首页 | 本学科首页   官方微博 | 高级检索  
文章检索
  按 检索   检索词:      
出版年份:   被引次数:   他引次数: 提示:输入*表示无穷大
  收费全文   5篇
  免费   0篇
  2011年   1篇
  1982年   1篇
  1980年   1篇
  1979年   1篇
  1975年   1篇
排序方式: 共有5条查询结果,搜索用时 46 毫秒
1
1.
This paper is concerned with estimating p = P(X1 < Y …, Xn < Y) or q =P (X < Y1, …, X < Yn) where the X's and Y's are all independent random variables. Applications to estimation of the reliability p from stress-strength relationships are considered where a component is subject to several stresses X1, X2, …, XN whereas its strength, Y, is a single random variable. Similarly, the reliability q is of interest where a component is made of several parts all with their individual strengths Y1, Y2 …, YN and a single stress X is applied to the component. When the X's and Y's are independent and normal, maximum likelihood estimates of p and q have been obtained. For the case N = 2 and in some special cases, minimum variance unbiased estimates have been given. When the Y's are all exponential and the X is normal with known variance, but unknown mean (or uniform between 0 and θ, θ being unknown) the minimum variance unbiased estimate of q is established in this paper.  相似文献   
2.
This note consists of developing a method for enforcing additional constraints to linear fractional programs and showing its usefulness in solving integer linear fractional programs.  相似文献   
3.
In this paper we introduce a discrete state level crossing analysis and present some basic results and a key theorem of level crossings. We illustrate the fertility of the discrete state level crossing analysis by applying it to queueing systems with (i) bulk arrival, (ii) instantaneous feedback, (iii) limited waiting space, and (iv) to machine interference problems.  相似文献   
4.
We consider sequencing of n jobs which will arrive intermittently and are to be processed on a single machine; the arrival and the processing times of each jobs are assumed known. A schedule is to be developed that minimizes the mean flow time. Two models are considered: (i) when no pre-emption or inserted idle time is allowed in the schedule, and (ii) when pre-emption is allowed but the jobs follow a pre-empt-repeat discipline We illustrate that Cobham's and Phipp's SPT dispatching rule does not guarantee the optimum F? even for the non-preemptive model We propose a branch and bound algorithm for both models and discuss our computational experience We also examine the relative performances of the optimum nonpre-emptive sequence, and the optimum pre-empt-repeat sequence over that resulting from SPT dispatching rule on a large number of sets of jobs of varying sizes and tightness.  相似文献   
5.
We consider a discrete‐time groundwater model in which the cost of pumping takes a slightly different form to that which has been traditional in the research literature to date. This enables us to prove that (a) the optimal pumping quantity is nondecreasing in the ground water stock, (b) the stock level remaining after each period's pumping is also nondecreasing in the groundwater stock, (c) the optimal decision is determined by maximizing a concave function, and finally (d) the optimal pumping quantity is nonincreasing in the number of periods to go. We show that (a)–(c), while intuitive, do not hold under traditional modeling assumptions. We also explain the connections between our results and similar ones for some classic problems of operations research. © 2011 Wiley Periodicals, Inc. Naval Research Logistics 00: 000–000, 2011  相似文献   
1
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号