首页 | 本学科首页   官方微博 | 高级检索  
文章检索
  按 检索   检索词:      
出版年份:   被引次数:   他引次数: 提示:输入*表示无穷大
  收费全文   18篇
  免费   1篇
  2023年   1篇
  2019年   4篇
  2017年   2篇
  2014年   3篇
  2004年   2篇
  2000年   1篇
  1996年   1篇
  1994年   1篇
  1993年   1篇
  1986年   1篇
  1979年   1篇
  1974年   1篇
排序方式: 共有19条查询结果,搜索用时 31 毫秒
1.
A generalization of the equi-partitioning problem, termed the 2D-Partition Problem, is formulated. The motivation is an aircraft maintenance scheduling problem with the following characteristics. The complete maintenance overhaul of a single aircraft requires the completion of some 350 tasks. These tasks require a varying number of technicians working at the same time. For large subsets of these 350 tasks, the constraining resource is physical space—tasks must be completed in a physical space of limited size such as the cockpit. Furthermore, there is no precedence relationship among the tasks. For each subset, the problem is to schedule the tasks to minimize makespan. Let m denote the maximum number of technicians that can work at the same time in the physical area under consideration. We present optimization algorithms for m = 2 and 3. © 1996 John Wiley & Sons, Inc.  相似文献   
2.
3.
4.
In most western countries, there is a strong incentive for defence department budget-holders to expend all of the funds they are authorized to spend in a fiscal year. In this paper, we question whether this emphasis makes sense. We develop a model of a defence department’s operating expenditure assuming a fixed level of funding for a year and uncertain costs. The results of the model suggest that the incentive for departmental managers to expend all authorized funds is inefficient. We explore the implications of the model for the Department of National Defence (DND) in Canada in light of the recent criticism of DND lapsed funding by the Auditor-General of Canada.  相似文献   
5.
In this paper, we discuss two‐dimensional failure modeling for a system where degradation is due to age and usage. We extend the concept of minimal repair for the one‐dimensional case to the two‐dimensional case and characterize the failures over a two‐dimensional region under minimal repair. An application of this important result to a manufacturer's servicing costs for a two‐dimensional warranty policy is given and we compare the minimal repair strategy with the strategy of replacement of failure. © 2004 Wiley Periodicals, Inc. Naval Research Logistics, 2004.  相似文献   
6.
If a declining state has incentives for preventive war, the rising state should have incentives to delay a confrontation until it is stronger. We develop the theoretical paradox and examine the July 1914 crisis. Why did Russia, rising relative to Germany, not adopt a buying-time strategy? We argue that although most Russian leaders hoped to avoid a confrontation, they feared that the failure to support Serbia would lead to a loss of Russian credibility and a significant setback to Russia’s position in the Balkans, one that could not easily be reversed, even with Russia’s expected increase in relative military power.  相似文献   
7.
This paper considers the problem of locating one or more new facilities on a continuous plane, where the destinations or customers, and even the facilities, may be represented by areas and not points. The objective is to locate the facilities in order to minimize a sum of transportation costs. What is new in this study is that the relevant distances are the distances from the closest point in the facility to the closest point in the demand areas. © 2000 John Wiley & Sons, Inc. Naval Research Logistics 47: 77–84, 2000  相似文献   
8.
We analyze a dual-sourcing inventory model with exponential lead times and constant unit demand in which the order quantity is split in some proportion between two sources of supply. Unlike earlier studies, we do not require that the two sources be identical in terms of the lead-time parameters or the supply prices. We compare the expected total annual costs for the two-source and the traditional single-source models over a wide range of parameter values. We confirm the findings of earlier studies that, under stochastic lead times, dual sourcing yields savings in holding and shortage costs that could outweigh the incremental ordering costs. With this more general model, we demonstrate that savings from dual sourcing are possible even where the mean or the variability of the second source is higher. © 1993 John Wiley & Sons, Inc.  相似文献   
9.
Consider a system consisting of n separately maintained independent components where the components alternate between intervals in which they are “up” and in which they are “down”. When the ith component goes up [down] then, independent of the past, it remains up [down] for a random length of time, having distribution Fi[Gi], and then goes down [up]. We say that component i is failed at time t if it has been “down” at all time points s ?[t-A.t]: otherwise it is said to be working. Thus, a component is failed if it is down and has been down for the previous A time units. Assuming that all components initially start “up,” let T denote the first time they are all failed, at which point we say the system is failed. We obtain the moment-generating function of T when n = l, for general F and G, thus generalizing previous results which assumed that at least one of these distributions be exponential. In addition, we present a condition under which T is an NBU (new better than used) random variable. Finally we assume that all the up and down distributions Fi and Gi i = l,….n, are exponential, and we obtain an exact expression for E(T) for general n; in addition we obtain bounds for all higher moments of T by showing that T is NBU.  相似文献   
10.
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号