首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 656 毫秒
1.
This article studies two due window scheduling problems to minimize the weighted number of early and tardy jobs in a two‐machine flow shop, where the window size is externally determined. These new scheduling models have many practical applications in real life. However, results on these problems have rarely appeared in the literature because of a lack of structural and optimality properties for solving them. In this article, we derive several dominance properties and theorems, including elimination rules and sequencing rules based on Johnsos order, lower bounds on the penalty, and upper bounds on the window location, which help to significantly trim the search space for the problems. We further show that the problems are NP‐hard in the ordinary sense only. We finally develop efficient pseudopolynomial dynamic programming algorithms for solving the problems. © 2009 Wiley Periodicals, Inc. Naval Research Logistics, 2009  相似文献   

2.
The ordered matrix flow shop problem with no passing of jobs is considered. In an earlier paper, the authors have considered a special case of the problem and have proposed a simple and efficient algorithm that finds a sequence with minimum makespan for a special problem. This paper considers a more general case. This technique is shown to be considerably more efficient than are existing methods for the conventional flow shop problems.  相似文献   

3.
Johnson [2] in 1954 solved the two machine flow shop problem by giving an argument for a sufficient condition of optimality and by stating an efficient algorithm which produces a solution via satisfaction of the sufficient condition. Moreover, Johnson solved two special cases of the corresponding three machine flow shop problem. Since that time, six other special cases have been solved, two contributed by Arthanari and Mukhopadhyay [1], two by Smith, Panwalkar, and Dudek [3], and two of a different nature by Szwarc [5]. This paper contributes an extension to one of the classes described by Szwarc.  相似文献   

4.
讨论作业具有线性加工时间,作业间具有链约束的两台处理机流水作业排序问题,目标函数为极小化完工时间。在作业加工时间简单线性恶化下,提出作业的非负开始和停止延迟恶化率,构造了满足约束条件的复合作业。在此基础上,给出作业间具有平行链约束的两台处理机流水作业排序问题的最优多项式算法。  相似文献   

5.
Johnson's rule gives the optimal order to schedule a set of jobs through a two-machine flow shop with deterministic processing times. We extend Johnson's rule to fork-join systems with random processing times. Most of the system may be an arbitrary network. We give conditions under which Johnson's rule is optimal in the stochastic sense, in the increasing convex sense, and in expected value. © 1997 John Wiley & Sons, Inc. Naval Research Logistics 44: 211–220, 1997  相似文献   

6.
We derive sufficient conditions which, when satisfied, guarantee that an optimal solution for a single‐machine scheduling problem is also optimal for the corresponding proportionate flow shop scheduling problem. We then utilize these sufficient conditions to show the solvability in polynomial time of numerous proportionate flow shop scheduling problems with fixed job processing times, position‐dependent job processing times, controllable job processing times, and also problems with job rejection. © 2015 Wiley Periodicals, Inc. Naval Research Logistics 62: 595–603, 2015  相似文献   

7.
It is well known that a minimal makespan permutation sequence exists for the n × 3 flow shop problem and for the n × m flow shop problem with no inprocess waiting when processing times for both types of problems are positive. It is shown in this paper that when the assumption of positive processing times is relaxed to include nonnegative processing times, optimality of permutation schedules cannot be guaranteed.  相似文献   

8.
We study linear programming models that contain transportation constraints in their formulation. Typically, these models have a multistage nature and the transportation constraints together with the associated flow variables are used to achieve consistency between consecutive stages. We describe how to reformulate these models by projecting out the flow variables. The reformulation can be more desirable since it has fewer variables and can be solved faster. We apply these ideas to reformulate two well‐known workforce staffing and scheduling problems: the shift scheduling problem and the tour scheduling problem. We also present computational results. © 2003 Wiley Periodicals, Inc. Naval Research Logistics, 2004.  相似文献   

9.
This paper treats the problem of sequencing n jobs on two machines in a “flow shop.” (That is, each job in the shop is required to flow through the same sequence of the machines.) The processing time of a given job on a given machine is assumed to be distributed exponentially, with a known mean. The objective is to minimize the expected job completion time. This paper proves an optimal ordering rule, previously conjectured by Talwar [10]. A formula is also derived through Markov Chain analysis, which evaluates the expected job completion time for any given sequence of the jobs. In addition, the performance of a heuristic rule is discussed in the light of the optimal solution.  相似文献   

10.
This paper analyzes the problem of determining desirable spares inventory levels for repairable items with dependent repair times. The problem is important for repairable products such as aircraft engines which can have very large investment in spares inventory levels. While existing models can be used to determine optimal inventory spares levels when repair times are independent, the practical considerations of limited repair shop capacity and prioritized shop dispatching rules combine to make repair times not independent of one another. In this research a simulation model of a limited capacity repair facility with prioritized scheduling is used to explore a variety of heuristic approaches to the spares stocking decision. The heuristics are also compared with use of a model requiring independent repair times (even though that assumption is not valid here). The results show that even when repair time dependencies are present, the performance of a model which assumes independent repair times is quite good.  相似文献   

11.
This paper analyzes the waiting-time distribution of a specific job as it moves through a job-shop with multiple centers and exponential service times. The movement of the job through the shop is governed by a Markovian transition matrix and ends with the job's exit from the shop.  相似文献   

12.
This paper considers the classical nXm flow shop sequencing problem. An improved branch and bound procedure is proposed. Computational experience shows that the proposed procedure is more efficient compared to the existing optimizing procedures.  相似文献   

13.
This paper presents a deterministic approach to schedule patients in an ambulatory surgical center (ASC) such that the number of postanesthesia care unit nurses at the center is minimized. We formulate the patient scheduling problem as new variants of the no‐wait, two‐stage process shop scheduling problem and present computational complexity results for the new scheduling models. Also, we develop a tabu search‐based heuristic algorithm to solve the patient scheduling problem. Our algorithm is shown to be very effective in finding near optimal schedules on a set of real data from a university hospital's ASC. © 2003 Wiley Periodicals, Inc. Naval Research Logistics, 2003  相似文献   

14.
This paper examines scheduling problems in which the setup phase of each operation needs to be attended by a single server, common for all jobs and different from the processing machines. The objective in each situation is to minimize the makespan. For the processing system consisting of two parallel dedicated machines we prove that the problem of finding an optimal schedule is N P‐hard in the strong sense even if all setup times are equal or if all processing times are equal. For the case of m parallel dedicated machines, a simple greedy algorithm is shown to create a schedule with the makespan that is at most twice the optimum value. For the two machine case, an improved heuristic guarantees a tight worst‐case ratio of 3/2. We also describe several polynomially solvable cases of the later problem. The two‐machine flow shop and the open shop problems with a single server are also shown to be N P‐hard in the strong sense. However, we reduce the two‐machine flow shop no‐wait problem with a single server to the Gilmore—Gomory traveling salesman problem and solve it in polynomial time. © 2000 John Wiley & Sons, Inc. Naval Research Logistics 47: 304–328, 2000  相似文献   

15.
A flow shop sequencing problem with ordered processing time matrices is considered. A convex property for the makespan sequences of such problems is discussed. On the basis of this property an efficient optimizing algorithm is presented. Although the proof of optimality has not been developed, several hundred problems were solved optimally with this procedure.  相似文献   

16.
We consider a manufacturer, served by a single supplier, who has to quote due dates to arriving customers in a make‐to‐order production environment. The manufacturer is penalized for long lead times and for missing due dates. To meet due dates, the manufacturer has to obtain components from a supplier. We model this manufacturer and supplier as a two‐machine flow shop, consider several variations of this problem, and design effective due‐date quotation and scheduling algorithms for centralized and decentralized versions of the model. We perform extensive computational testing to assess the effectiveness of our algorithms and to compare the centralized and decentralized models to quantify the value of centralized control in a make‐to‐order supply chain. Since complete information exchange and centralized control is not always practical or cost‐effective, we explore the value of partial information exchange for this system. © 2008 Wiley Periodicals, Inc. Naval Research Logistics, 2008  相似文献   

17.
We consider two‐stage and three‐stage flexible flow shops with parallel machines in each stage and the minimum makespan objective. We develop linear time algorithms for these problems with absolute worst‐case bounds either sharper or no worse than the currently available ones and we accomplish this with lower complexity algorithms. We also demonstrate the asymptotic optimality of a class of algorithms for multistage flexible flow shop problems (which includes the proposed algorithms) under certain probabilistic assumptions on the job processing times. © 2000 John Wiley & Sons, Inc. Naval Research Logistics 47: 259–268, 2000  相似文献   

18.
涡轮增压机组的功率平衡计算方法   总被引:1,自引:0,他引:1  
介绍了舰船蒸汽动力装置中增压锅炉的计算特性,并在对已有的一些相关计算模型分析的基础上,描述了涡轮增压机组的功率平衡计算难题。针对该难题给出了涡轮增压机组的功率平衡计算流程和计算中有关问题的处理方法,在确保计算完备可行的前提下,该方法适合于工程应用。  相似文献   

19.
It is known that the proportionate flow shop minimum makespan F m / p r p t / C max problem is solved optimally by any permutation job sequence. We show that the F m / p r p t / C max problem is at least ordinary NP‐hard when missing operations are allowed and present some solvable cases. We then consider the standard proportionate flow shop problem (with no missing operations) and show that the solution algorithms for a class of single‐machine due date assignment problems can be extended/generalized to the corresponding proportionate flow shop problems. © 2015 Wiley Periodicals, Inc. Naval Research Logistics 62: 98–106, 2015  相似文献   

20.
针对双舰编队协同制导作战条件下如何对空袭目标进行排序这一问题,依据作战时间给出了排序算法。首先对平台的作战时间进行分析和求解,将射击周期分成了2段,把静态拦截排序问题转化为了2台处理机的同顺序作业排序问题,然后根据输入信息的改变而不断调整空袭目标的顺序以解决动态拦截排序问题,最后在想定条件下仿真计算,结果表明该算法具有较好的适用性。  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号