1.
A genetic algorithm with neighborhood search for the resource‐constrained project scheduling problem
The resource‐constrained project scheduling problem (RCPSP) consists of a set of non‐preemptive activities that follow precedence relationship and consume resources. Under the limited amount of the resources, the objective of RCPSP is to find a schedule of the activities to minimize the project makespan. This article presents a new genetic algorithm (GA) by incorporating a local search strategy in GA operators. The local search strategy improves the efficiency of searching the solution space while keeping the randomness of the GA approach. Extensive numerical experiments show that the proposed GA with neighborhood search works well regarding solution quality and computational time compared with existing algorithms in the RCPSP literature, especially for the instances with a large number of activities. © 2011 Wiley Periodicals, Inc. Naval Research Logistics, 2011 相似文献
2.
3.
肖浩 《中国人民武装警察部队学院学报》2014,(9):57-60
“沉默的螺旋”理论启示我们:思想政治教育要通过“增强主旋律的影响力、发挥军人群体认同的渲染作用、发挥军人群体规范的制约作用、注重典型示范”来营造强大的“教育场”,以提高教育效果。 相似文献
4.
简述了弹载星敏感器几种应用方案的原理,从视场大小、导航星等、观星方式、像元分辨率、三轴姿态精度、动态性能、惯性基准误差分离等方面分析、比较了各种方案的优缺点.除平台方案外,捷联星图方案和单(双)星方案的技术参数相当,动态性能均有待提高.星图方案较单(双)星方案在2个方面占优势:一是星图方案不要求调整星敏感器光轴对准导航星,星跟踪算法等技术能快速识别星图;二是星图方案可同时、连续观测6~8颗星,解算出弹体三轴姿态,可以采用先进的滤波技术准确地分离惯性基准误差. 相似文献
5.
关于装备使用保障问题的探讨 总被引:2,自引:0,他引:2
使用保障作为装备综合保障工作的主要工作内容,是战斗力的重要组成部分.本文探讨了使用保障的基本概念、使用保障要求与使用保障方案以及使用保障分析等与使用保障有关的问题.目的在于介绍使用保障的基本概念,并对如何开展装备的使用保障工作进行了初步的探讨. 相似文献
6.
We introduce a formulation and an exact solution method for a nonpreemptive resource constrained project scheduling problem in which the duration/cost of an activity is determined by the mode selection and the duration reduction (crashing) within the mode. This problem is a natural combination of the time/cost tradeoff problem and the resource constrained project scheduling problem. It involves the determination, for each activity, of its resource requirements, the extent of crashing, and its start time so that the total project cost is minimized. We present a branch and bound procedure and report computational results with a set of 160 problems. Computational results demonstrate the effectiveness of our procedure. © 2001 John Wiley & Sons, Inc. Naval Research Logistics 48: 107–127, 2001 相似文献
7.
In this paper we consider the discrete time/resource trade-off problem in project networks. Given a project network consisting of nodes (activities) and arcs (technological precedence relations), in which the duration of the activities is a discrete, nonincreasing function of the amount of a single renewable resource committed to it, the discrete time/resource trade-off problem minimizes the project makespan subject to precedence constraints and a single renewable resource constraint. For each activity, a work content is specified such that all execution modes (duration/resource requirement pairs) for performing the activity are allowed as long as the product of the duration and the resource requirement is at least as large as the specified work content. We present a tabu search procedure which is based on a decomposition of the problem into a mode assignment phase and a resource-constrained project scheduling phase with fixed mode assignments. Extensive computational experience, including a comparison with other local search methods, is reported. © 1998 John Wiley & Sons, Inc. Naval Research Logistics 45: 553–578, 1998 相似文献
8.
影响因素难以量化是再制造发动机抽样方案选择过程中的难点,不可避免地给检验人员带来了主观性和片面性的问题。提出了应用模糊综合评价方法的解决方案,建立了再制造发动机抽样方案综合评价指标体系,详细阐述了综合评价方法的算法步骤,最后以某再制造发动机抽样方案的决策为例进行了实例应用。模糊综合评价方法解决了再制造发动机抽样方案选择中所遇到的问题,可为检验人员选择合理的抽样方案提供决策支持。 相似文献
9.
10.
Consider a project during the life cycle of which there are cash payouts and in‐flows. To better meet his financial commitments, the project owner would like to meet all deadlines without running out of cash. We show that the cash availability objective is similar to the total weighted flowtime used to measure work‐in‐progress performance in the scheduling and inventory control literatures. In this article we provide several specialized solution methods for the problem of minimizing total weighted flowtime in an arbitrary acyclic project network, subject to activity release times and due dates, where the activity weights may be positive or negative and represent cash in‐ and out‐flows. We describe the structure of an optimal solution and provide several efficient algorithms and their complexity based on mincost and maxflow formulations. © 2006 Wiley Periodicals, Inc. Naval Research Logistics, 2006 相似文献