排序方式: 共有538条查询结果,搜索用时 15 毫秒
71.
Allocation of scarce common components to finished product orders is central to the performance of assembly systems. Analysis of these systems is complex, however, when the product master schedule is subject to uncertainty. In this paper, we analyze the cost—service performance of a component inventory system with correlated finished product demands, where component allocation is based on a fair shares method. Such issuing policies are used commonly in practice. We quantify the impact of component stocking policies on finished product delays due to component shortages and on product order completion rates. These results are used to determine optimal base stock levels for components, subject to constraints on finished product service (order completion rates). Our methodology can help managers of assembly systems to (1) understand the impact of their inventory management decisions on customer service, (2) achieve cost reductions by optimizing their inventory investments, and (3) evaluate supplier performance and negotiate contracts by quantifying the effect of delivery lead times on costs and customer service. © 2001 John Wiley & Sons, Inc. Naval Research Logistics 48:409–429, 2001 相似文献
72.
Fangruo Chen 《海军后勤学研究》2000,47(5):422-439
Consider a distribution system with a central warehouse and multiple retailers. Customer demand arrives at each of the retailers continuously at a constant rate. The retailers replenish their inventories from the warehouse which in turn orders from an outside supplier with unlimited stock. There are economies of scale in replenishing the inventories at both the warehouse and the retail level. Stockouts at the retailers are backlogged. The system incurs holding and backorder costs. The objective is to minimize the long‐run average total cost in the system. This paper studies the cost effectiveness of (R, Q) policies in the above system. Under an (R, Q) policy, each facility orders a fixed quantity Q from its supplier every time its inventory position reaches a reorder point R. It is shown that (R, Q) policies are at least 76% effective. Numerical examples are provided to further illustrate the cost effectiveness of (R, Q) policies. © 2000 John Wiley & Sons, Inc. Naval Research Logistics 47: 422–439, 2000 相似文献
73.
The opportunistic maintenance of a k‐out‐of‐n:G system with imperfect preventive maintenance (PM) is studied in this paper, where partial failure is allowed. In many applications, the optimal maintenance actions for one component often depend on the states of the other components and system reliability requirements. Two new (τ, T) opportunistic maintenance models with the consideration of reliability requirements are proposed. In these two models, only minimal repairs are performed on failed components before time τ and the corrective maintenance (CM) of all failed components are combined with PM of all functioning but deteriorated components after τ; if the system survives to time T without perfect maintenance, it will be subject to PM at time T. Considering maintenance time, asymptotic system cost rate and availability are derived. The results obtained generalize and unify some previous research in this area. Application to aircraft engine maintenance is presented. © 2000 John Wiley & Sons;, Inc. Naval Research Logistics 47: 223–239, 2000 相似文献
74.
In this paper, two different kinds of (N, T)‐policies for an M/M/m queueing system are studied. The system operates only intermittently and is shut down when no customers are present any more. A fixed setup cost of K > 0 is incurred each time the system is reopened. Also, a holding cost of h > 0 per unit time is incurred for each customer present. The two (N, T)‐policies studied for this queueing system with cost structures are as follows: (1) The system is reactivated as soon as N customers are present or the waiting time of the leading customer reaches a predefined time T, and (2) the system is reactivated as soon as N customers are present or the time units after the end of the last busy period reaches a predefined time T. The equations satisfied by the optimal policy (N*, T*) for minimizing the long‐run average cost per unit time in both cases are obtained. Particularly, we obtain the explicit optimal joint policy (N*, T*) and optimal objective value for the case of a single server, the explicit optimal policy N* and optimal objective value for the case of multiple servers when only predefined customers number N is measured, and the explicit optimal policy T* and optimal objective value for the case of multiple servers when only predefined time units T is measured, respectively. These results partly extend (1) the classic N or T policy to a more practical (N, T)‐policy and (2) the conclusions obtained for single server system to a system consisting of m (m ≥ 1) servers. © 2000 John Wiley & Sons, Inc. Naval Research Logistics 47: 240–258, 2000 相似文献
75.
In this short note we study a two‐machine flowshop scheduling problem with the additional no‐idle feasibility constraint and the total completion time criterion function. We show that one of the few papers which deal with this special problem contains incorrect claims and suggest a way how these claims can be rectified. © 2000 John Wiley & Sons, Inc. Naval Research Logistics 47:353–358, 2000 相似文献
76.
介绍了合作原则在语言交际中的作用 ,并主要分析了违反若干准则而产生的会话含义或言外之意在交际中的效果以及与语境的关系 .此外 ,合作原则不仅用于会话 ,也用于文学作品中 ,而且在外语教学中传授一些语用知识 ,对提高学生的理解能力和交际能力是有益处的 . 相似文献
77.
The coordination of production, supply, and distribution is an important issue in logistics and operations management. This paper develops and analyzes a single‐machine scheduling model that incorporates the scheduling of jobs and the pickup and delivery arrangements of the materials and finished jobs. In this model, there is a capacitated pickup and delivery vehicle that travels between the machine and the storage area, and the objective is to minimize the makespan of the schedule. The problem is strongly NP‐hard in general but is solvable in polynomial time when the job processing sequence is predetermined. An efficient heuristic is developed for the general problem. The effectiveness of the heuristic is studied both analytically and computationally. © 2005 Wiley Periodicals, Inc. Naval Research Logistics, 2005. 相似文献
78.
This paper reports on a study using the available oil monitoring information, such as the data obtained using the Spectrometric Oil Analysis Programme (SOAP), to predict the residual life of a set of aircraft engines. The relationship between oil monitoring information and the residual life is established using the concept of the proportional residual, which states that the predicted residual life may be proportional to the wear increment measured by the oil analysis programmes. Assuming such a relationship between wear and the residual life exists, we formulated a recursive prediction model for the item's residual life given measured oil monitoring information to date. A set of censored life data of 30 aircraft engines (right censored due to preventive overhaul) along with the history of their monitored metal concentration information are available to us. The metal concentration information includes many variables, such as Fe, Cu, Al, etc.; not all of them are useful, and some of them may be correlated. The principal component analysis (PCA) has been adopted to reduce the dimension of the original data set and to produce a new set of uncorrelated variables, which we shall use in the prediction model. The procedure associated with estimating model parameters is discussed. The model is fitted to the actual SOAP data from the aircraft engines, and the goodness‐of‐fit test has been carried out. © 2005 Wiley Periodicals, Inc. Naval Research Logistics, 2005. 相似文献
79.
陆军诸兵种合同作战兰切斯特方程的弹药消耗预测研究 总被引:2,自引:0,他引:2
描述了诸兵种合同作战的兰切斯特方程及其矩阵解,提出了一种通过兵力损耗换算弹药损耗的新思路,分析和确定了用该方法预测弹药消耗的相关参数,最后运用Matlab进行仿真计算,预测出了武器装备战损情况和弹药消耗情况。 相似文献
80.
针对防区外多导弹协同突防要求导弹能够成功突破敌防御系统并击中目标的问题,提出了一种基于虚拟目标的复合制导规律。首先,在敌雷达探测范围的边缘设置虚拟目标,将导弹制导过程分为制导段Ⅰ和制导段Ⅱ。然后,研究了一种基于攻击时间和攻击角度控制的制导规律,使导弹在制导段Ⅰ按指定时间和角度追踪到虚拟目标,导弹转入制导段Ⅱ后在以攻击时间最短为指标函数的最优制导规律导引下攻击真实目标。仿真结果表明该复合制导规律大大提高了多导弹的整体突防能力。 相似文献