Having a robustly designed supply chain network is one of the most effective ways to hedge against network disruptions because contingency plans in the event of a disruption are often significantly limited. In this article, we study the facility reliability problem: how to design a reliable supply chain network in the presence of random facility disruptions with the option of hardening selected facilities. We consider a facility location problem incorporating two types of facilities, one that is unreliable and another that is reliable (which is not subject to disruption, but is more expensive). We formulate this as a mixed integer programming model and develop a Lagrangian Relaxation‐based solution algorithm. We derive structural properties of the problem and show that for some values of the disruption probability, the problem reduces to the classical uncapacitated fixed charge location problem. In addition, we show that the proposed solution algorithm is not only capable of solving large‐scale problems, but is also computationally effective. © 2009 Wiley Periodicals, Inc. Naval Research Logistics, 2010 相似文献
2.
3.
We present methods for optimizing generation and storage decisions in an electricity network with multiple unreliable generators, each colocated with one energy storage unit (e.g., battery), and multiple loads under power flow constraints. Our model chooses the amount of energy produced by each generator and the amount of energy stored in each battery in every time period in order to minimize power generation and storage costs when each generator faces stochastic Markovian supply disruptions. This problem cannot be optimized easily using stochastic programming and/or dynamic programming approaches. Therefore, in this study, we present several heuristic methods to find an approximate optimal solution for this system. Each heuristic involves decomposing the network into several single‐generator, single‐battery, multiload systems and solving them optimally using dynamic programming, then obtaining a solution for the original problem by recombining. We discuss the computational performance of the proposed heuristics as well as insights gained from the models. © 2015 Wiley Periodicals, Inc. Naval Research Logistics 62: 493–511, 2015 相似文献
4.
为解决应急条件下装备器材供应过程中由于运力受扰而产生的干扰问题,基于干扰管理思想,提出了应急装备器材供应扰动恢复问题的转化策略,构建了基于虚拟需求点的运力受扰扰动恢复模型;为寻求最优解,设计了基于遗传算法的人工鱼群优化算法。通过算例对模型和算法的有效性进行了验证。 相似文献
5.
Uncertainties abound within a supply chain and have big impacts on its performance. We propose an integrated model for a three‐tiered supply chain network with one supplier, one or more facilities and retailers. This model takes into consideration the unreliable aspects of a supply chain. The properties of the optimal solution to the model are analyzed to reveal the impacts of supply uncertainty on supply chain design decisions. We also propose a general solution algorithm for this model. Computational experience is presented and discussed. © 2007 Wiley Periodicals, Inc. Naval Research Logistics, 2007 相似文献
6.
In some supply chains serious disruptions are system wide. This happens during periods of severe weather, as when storms cause shuttle tankers serving oil platforms in the North Sea to stop movements of crude oil, barges are frozen in the Mississippi, or all airplanes are grounded after a blizzard. Other notable instances of system‐wide disruption happened after the attack on the World Trade Center when all aircraft were grounded and the natural gas and crude‐oil pipelines were tangled by hurricanes in 2005. We model a situation where shutting down supply facilities is very difficult and expensive because of excessive inventory buildup from an inability to move out the production. We present a planning model that balances the cost of spare capacity versus shutting down production when planning for disruptions. The model uses an assignment model embedded in a simulation. © 2006 Wiley Periodicals, Inc. Naval Research Logistics, 2007 相似文献