首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 255 毫秒
1.
We introduce a formulation and an exact solution method for a nonpreemptive resource constrained project scheduling problem in which the duration/cost of an activity is determined by the mode selection and the duration reduction (crashing) within the mode. This problem is a natural combination of the time/cost tradeoff problem and the resource constrained project scheduling problem. It involves the determination, for each activity, of its resource requirements, the extent of crashing, and its start time so that the total project cost is minimized. We present a branch and bound procedure and report computational results with a set of 160 problems. Computational results demonstrate the effectiveness of our procedure. © 2001 John Wiley & Sons, Inc. Naval Research Logistics 48: 107–127, 2001  相似文献   

2.
We consider a single‐queue with exhaustive or gated time‐limited services and server vacations, in which the length of each service period at the queue is controlled by a timer, i.e., the server serves customers until the timer expires or the queue becomes empty, whichever occurs first, and then takes vacations. The customer whose service is interrupted due to the timer expiration may be attended according to nonpreemptive or preemptive service disciplines. For the M/G/1 exhaustive/gated time‐limited service queueing system with an exponential timer and four typical preemptive/nonpreemptive service disciplines, we derive the Laplace—Stieltjes transforms and the moment formulas for waiting times and sojourn times through a unified approach, and provide some new results for these time‐limited service disciplines. © John Wiley & Sons, Inc. Naval Research Logistics 48: 638–651, 2001.  相似文献   

3.
We consider the problem of scheduling multiprocessor tasks with prespecified processor allocations to minimize the total completion time. The complexity of both preemptive and nonpreemptive cases of the two-processor problem are studied. We show that the preemptive case is solvable in O(n log n) time. In the nonpreemptive case, we prove that the problem is NP-hard in the strong sense, which answers an open question mentioned in Hoogeveen, van de Velde, and Veltman (1994). An efficient heuristic is also developed for this case. The relative error of this heuristic is at most 100%. © 1998 John Wiley & Sons, Inc. Naval Research Logistics 45: 231–242, 1998  相似文献   

4.
We study the problems of scheduling a set of nonpreemptive jobs on a single or multiple machines without idle times where the processing time of a job is a piecewise linear nonincreasing function of its start time. The objectives are the minimization of makespan and minimization of total job completion time. The single machine problems are proved to be NP‐hard, and some properties of their optimal solutions are established. A pseudopolynomial time algorithm is constructed for makespan minimization. Several heuristics are derived for both total completion time and makespan minimization. Computational experiments are conducted to evaluate their efficiency. NP‐hardness proofs and polynomial time algorithms are presented for some special cases of the parallel machine problems. © 2003 Wiley Periodicals, Inc. Naval Research Logistics 50: 531–554, 2003  相似文献   

5.
We show that the deterministic nonpreemptive scheduling problem with earliness and tardiness penalties can be solved in polynomial time for certain forms of an objective function provided that a certain optimization problem can be solved. We give instances where this problem has a solution and show that this generalizes several results from the literature. These results do not require symmetric penalization and the penalty functions need only be lower semicontinuous.  相似文献   

6.
We consider a reader—writer system consisting of a single server and a fixed number of jobs (or customers) belonging to two classes. Class one jobs are called readers and any number of them can be processed simultaneously. Class two jobs are called writers and they have to be processed one at a time. When a writer is being processed no other writer or readers can be processed. A fixed number of readers and writers are ready for processing at time 0. Their processing times are independent random variables. Each reader and writer has a fixed waiting cost rate. We find optimal scheduling rules that minimize the expected total waiting cost (expected total weighted flowtime). We consider both nonpreemptive and preemptive scheduling. The optimal nonpreemptive schedule is derived by a variation of the usual interchange argument, while the optimal schedule in the preemptive case is given by a Gittins index policy. These index policies continue to be optimal for systems in which new writers enter the system in a Poisson fashion. © 1998 John Wiley & Sons, Inc. Naval Research Logistics 45: 483–495, 1998  相似文献   

7.
A single server is faced with a collection of jobs of varying duration and urgency. Each job has a random lifetime during which it is available for nonpreemptive service. Should a job's lifetime expire before its service begins then it is lost from the system unserved. The goal is to schedule the jobs for service to maximize the expected number served to completion. Two heuristics have been proposed in the literature. One (labeled πS) operates a static priority among the job classes and works well in a “no premature job loss” limit, whereas the second (πM) is a myopic heuristic which works well when lifetimes are short. Both can exhibit poor performance for problems at some distance from the regimes for which they were designed. We develop a robustly good heuristic by an approximative approach to the application of a policy improvement step to the asymptotically optimal heuristic πS, in which we use a fluid model to obtain an approximation for the value function of πS. The performance of the proposed heuristic is investigated in an extensive numerical study. © 2010 Wiley Periodicals, Inc. Naval Research Logistics 2010  相似文献   

8.
The steady-state workload at an arbitrary time is considered for several single-server queueing systems with nonpreemptive services for multiple classes of customers (arriving according to Poisson processes) and server vacation (switchover) times. The distribution of the workload at an arbitrary point during the vacation period is obtained for systems with setup times, and for polling systems with exhaustive, gated, or globally gated service disciplines. From the stochastic decomposition property, this workload is added to the workload in the corresponding M/G/1 system without vacations to give the workload at an arbitrary time in vacation systems. Dependence of the workload distribution on the vacation parameters is studied.  相似文献   

9.
In this paper the n/1/rj Σj wj Cj problem under the assumptions of nonpreemptive sequencing and sequence independent processing times is investigated. After pointing out the fundamental properties, some dominance sufficient conditions among sequences are obtained and a branch and bound algorithm is proposed. Computational results are reported and discussed.  相似文献   

10.
In this paper, we investigate multiclass feedback queues with gated disciplines. The server selects the stations by a nonpreemptive priority scheduling algorithm and serves customers in the selected station by either a gated FCFS discipline or a gated priority discipline. We take a rather systematic approach to their mean sojourn times. We define conditional expected sojourn times for all customers and derive their expressions from an analysis of busy periods. Since they are shown to be linear in some components of the system states, their steady state mean values can be derived from simple limiting procedures. These mean values can be obtained from a set of linear equations. © 2003 Wiley Periodicals, Inc. Naval Research Logistics 50: 719–741, 2003.  相似文献   

11.
The paper considers the open shop scheduling problem to minimize the make-span, provided that one of the machines has to process the jobs according to a given sequence. We show that in the preemptive case the problem is polynomially solvable for an arbitrary number of machines. If preemption is not allowed, the problem is NP-hard in the strong sense if the number of machines is variable, and is NP-hard in the ordinary sense in the case of two machines. For the latter case we give a heuristic algorithm that runs in linear time and produces a schedule with the makespan that is at most 5/4 times the optimal value. We also show that the two-machine problem in the nonpreemptive case is solvable in pseudopolynomial time by a dynamic programming algorithm, and that the algorithm can be converted into a fully polynomial approximation scheme. © 1998 John Wiley & Sons, Inc. Naval Research Logistics 45: 705–731, 1998  相似文献   

12.
We consider a loss system with a fixed budget for servers. The system owner's problem is choosing the price, and selecting the number and quality of the servers, in order to maximize profits, subject to a budget constraint. We solve the problem with identical and different service rates as well as with preemptive and nonpreemptive policies. In addition, when the policy is preemptive, we prove the following conservation law: the distribution of the total service time for a customer entering the slowest server is hyperexponential with expectation equal to the average service rate independent of the allocation of the capacity. © 2015 Wiley Periodicals, Inc. Naval Research Logistics 62: 81–97, 2015  相似文献   

13.
In this paper we present an algorithm for solving a class of queueing network design problems. Specifically, we focus on determining both service and arrival rates in an open Jackson network of queueing stations. This class of problems has been widely studied and used in a variety of applications, but not well solved due to the difficulty of the resulting optimization problems. As an example, consider the classic application in computer network design which involves determining the minimum cost line capacities and flow assignments while satisfying a queueing performance measure such as an upper limit on transmission delay. Other application areas requiring the selection of both service and arrival rates in a network of queues include the design of communication, manufacturing, and health care systems. These applications yield optimization problems that are difficult to solve because typically they are nonconvex, which means they may have many locally optimal solutions that are not necessarily globally optimal. Therefore, to obtain a globally optimal solution, we develop an efficient branch and bound algorithm that takes advantage of the problem structure. Computational testing on randomly generated problems and actual problems from a health care organization indicate that the algorithm is able to solve realistic sized problems in reasonable computing time on a laptop computer. © 2000 John Wiley & Sons, Inc. Naval Research Logistics 47: 1–17, 2000  相似文献   

14.
Without restricting the class of permissible schedules, we derive optimal schedules for economic lot scheduling problems that are fully loaded, have external setups, and have only two products. The fully loaded condition accurately represents certain types of bottlenecks. We show that the optimal schedule must have the Wagner-Whitin property. We also develop a measure of aggregate inventory, derive an optimal steady-state aggregate inventory policy, and provide conditions under which the aggregate inventory level of an optimal schedule must approach a steady state. By restricting the class of permissible schedules to rotation cycle schedules, we extend these results to more than two products.  相似文献   

15.
We consider a class of facility location problems with a time dimension, which requires assigning every customer to a supply facility in each of a finite number of periods. Each facility must meet all assigned customer demand in every period at a minimum cost via its production and inventory decisions. We provide exact branch‐and‐price algorithms for this class of problems and several important variants. The corresponding pricing problem takes the form of an interesting class of production planning and order selection problems. This problem class requires selecting a set of orders that maximizes profit, defined as the revenue from selected orders minus production‐planning‐related costs incurred in fulfilling the selected orders. We provide polynomial‐time dynamic programming algorithms for this class of pricing problems, as well as for generalizations thereof. Computational testing indicates the advantage of our branch‐and‐price algorithm over various approaches that use commercial software packages. These tests also highlight the significant cost savings possible from integrating location with production and inventory decisions and demonstrate that the problem is rather insensitive to forecast errors associated with the demand streams. © 2011 Wiley Periodicals, Inc. Naval Research Logistics, 2011  相似文献   

16.
This article describes a polynomial transformation for a class of unit‐demand vehicle routing problems, named node‐balanced routing problems (BRP), where the number of nodes on each route is restricted to be in an interval such that the workload across the routes is balanced. The transformation is general in that it can be applied to single or multiple depot, homogeneous or heterogeneous fleet BRPs, and any combination thereof. At the heart of the procedure lies transforming the BRP into a generalized traveling salesman problem (TSP), which can then be transformed into a TSP. The transformed graph exhibits special properties which can be exploited to significantly reduce the number of arcs, and used to construct a formulation for the resulting TSP that amounts to no more than that of a constrained assignment problem. Computational results on a number of instances are presented. © 2015 Wiley Periodicals, Inc. Naval Research Logistics 62: 370–387, 2015  相似文献   

17.
Generalized Lagrange Multipliers (GLM) are used to develop an algorithm for a type of multiproduct single period production planning problem which involves discontinuities of the fixed charge variety. Several properties of the GLM technique are developed for this class of problems and from these properties an algorithm is obtained. The problem of resolving the gaps which are exposed by the GLM procedure is considered, and an example involving a quadratic cost function is explored in detail.  相似文献   

18.
Many sequential planning problems can be represented as a shortest path problem in an acyclic network. This includes all deterministic dynamic programs as well as certain stochastic sequential decision problems. In this article, we identify a large class of shortest path problems for which a general efficient algorithm for the simultaneous solution and detection of minimal forecast horizons is developed. Detection of a such minimal forecast horizons is essential when accurate information regarding various relevant parameters is obtained progressively, i.e., when the initial information is restricted to a limited horizon of “future” stages only. We describe five classes of planning problems which can be efficiently addressed by the general algorithm. These classes deal with multi-item joint replenishment systems, combined inventory and routing problems, machine scheduling issues, single item stochastic inventory settings and routing problems in the plane and in space. © 1996 John Wiley & Sons, Inc.  相似文献   

19.
An important class of network flow problems is that class for which the objective is to minimize the cost of the most expensive unit of flow while obtaining a desired total flow through the network. Two special cases of this problem have been solved, namely, the bottleneck assignment problem and time-minimizing transportation problem. This paper addresses the more general case which we shall refer to as the time-minimizing network flow problem. Associated with each arc is an arc capacity (static) and a transferral time. The objective is to find a maximal flow for which the length (in time) of the longest path carrying flow is minimized. The character of the problem is discussed and a solution algorithm is presented.  相似文献   

20.
An algorithm designed to solve a large class of nonconvex max-min problems is described. Its usefulness and applicability is demonstrated by solving an extension of a recently introduced model which optimally allocates strategic weapon systems. The extended model is shown to be equivalent to a nonconvex mathematical program with an infinite number of constraints, and hence is not solvable by conventional procedures. An example is worked out in detail to illustrate the algorithm.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号