全文获取类型
收费全文 | 268篇 |
免费 | 189篇 |
国内免费 | 12篇 |
出版年
2024年 | 1篇 |
2023年 | 6篇 |
2022年 | 3篇 |
2021年 | 12篇 |
2020年 | 14篇 |
2019年 | 8篇 |
2018年 | 12篇 |
2017年 | 24篇 |
2016年 | 27篇 |
2015年 | 27篇 |
2014年 | 29篇 |
2013年 | 26篇 |
2012年 | 30篇 |
2011年 | 31篇 |
2010年 | 12篇 |
2009年 | 23篇 |
2008年 | 21篇 |
2007年 | 21篇 |
2006年 | 31篇 |
2005年 | 28篇 |
2004年 | 16篇 |
2003年 | 9篇 |
2002年 | 9篇 |
2001年 | 8篇 |
2000年 | 13篇 |
1999年 | 8篇 |
1998年 | 11篇 |
1997年 | 1篇 |
1996年 | 1篇 |
1995年 | 2篇 |
1994年 | 2篇 |
1991年 | 1篇 |
1990年 | 2篇 |
排序方式: 共有469条查询结果,搜索用时 31 毫秒
21.
22.
In scheduling problems with two competing agents, each one of the agents has his own set of jobs to be processed and his own objective function, and both share a common processor. In the single‐machine problem studied in this article, the goal is to find a joint schedule that minimizes the total deviation of the job completion times of the first agent from a common due‐date, subject to an upper bound on the maximum deviation of job completion times of the second agent. The problem is shown to be NP‐hard even for a nonrestrictive due‐date, and a pseudopolynomial dynamic program is introduced and tested numerically. For the case of a restrictive due‐date (a sufficiently small due‐date that may restrict the number of early jobs), a faster pseudopolynomial dynamic program is presented. We also study the multiagent case, which is proved to be strongly NP‐hard. A simple heuristic for this case is introduced, which is tested numerically against a lower bound, obtained by extending the dynamic programming algorithm. © 2013 Wiley Periodicals, Inc. Naval Research Logistics 61: 1–16, 2014 相似文献
23.
路由算法在选择路径时,主要考虑传输延迟和跳数这两个因素,分别选取最短延迟路径(Least Delay Path,LDP)或最少跳数路径(Least Hops Path,LHP)。在卫星网络中,基于LHP选径策略实现更加简单,但其应用在LEO卫星网络中合理性的研究成果不多。对极轨道LEO卫星网络中,LDP和LHP之间关系进行详细地理论分析,验证了LHP选径策略的合理性。并在此基础上,提出一种基于横向传输优先级(Horizontal Transmitting Priority,HTP)的LHP最短路径选择策略,利用横向链路长短特性简化路径决策流程。通过仿真,该方法能够快速寻找到最短LHP路径,为LEO卫星网络路由算法提供一定的研究基础。 相似文献
24.
各类卫星在现代战争中发挥着重要和关键作用。我国传统的卫星试验和鉴定具有很强的科研试验性质,承制单位和用户重点关注的是性能检验,较少考虑作战效能和部队适用性等指标。为推动卫星装备建设和应用,装备试验鉴定部门初步组织开展了相应的在役考核工作。文章对比了美军装备作战试验与鉴定、我国作战试验与在役考核的概念;提出卫星在役考核的六大特点;分析卫星在役考核的组织方式、组织机构和组织保障的不足,提出相应发展建议;研究卫星在役考核指标体系设计、分析评估方法、问题反馈与整改等方面的不足,并提出相应措施建议。 相似文献
25.
干扰和多径是影响接收机导航定位性能的两个主要因素。针对卫星导航接收机的抗干扰问题,提出了一种基于两级滤波结构的卫星导航天线阵抗干扰算法。第一级滤波采用功率倒置算法抑制干扰,通过相关解扩提高卫星信号的信噪比,并估计出其空间特征矢量。第二级滤波用估计得到的卫星信号空间特征矢量对第一级滤波输出信号进行加权处理,从而形成指向卫星信号方向的主波束来进一步提高信噪比。仿真结果表明,该算法的性能明显优于功率倒置算法,且非常接近传统的波束形成算法,不需要阵列校正以及姿态测量单元辅助,其实现代价远小于传统的波束形成算法。 相似文献
26.
We consider the problem of scheduling a set of jobs on a single machine subject to random breakdowns. We focus on the preemptive‐repeat model, which addresses the situation where, if a machine breaks down during the processing of a job, the work done on the job prior to the breakdown is lost and the job will have to be started from the beginning again when the machine resumes its work. We allow that (i) the uptimes and downtimes of the machine follow general probability distributions, (ii) the breakdown process of the machine depends upon the job being processed, (iii) the processing times of the jobs are random variables following arbitrary distributions, and (iv) after a breakdown, the processing time of a job may either remain a same but unknown amount, or be resampled according to its probability distribution. We first derive the optimal policy for a class of problems under the criterion to maximize the expected discounted reward earned from completing all jobs. The result is then applied to further obtain the optimal policies for other due date‐related criteria. We also discuss a method to compute the moments and probability distributions of job completion times by using their Laplace transforms, which can convert a general stochastic scheduling problem to its deterministic equivalent. The weighted squared flowtime problem and the maintenance checkup and repair problem are analyzed as applications. © 2004 Wiley Periodicals, Inc. Naval Research Logistics, 2004 相似文献
27.
We consider the problem of scheduling customer orders in a flow shop with the objective of minimizing the sum of tardiness, earliness (finished goods inventory holding), and intermediate (work‐in‐process) inventory holding costs. We formulate this problem as an integer program, and based on approximate solutions to two different, but closely related, Dantzig‐Wolfe reformulations, we develop heuristics to minimize the total cost. We exploit the duality between Dantzig‐Wolfe reformulation and Lagrangian relaxation to enhance our heuristics. This combined approach enables us to develop two different lower bounds on the optimal integer solution, together with intuitive approaches for obtaining near‐optimal feasible integer solutions. To the best of our knowledge, this is the first paper that applies column generation to a scheduling problem with different types of strongly ????‐hard pricing problems which are solved heuristically. The computational study demonstrates that our algorithms have a significant speed advantage over alternate methods, yield good lower bounds, and generate near‐optimal feasible integer solutions for problem instances with many machines and a realistically large number of jobs. © 2004 Wiley Periodicals, Inc. Naval Research Logistics, 2004. 相似文献
28.
为了满足多智能体应急反应仿真的需求,首先对构建多智能体应急反应仿真模拟框架的复杂性进行了分析,在此基础上提出并设计了组件式仿真模拟框架.采用本体(Ontology)建模、语义网模型及产生式规则推理等理论方法构建了仿真模拟框架的场景建模模块、人员Agent建模模块等组件.最后对依照上述研究内容所开发的原型系统进行了测试,对测试结果进行了分析,结果表明该框架能够有效满足多智能体应急反应仿真的建模需求. 相似文献
29.
The ability to cope with uncertainty in dynamic scheduling environments is becoming an increasingly important issue. In such environments, any disruption in the production schedule will translate into a disturbance of the plans for several external activities as well. Hence, from a practical point of view, deviations between the planned and realized schedules are to be avoided as much as possible. The term stability refers to this concern. We propose a proactive approach to generate efficient and stable schedules for a job shop subject to processing time variability and random machine breakdowns. In our approach, efficiency is measured by the makespan, and the stability measure is the sum of the variances of the realized completion times. Because the calculation of the original measure is mathematically intractable, we develop a surrogate stability measure. The version of the problem with the surrogate stability measure is proven to be NP‐hard, even without machine breakdowns; a branch‐and‐bound algorithm is developed for this problem variant. A tabu search algorithm is proposed to handle larger instances of the problem with machine breakdowns. The results of extensive computational experiments indicate that the proposed algorithms are quite promising in performance. © 2011 Wiley Periodicals, Inc. Naval Research Logistics, 2011 相似文献
30.
解析法区域覆盖卫星星座设计 总被引:1,自引:0,他引:1
对典型卫星星座进行了分析。使用解析方法,以卫星载荷的工作高度范围为约束条件,以有效利用卫星覆盖区域为原则,给出设计区域覆盖卫星星座的详细步骤,得出卫星轨道根数和星座轨道参数。利用卫星工具包(STK)生成卫星星座图。 相似文献