首页 | 本学科首页   官方微博 | 高级检索  
文章检索
  按 检索   检索词:      
出版年份:   被引次数:   他引次数: 提示:输入*表示无穷大
  收费全文   45篇
  免费   8篇
  2021年   3篇
  2018年   2篇
  2016年   2篇
  2015年   3篇
  2014年   3篇
  2013年   3篇
  2011年   1篇
  2009年   4篇
  2008年   2篇
  2006年   3篇
  2005年   1篇
  2004年   4篇
  2003年   3篇
  2002年   1篇
  2001年   2篇
  2000年   1篇
  1999年   1篇
  1997年   2篇
  1995年   1篇
  1991年   1篇
  1986年   1篇
  1984年   1篇
  1983年   1篇
  1981年   1篇
  1978年   1篇
  1976年   1篇
  1975年   1篇
  1971年   1篇
  1970年   1篇
  1969年   1篇
排序方式: 共有53条查询结果,搜索用时 15 毫秒
1.
We consider a single machine scheduling problem in which the objective is to minimize the mean absolute deviation of job completion times about a common due date. We present an algorithm for determining multiple optimal schedules under restrictive assumptions about the due date, and an implicit enumeration procedure when the assumptions do not hold. We also establish the similarity of this problem to the two parallel machines mean flow time problem.  相似文献   
2.
In this article we consider a continuous-time Markov decision process with a denumerable state space and nonzero terminal rewards. We first establish the necessary and sufficient optimality condition without any restriction on the cost functions. The necessary condition is derived through the Pontryagin maximum principle and the sufficient condition, by the inherent structure of the problem. We introduce a dynamic programming approximation algorithm for the finite-horizon problem. As the time between discrete points decreases, the optimal policy of the discretized problem converges to that of the continuous-time problem in the sense of weak convergence. For the infinite-horizon problem, a successive approximation method is introduced as an alternative to a policy iteration method.  相似文献   
3.
Least squares estimators of the parameters of the generalized Eyring Model are obtained by using data from censored life tests conducted at several accelerated environments. These estimators are obtained after establishing that the Gauss-Markov conditions for least squares estimation are satisfied. Confidence intervals for the hazard rate at use conditions are obtained after empirically showing that the logarithm of the estimate of the hazard rate at use conditions is approximately normally distributed. The coverage probabilities of the confidence intervals are also verified by a Monte Carlo experiment. The techniques are illustrated by an application to some real data.  相似文献   
4.
Fractional fixed-charge problems arise in numerous applications, where the measure of economic performance is the time rate of earnings or profit (equivalent to an interest rate on capital investment). This paper treats the fractional objective function, after suitable transformation, as a linear parametric fixed-charge problem. It is proved, with wider generality than in the case of Hirsch and Dantzig, that some optimal solution to the generalized linear fixed-charge problem is an extreme point of the polyhedral set defined by the constraints. Furthermore, it is shown that the optimum of the generalized fractional fixed-charge problem is also a vertex of this set. The proof utilizes a suitable penalty function yielding an upper bound on the optimal value of the objective function; this is particularly useful when considering combinations of independent transportation-type networks. Finally, it is shown that the solution of a fractional fixed-charge problem is obtainable through that of a certain linear fixed-charge one.  相似文献   
5.
最近,Queensgate仪器有限公司研制出一系列超精定位机械,它们将Queensgate的压电及纳米级传感器技术融合为具有亚纳米级定位精度能力的多轴定位控制器。在这篇论文中,将介绍和讨论在这些机械的研制中所用到的一些技术,以解释如何获得纳米或亚纳米级水平的计量能力。  相似文献   
6.
We study new decision and optimization problems of finding a simple path between two given vertices in an arc weighted directed multigraph such that the path length is equal to a given number or it does not fall into the given forbidden intervals (gaps). A fairly complete computational complexity classification is provided and exact and approximation algorithms are suggested.  相似文献   
7.
We consider the problem of scheduling a set of n jobs on a single batch machine, where several jobs can be processed simultaneously. Each job j has a processing time pj and a size sj. All jobs are available for processing at time 0. The batch machine has a capacity D. Several jobs can be batched together and processed simultaneously, provided that the total size of the jobs in the batch does not exceed D. The processing time of a batch is the largest processing time among all jobs in the batch. There is a single vehicle available for delivery of the finished products to the customer, and the vehicle has capacity K. We assume that K = rD, where and r is an integer. The travel time of the vehicle is T; that is, T is the time from the manufacturer to the customer. Our goal is to find a schedule of the jobs and a delivery plan so that the service span is minimized, where the service span is the time that the last job is delivered to the customer. We show that if the jobs have identical sizes, then we can find a schedule and delivery plan in time such that the service span is minimum. If the jobs have identical processing times, then we can find a schedule and delivery plan in time such that the service span is asymptotically at most 11/9 times the optimal service span. When the jobs have arbitrary processing times and arbitrary sizes, then we can find a schedule and delivery plan in time such that the service span is asymptotically at most twice the optimal service span. We also derive upper bounds of the absolute worst‐case ratios in both cases. © 2015 Wiley Periodicals, Inc. Naval Research Logistics 62: 470–482, 2015  相似文献   
8.
We consider the problem of sequencing n jobs on a single machine, with each job having a processing time and a common due date. The common due date is assumed to be so large that all jobs can complete by the due date. It is known that there is an O(n log n)‐time algorithm for finding a schedule with minimum total earliness and tardiness. In this article, we consider finding a schedule with dual criteria. The primary goal is to minimize the total earliness and tardiness. The secondary goals are to minimize: (1) the maximum earliness and tardiness; (2) the sum of the maximum of the squares of earliness and tardiness; (3) the sum of the squares of earliness and tardiness. For the first two criteria, we show that the problems are NP‐hard and we give a fully polynomial time approximation scheme for both of them. For the last two criteria, we show that the ratio of the worst schedule versus the best schedule is no more than . © 2002 Wiley Periodicals, Inc. Naval Research Logistics 49: 422–431, 2002; Published online in Wiley InterScience (www.interscience.wiley.com). DOI 10.1002/nav.10020  相似文献   
9.
We consider a loss system with a fixed budget for servers. The system owner's problem is choosing the price, and selecting the number and quality of the servers, in order to maximize profits, subject to a budget constraint. We solve the problem with identical and different service rates as well as with preemptive and nonpreemptive policies. In addition, when the policy is preemptive, we prove the following conservation law: the distribution of the total service time for a customer entering the slowest server is hyperexponential with expectation equal to the average service rate independent of the allocation of the capacity. © 2015 Wiley Periodicals, Inc. Naval Research Logistics 62: 81–97, 2015  相似文献   
10.
Extending Sastry's result on the uncapacitated two‐commodity network design problem, we completely characterize the optimal solution of the uncapacitated K‐commodity network design problem with zero flow costs for the case when K = 3. By solving a set of shortest‐path problems on related graphs, we show that the optimal solutions can be found in O(n3) time when K = 3, where n is the number of nodes in the network. The algorithm depends on identifying a list of “basic patterns”; the number of basic patterns grows exponentially with K. We also show that the uncapacitated K‐commodity network design problem can be solved in O(n3) time for general K if K is fixed; otherwise, the time for solving the problem is exponential. © 2004 Wiley Periodicals, Inc. Naval Research Logistics, 2004  相似文献   
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号