首页 | 本学科首页   官方微博 | 高级检索  
文章检索
  按 检索   检索词:      
出版年份:   被引次数:   他引次数: 提示:输入*表示无穷大
  收费全文   13篇
  免费   0篇
  2019年   1篇
  2018年   1篇
  2017年   1篇
  2016年   1篇
  2010年   1篇
  2009年   2篇
  2007年   1篇
  2006年   1篇
  2005年   2篇
  2004年   1篇
  2002年   1篇
排序方式: 共有13条查询结果,搜索用时 78 毫秒
1.
Having a robustly designed supply chain network is one of the most effective ways to hedge against network disruptions because contingency plans in the event of a disruption are often significantly limited. In this article, we study the facility reliability problem: how to design a reliable supply chain network in the presence of random facility disruptions with the option of hardening selected facilities. We consider a facility location problem incorporating two types of facilities, one that is unreliable and another that is reliable (which is not subject to disruption, but is more expensive). We formulate this as a mixed integer programming model and develop a Lagrangian Relaxation‐based solution algorithm. We derive structural properties of the problem and show that for some values of the disruption probability, the problem reduces to the classical uncapacitated fixed charge location problem. In addition, we show that the proposed solution algorithm is not only capable of solving large‐scale problems, but is also computationally effective. © 2009 Wiley Periodicals, Inc. Naval Research Logistics, 2010  相似文献   
2.
In this article, we propose a branch‐and‐price‐and‐cut (BPC) algorithm to exactly solve the manpower routing problem with synchronization constraints (MRPSC). Compared with the classical vehicle routing problems (VRPs), the defining characteristic of the MRPSC is that multiple workers are required to work together and start at the same time to carry out a job, that is, the routes of the scheduling subjects are dependent. The incorporation of the synchronization constraints increases the difficulty of the MRPSC significantly and makes the existing VRP exact algorithm inapplicable. Although there are many types of valid inequalities for the VRP or its variants, so far we can only adapt the infeasible path elimination inequality and the weak clique inequality to handle the synchronization constraints in our BPC algorithm. The experimental results at the root node of the branch‐and‐bound tree show that the employed inequalities can effectively improve the lower bound of the problem. Compared with ILOG CPLEX, our BPC algorithm managed to find optimal solutions for more test instances within 1 hour. © 2016 Wiley Periodicals, Inc. Naval Research Logistics 63: 138–171, 2016  相似文献   
3.
Among the multiple dimensions of the tous azimuths modernisation of Chinese naval forces, the development of China’s anti-access capacity has recently elicited considerable interest. The important link between this capacity and an overarching vision of the use of force – i.e. a naval doctrine – has, however, often been left implicit. This article shows that the particular development of China’s naval anti-access forces – more precisely, forces with an impact on the naval balance – can be explained by a shift of China’s naval doctrine towards a distinctly pre-emptive posture, which, itself, stems from the set of constraints imposed by the framework of ‘local war under informationised conditions’.  相似文献   
4.
In this work, we study manpower allocation with time windows and job‐teaming constraints. A set of jobs at dispersed locations requires teams of different types of workers where each job must be carried out in a preestablished time window and requires a specific length of time for completion. A job is satisfied if the required composite team can be brought together at the job's location for the required duration within the job's time window. The objective is to minimize a weighted sum of the total number of workers and the total traveling time. We show that construction heuristics used with simulated annealing is a good approach to solving this NP‐hard problem. In experiments, this approach is compared with solutions found using CPLEX and with lower bounds obtained from a network flow model. © 2005 Wiley Periodicals, Inc. Naval Research Logistics, 2005.  相似文献   
5.
In this paper, we study a m‐parallel machine scheduling problem with a non‐crossing constraint motivated by crane scheduling in ports. We decompose the problem to allow time allocations to be determined once crane assignments are known and construct a backtracking search scheme that manipulates domain reduction and pruning strategies. Simple approximation heuristics are developed, one of which guarantees solutions to be at most two times the optimum. For large‐scale problems, a simulated annealing heuristic that uses random neighborhood generation is provided. Computational experiments are conducted to test the algorithms. © 2006 Wiley Periodicals, Inc. Naval Research Logistics, 2007.  相似文献   
6.
7.
In this work, we examine port crane scheduling with spatial and separation constraints. Although common to most port operations, these constraints have not been previously studied. We assume that cranes cannot cross, there is a minimum distance between cranes and jobs cannot be done simultaneously. The objective is to find a crane‐to‐job matching which maximizes throughput under these constraints. We provide dynamic programming algorithms, a probabilistic tabu search, and a squeaky wheel optimization heuristic for solution. Experiments show the heuristics perform well compared with optimal solutions obtained by CPLEX for small scale instances where a squeaky wheel optimization with local search approach gives good results within short times. © 2004 Wiley Periodicals, Inc. Naval Research Logistics, 2004.  相似文献   
8.
Given an edge‐distance graph of a set of suppliers and clients, the bottleneck problem is to assign each client to a selected supplier minimizing their maximum distance. We introduce minimum quantity commitments to balance workloads of suppliers, provide the best possible approximation algorithm, and study its generalizations and specializations. © 2005 Wiley Periodicals, Inc. Naval Research Logistics, 2006  相似文献   
9.
This paper considers a three‐person rendezvous problem on the line which was introduced earlier by the authors. Three agents are placed at three consecutive integer value points on the real line, say 1, 2, and 3. Each agent is randomly faced towards the right or left. Agents are blind and have a maximum speed of 1. Their common aim is to gather at a common location as quickly as possible. The main result is the proof that a strategy given by V. Baston is the unique minimax strategy. Baston's strategy ensures a three way rendezvous in time at most 3.5 for any of the 3!23 = 48 possible initial configurations corresponding to positions and directions of each agent. A connection is established between the above rendezvous problem and a search problem of L. Thomas in which two parents search separately to find their lost child and then meet again. © 2002 Wiley Periodicals, Inc. Naval Research Logistics 49: 244–255, 2002; Published online in Wiley InterScience (www.interscience.wiley.com). DOI 10.1002/nav.10005  相似文献   
10.
A major challenge in making supply meet demand is to coordinate transshipments across the supply chain to reduce costs and increase service levels in the face of demand fluctuations, short lead times, warehouse limitations, and transportation and inventory costs. In particular, transshipment through crossdocks, where just‐in‐time objectives prevail, requires precise scheduling between suppliers, crossdocks, and customers. In this work, we study the transshipment problem with supplier and customer time windows where flow is constrained by transportation schedules and warehouse capacities. Transportation is provided by fixed or flexible schedules and lot‐sizing is dealt with through multiple shipments. We develop polynomial‐time algorithms or, otherwise, provide the complexity of the problems studied. © 2005 Wiley Periodicals, Inc. Naval Research Logistics, 2005  相似文献   
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号