首页 | 本学科首页   官方微博 | 高级检索  
文章检索
  按 检索   检索词:      
出版年份:   被引次数:   他引次数: 提示:输入*表示无穷大
  收费全文   19篇
  免费   1篇
  2016年   2篇
  2014年   1篇
  2013年   2篇
  2012年   1篇
  2011年   1篇
  2010年   1篇
  2009年   1篇
  2007年   2篇
  2003年   2篇
  1999年   1篇
  1997年   1篇
  1986年   1篇
  1982年   1篇
  1973年   1篇
  1968年   2篇
排序方式: 共有20条查询结果,搜索用时 15 毫秒
1.
This paper analyzes the problem of determining desirable spares inventory levels for repairable items with dependent repair times. The problem is important for repairable products such as aircraft engines which can have very large investment in spares inventory levels. While existing models can be used to determine optimal inventory spares levels when repair times are independent, the practical considerations of limited repair shop capacity and prioritized shop dispatching rules combine to make repair times not independent of one another. In this research a simulation model of a limited capacity repair facility with prioritized scheduling is used to explore a variety of heuristic approaches to the spares stocking decision. The heuristics are also compared with use of a model requiring independent repair times (even though that assumption is not valid here). The results show that even when repair time dependencies are present, the performance of a model which assumes independent repair times is quite good.  相似文献   
2.
3.
This article proposes a strategic reason for a proprietary component supplier to license her technology to a competitor or a manufacturer: her anticipation of the manufacturer's strategic commitment to invest in research and development (R&D). We address this phenomenon with a game theoretic model. Our results show that the manufacturer's full commitment to invest in R&D enables the supplier to license, sell a larger quantity through the supply chain, and charge lower prices. These results are robust to the type of demand uncertainty faced by the manufacturer within the class of increasing generalized failure rate distributions. © 2014 Wiley Periodicals, Inc. Naval Research Logistics 61: 341–350, 2014  相似文献   
4.
In many practical manufacturing environments, jobs to be processed can be divided into different families such that a setup is required whenever there is a switch from processing a job of one family to another job of a different family. The time for setup could be sequence independent or sequence dependent. We consider two particular scheduling problems relevant to such situations. In both problems, we are given a set of jobs to be processed on a set of identical parallel machines. The objective of the first problem is to minimize total weighted completion time of jobs, and that of the second problem is to minimize weighted number of tardy jobs. We propose column generation based branch and bound exact solution algorithms for the problems. Computational experiments show that the algorithms are capable of solving both problems of medium size to optimality within reasonable computational time. © 2003 Wiley Periodicals, Inc. Naval Research Logistics 50: 823–840, 2003.  相似文献   
5.
We address the problem of dispatching a vehicle with different product classes. There is a common dispatch cost, but holding costs that vary by product class. The problem exhibits multidimensional state, outcome and action spaces, and as a result is computationally intractable using either discrete dynamic programming methods, or even as a deterministic integer program. We prove a key structural property for the decision function, and exploit this property in the development of continuous value function approximations that form the basis of an approximate dispatch rule. Comparisons on single product‐class problems, where optimal solutions are available, demonstrate solutions that are within a few percent of optimal. The algorithm is then applied to a problem with 100 product classes, and comparisons against a carefully tuned myopic heuristic demonstrate significant improvements. © 2003 Wiley Periodicals, Inc. Naval Research Logistics 50: 742–769, 2003.  相似文献   
6.
This article addresses the problem of explicitly taking into account uncertainty about the demand for spare parts in making inventory procurement and stockage decisions. The model described provides for a unified treatment of the closely related problems of statistical estimation of demand and resource allocation within the inventory system, and leads to an easily implemented, efficient method of determining requirements for spare parts both in the early provisioning phase and in later periods of operations when demand data have accumulated Analyses of the model's theoretical foundations and of sample outcomes of the model based upon data on parts intended for use in the F-14 lead to conclusions of great importance to both support planners and operations planners Finally, of particular significance is the ability afforded the planner by this model to quantify the impact on inventory system costs of varying levels of system reliability or management uncertainty as to projected system performance. This will provide an economic basis for analysis of such alternatives as early deployment, operational testing, and equipment redesign.  相似文献   
7.
Consider a threshold control policy for an imperfect production system with only a work center handling both regular and rework jobs. An imperfect production system studied here, generates defect jobs by factors other than machine failures. A threshold control or (ω, s) policy sets the guideline for a work center to switch between regular and rework jobs. A production cycle begins with loading and processing of several batches of regular jobs with a lot size equal to s. The outcome of each completed regular job is an independent Bernoulli trial with three possibilities: good, rework, or scrap. Once the work center accumulates more than a threshold ω of rework jobs, it finishes the last batch of regular jobs and switches to rework jobs. The objective of this research is to find a threshold ω and a lot size s that maximize the average long‐term profit. The ultimate goal is to construct a simple algorithm to search for ω and s that can be implemented directly in production management systems, as a result of this work. © 1999 John Wiley & Sons, Inc. Naval Research Logistics 46: 273–301, 1999  相似文献   
8.
The reformulation‐linearization technique (RLT) is a methodology for constructing tight linear programming relaxations of mixed discrete problems. A key construct is the multiplication of “product factors” of the discrete variables with problem constraints to form polynomial restrictions, which are subsequently linearized. For special problem forms, the structure of these linearized constraints tends to suggest that certain classes may be more beneficial than others. We examine the usefulness of subsets of constraints for a family of 0–1 quadratic multidimensional knapsack programs and perform extensive computational tests on a classical special case known as the 0–1 quadratic knapsack problem. We consider RLT forms both with and without these inequalities, and their comparisons with linearizations derived from published methods. Interestingly, the computational results depend in part upon the commercial software used. © 2009 Wiley Periodicals, Inc. Naval Research Logistics, 2010  相似文献   
9.
We consider scheduling problems involving two agents (agents A and B), each having a set of jobs that compete for the use of a common machine to process their respective jobs. The due dates of the A‐jobs are decision variables, which are determined by using the common (CON) or slack (SLK) due date assignment methods. Each agent wants to minimize a certain performance criterion depending on the completion times of its jobs only. Under each due date assignment method, the criterion of agent A is always the same, namely an integrated criterion consisting of the due date assignment cost and the weighted number of tardy jobs. Several different criteria are considered for agent B, including the maxima of regular functions (associated with each job), the total (weighted) completion time, and the weighted number of tardy jobs. The overall objective is to minimize the performance criterion of agent A, while keeping the objective value of agent B no greater than a given limit. We analyze the computational complexity, and devise polynomial or pseudo‐polynomial dynamic programming algorithms for the considered problems. We also convert, if viable, any of the devised pseudopolynomial dynamic programming algorithms into a fully polynomial‐time approximation scheme. © 2016 Wiley Periodicals, Inc. Naval Research Logistics 63: 416–429, 2016  相似文献   
10.
The main objective of the paper is to decipher the military expenditure–economic growth relationship, taking the level of economic development (income) into consideration. Our findings suggest the following: (i) military expenditure has a significantly negative relationship to economic growth for the 23 countries with initial incomes (threshold variable) less than or equal to $475.93; (ii) when the threat level is heightened, economic growth (23 countries) is expected to decrease. However, military expenditure in the presence of sufficiently large threats increases growth; (iii) for the remaining 69 countries whose initial incomes (real GDP per capita in 1992 price) exceed $475.93, no significant relationship exists whether the threat variable is taken into consideration or not.  相似文献   
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号