then that ball is eligible to be put in box i. A ball's vector is revealed when it arrives and the ball can be put in any alive box for which it is eligible, where a box is said to be alive if it has not yet met its quota. Assuming that the components of a vector are independent, we are interested in the policy that minimizes, either stochastically or in expectation, the number of balls that need arrive until all boxes have met their quotas. © 2014 Wiley Periodicals, Inc. 62:23–31, 2015 相似文献
59.
60.
研究不确定条件下的通信干扰任务分配优化问题具有重要的军事意义。基于干扰效益因子的概念,剖析了影响通信干扰任务分配的不确定性因素,建立了基于双层随机机会约束规划的通信干扰任务分配优化模型,设计了遗传蚁群智能算法,实例计算得到了通信干扰任务分配的最佳策略。 相似文献