首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 31 毫秒
1.
We study the problem of recovering a production plan after a disruption, where the disruption may be caused by incidents such as power failure, market change, machine breakdown, supply shortage, worker no‐show, and others. The new recovery plan we seek after has to not only suit the changed environment brought about by the disruption, but also be close to the initial plan so as not to cause too much customer unsatisfaction or inconvenience for current‐stage and downstream operations. For the general‐cost case, we propose a dynamic programming method for the problem. For the convex‐cost case, a general problem which involves both cost and demand disruptions can be solved by considering the cost disruption first and then the demand disruption. We find that a pure demand disruption is easy to handle; and for a pure cost disruption, we propose a greedy method which is provably efficient. Our computational studies also reveal insights that will be helpful to managing disruptions in production planning. © 2005 Wiley Periodicals, Inc. Naval Research Logistics, 2005.  相似文献   

2.
Unpredictable disruptive events significantly increase the difficulty of the management of automobile supply chains. In this paper, we propose an automobile production planning problem with component chips substitution in a finite planning horizon. The shortage of one chip can be compensated by another chip of the same type with a higher-end feature at an additional cost. Therefore, the automobile manufacturer can divert the on-hand inventory of chips to product lines that are more profitable in the event of shortages caused by supply chain disruptions. To cope with this, we propose a max-min robust optimization model that captures the uncertain supplies of chips. We show that the robust model has a mixed-integer programming equivalence that can be solved by a commercial IP solver directly. We compare the max-min robust model with the corresponding deterministic and two-stage stochastic models for the same problem through extensive numerical experiments. The computational results show that the max-min robust model outperforms the other two models in terms of the average and worst-case profits.  相似文献   

3.
We present a robust optimization model for production planning under the assumption that electricity supply is subject to uncertain interruptions caused by participation in interruptible load contracts (ILCs). The objective is to minimize the cost of electricity used for production while providing a robust production plan which ensures demand satisfaction under all possible interruption scenarios. The combinatorial size of the set of interruption scenarios makes this a challenging problem. Furthermore, we assume that no probabilistic information is known about the supply uncertainty: we only use the information given in the ILC to identify an uncertainty set that captures the possible scenarios. We construct a general robust framework to handle this uncertainty and present a heuristic to compute a good feasible solution of the robust model. We provide computational experiments on a real‐world example and compare the performance of an exact solver applied to the robust model with that of the heuristic procedure. Finally, we include the operational impact of interruptions such as “recovery modes” in the definition of the uncertainty set. © 2013 Wiley Periodicals, Inc. Naval Research Logistics, 2013  相似文献   

4.
We present methods for optimizing generation and storage decisions in an electricity network with multiple unreliable generators, each colocated with one energy storage unit (e.g., battery), and multiple loads under power flow constraints. Our model chooses the amount of energy produced by each generator and the amount of energy stored in each battery in every time period in order to minimize power generation and storage costs when each generator faces stochastic Markovian supply disruptions. This problem cannot be optimized easily using stochastic programming and/or dynamic programming approaches. Therefore, in this study, we present several heuristic methods to find an approximate optimal solution for this system. Each heuristic involves decomposing the network into several single‐generator, single‐battery, multiload systems and solving them optimally using dynamic programming, then obtaining a solution for the original problem by recombining. We discuss the computational performance of the proposed heuristics as well as insights gained from the models. © 2015 Wiley Periodicals, Inc. Naval Research Logistics 62: 493–511, 2015  相似文献   

5.
Having a robustly designed supply chain network is one of the most effective ways to hedge against network disruptions because contingency plans in the event of a disruption are often significantly limited. In this article, we study the facility reliability problem: how to design a reliable supply chain network in the presence of random facility disruptions with the option of hardening selected facilities. We consider a facility location problem incorporating two types of facilities, one that is unreliable and another that is reliable (which is not subject to disruption, but is more expensive). We formulate this as a mixed integer programming model and develop a Lagrangian Relaxation‐based solution algorithm. We derive structural properties of the problem and show that for some values of the disruption probability, the problem reduces to the classical uncapacitated fixed charge location problem. In addition, we show that the proposed solution algorithm is not only capable of solving large‐scale problems, but is also computationally effective. © 2009 Wiley Periodicals, Inc. Naval Research Logistics, 2010  相似文献   

6.
We consider a class of facility location problems with a time dimension, which requires assigning every customer to a supply facility in each of a finite number of periods. Each facility must meet all assigned customer demand in every period at a minimum cost via its production and inventory decisions. We provide exact branch‐and‐price algorithms for this class of problems and several important variants. The corresponding pricing problem takes the form of an interesting class of production planning and order selection problems. This problem class requires selecting a set of orders that maximizes profit, defined as the revenue from selected orders minus production‐planning‐related costs incurred in fulfilling the selected orders. We provide polynomial‐time dynamic programming algorithms for this class of pricing problems, as well as for generalizations thereof. Computational testing indicates the advantage of our branch‐and‐price algorithm over various approaches that use commercial software packages. These tests also highlight the significant cost savings possible from integrating location with production and inventory decisions and demonstrate that the problem is rather insensitive to forecast errors associated with the demand streams. © 2011 Wiley Periodicals, Inc. Naval Research Logistics, 2011  相似文献   

7.
We develop models that lend insight into how to design systems that enjoy economies of scale in their operating costs, when those systems will subsequently face disruptions from accidents, acts of nature, or an intentional attack from a well‐informed attacker. The systems are modeled as parallel M/M/1 queues, and the key question is how to allocate service capacity among the queues to make the system resilient to worst‐case disruptions. We formulate this problem as a three‐level sequential game of perfect information between a defender and a hypothetical attacker. The optimal allocation of service capacity to queues depends on the type of attack one is facing. We distinguish between deterministic incremental attacks, where some, but not all, of the capacity of each attacked queue is knocked out, and zero‐one random‐outcome (ZORO) attacks, where the outcome is random and either all capacity at an attacked queue is knocked out or none is. There are differences in the way one should design systems in the face of incremental or ZORO attacks. For incremental attacks it is best to concentrate capacity. For ZORO attacks the optimal allocation is more complex, typically, but not always, involving spreading the service capacity out somewhat among the servers. © 2011 Wiley Periodicals, Inc. Naval Research Logistics, 2011  相似文献   

8.
We consider a generalization of the well‐known generalized assignment problem (GAP) over discrete time periods encompassed within a finite planning horizon. The resulting model, MultiGAP, addresses the assignment of tasks to agents within each time period, with the attendant single‐period assignment costs and agent‐capacity constraint requirements, in conjunction with transition costs arising between any two consecutive periods in which a task is reassigned to a different agent. As is the case for its single‐period antecedent, MultiGAP offers a robust tool for modeling a wide range of capacity planning problems occurring within supply chain management. We provide two formulations for MultiGAP and establish that the second (alternative) formulation provides a tighter bound. We define a Lagrangian relaxation‐based heuristic as well as a branch‐and‐bound algorithm for MultiGAP. Computational experience with the heuristic and branch‐and‐bound algorithm on over 2500 test problems is reported. The Lagrangian heuristic consistently generates high‐quality and in many cases near‐optimal solutions. The branch‐and‐bound algorithm is also seen to constitute an effective means for solving to optimality MultiGAP problems of reasonable size. © 2012 Wiley Periodicals, Inc. Naval Research Logistics, 2012  相似文献   

9.
We develop an approximate planning model for a distributed computing network in which a control system oversees the assignment of information flows and tasks to a pool of shared computers, and describe several optimization applications using the model. We assume that the computers are multithreaded, and have differing architectures leading to varying and inconsistent processing rates. The model is based on a discrete‐time, continuous flow model developed by Graves [Oper Res 34 (1986), 522–533] which provides the steady‐state moments of production and work‐in‐queue quantities. We make several extensions to Graves' model to represent distributed computing networks. First, we approximately model control rules that are nonlinear functions of the work‐in‐queue at multiple stations through a linearization approach. Second, we introduce an additional noise term on production and show its use in modeling the discretization of jobs. Third, we model groups of heterogeneous computers as aggregate, “virtual computing cells” that process multiple tasks simultaneously, using a judiciously selected control rule. © 2005 Wiley Periodicals, Inc. Naval Research Logistics, 2005.  相似文献   

10.
We address the problem of inventory management in a two‐location inventory system, in which the transshipments are carried out as means of emergency or alternative supply after demand has been realized. This model differs from previous ones as regards its replenishment costs structure, in which nonnegligible fixed replenishment costs and a joint replenishment cost are considered. The single period planning horizon is analyzed, with the form and several properties of the optimal replenishment and transshipment policies developed, discussed and illustrated. © 1999 John Wiley & Sons, Inc. Naval Research Logistics 46: 525–547, 1999  相似文献   

11.
We consider a multi‐stage inventory system composed of a single warehouse that receives a single product from a single supplier and replenishes the inventory of n retailers through direct shipments. Fixed costs are incurred for each truck dispatched and all trucks have the same capacity limit. Costs are stationary, or more generally monotone as in Lippman (Management Sci 16, 1969, 118–138). Demands for the n retailers over a planning horizon of T periods are given. The objective is to find the shipment quantities over the planning horizon to satisfy all demands at minimum system‐wide inventory and transportation costs without backlogging. Using the structural properties of optimal solutions, we develop (1) an O(T2) algorithm for the single‐stage dynamic lot sizing problem; (2) an O(T3) algorithm for the case of a single‐warehouse single‐retailer system; and (3) a nested shortest‐path algorithm for the single‐warehouse multi‐retailer problem that runs in polynomial time for a given number of retailers. To overcome the computational burden when the number of retailers is large, we propose aggregated and disaggregated Lagrangian decomposition methods that make use of the structural properties and the efficient single‐stage algorithm. Computational experiments show the effectiveness of these algorithms and the gains associated with coordinated versus decentralized systems. Finally, we show that the decentralized solution is asymptotically optimal. © 2009 Wiley Periodicals, Inc. Naval Research Logistics 2009  相似文献   

12.
We study an infinite horizon periodic stochastic inventory system consisting of retail outlets and customers located on a homogenous line segment. In each period, the total demand, generated by the customers on the line, is normally distributed. To better match supply and demand, we incorporate lateral transshipments. We propose a compact model in which the strategic decisions—the number and locations of retail outlets—are determined simultaneously with the operational decisions—the inventory replenishment and transshipment quantities. We find the optimal balance between the risk‐pooling considerations, which drive down the optimal number of retail outlets, and lateral transshipments, which drive up the optimal number of retail outlets. We also explore the sensitivity of the optimal number of retail outlets to various problem parameters. This article presents a novel way of integrating lateral transshipments in the context of an inventory‐location model. © 2011 Wiley Periodicals, Inc. Naval Research Logistics, 2011  相似文献   

13.
An important aspect of supply chain management is dealing with demand and supply uncertainty. The uncertainty of future supply can be reduced if a company is able to obtain advance capacity information (ACI) about future supply/production capacity availability from its supplier. We address a periodic‐review inventory system under stochastic demand and stochastic limited supply, for which ACI is available. We show that the optimal ordering policy is a state‐dependent base‐stock policy characterized by a base‐stock level that is a function of ACI. We establish a link with inventory models that use advance demand information (ADI) by developing a capacitated inventory system with ADI, and we show that equivalence can only be set under a very specific and restrictive assumption, implying that ADI insights will not necessarily hold in the ACI environment. Our numerical results reveal several managerial insights. In particular, we show that ACI is most beneficial when there is sufficient flexibility to react to anticipated demand and supply capacity mismatches. Further, most of the benefits can be achieved with only limited future visibility. We also show that the system parameters affecting the value of ACI interact in a complex way and therefore need to be considered in an integrated manner. © 2011 Wiley Periodicals, Inc. Naval Research Logistics, 2011  相似文献   

14.
This article describes the Distributed Interaction Campaign Model (DICM), an exploratory campaign analysis tool and asset allocation decision‐aid for managing geographically distributed and swarming naval and air forces. The model is capable of fast operation, while accounting for uncertainty in an opponent's plan. It is intended for use by commanders and analysts who have limited time for model runs, or a finite budget. The model is purpose‐built for the Pentagon's Office of Net Assessment, and supports analysis of the following questions: What happens when swarms of geographically distributed naval and air forces engage each other and what are the key elements of the opponents’ force to attack? Are there changes to force structure that make a force more effective, and what impacts will disruptions in enemy command and control and wide‐area surveillance have? Which insights are to be gained by fast exploratory mathematical/computational campaign analysis to augment and replace expensive and time‐consuming simulations? An illustrative example of model use is described in a simple test scenario. © 2016 Wiley Periodicals, Inc. Naval Research Logistics 63: 562–576, 2016  相似文献   

15.
In this paper, we present a continuous time optimal control model for studying a dynamic pricing and inventory control problem for a make‐to‐stock manufacturing system. We consider a multiproduct capacitated, dynamic setting. We introduce a demand‐based model where the demand is a linear function of the price, the inventory cost is linear, the production cost is an increasing strictly convex function of the production rate, and all coefficients are time‐dependent. A key part of the model is that no backorders are allowed. We introduce and study an algorithm that computes the optimal production and pricing policy as a function of the time on a finite time horizon, and discuss some insights. Our results illustrate the role of capacity and the effects of the dynamic nature of demand in the model. © 2007 Wiley Periodicals, Inc. Naval Research Logistics, 2007  相似文献   

16.
The quick response (QR) system that can cope with demand volatility by shortening lead time has been well studied in the literature. Much of the existing literature assumes implicitly or explicitly that the manufacturers under QR can always meet the demand because the production capacity is always sufficient. However, when the order comes with a short lead time under QR, availability of the manufacturer's production capacity is not guaranteed. This motivates us to explore QR in supply chains with stochastic production capacity. Specifically, we study QR in a two-echelon supply chain with Bayesian demand information updating. We consider the situation where the manufacturer's production capacity under QR is uncertain. We first explore how stochastic production capacity affects supply chain decisions and QR implementation. We then incorporate the manufacturer's ability to expand capacity into the model. We explore how the manufacturer determines the optimal capacity expansion decision, and the value of such an ability to the supply chain and its agents. Finally, we extend the model to the two-stage two-ordering case and derive the optimal ordering policy by dynamic programming. We compare the single-ordering and two-ordering cases to generate additional managerial insights about how ordering flexibility affects QR when production capacity is stochastic. We also explore the transparent supply chain and find that our main results still hold.  相似文献   

17.
We develop a risk‐sensitive strategic facility sizing model that makes use of readily obtainable data and addresses both capacity and responsiveness considerations. We focus on facilities whose original size cannot be adjusted over time and limits the total production equipment they can hold, which is added sequentially during a finite planning horizon. The model is parsimonious by design for compatibility with the nature of available data during early planning stages. We model demand via a univariate random variable with arbitrary forecast profiles for equipment expansion, and assume the supporting equipment additions are continuous and decided ex‐post. Under constant absolute risk aversion, operating profits are the closed‐form solution to a nontrivial linear program, thus characterizing the sizing decision via a single first‐order condition. This solution has several desired features, including the optimal facility size being eventually decreasing in forecast uncertainty and decreasing in risk aversion, as well as being generally robust to demand forecast uncertainty and cost errors. We provide structural results and show that ignoring risk considerations can lead to poor facility sizing decisions that deteriorate with increased forecast uncertainty. Existing models ignore risk considerations and assume the facility size can be adjusted over time, effectively shortening the planning horizon. Our main contribution is in addressing the problem that arises when that assumption is relaxed and, as a result, risk sensitivity and the challenges introduced by longer planning horizons and higher uncertainty must be considered. Finally, we derive accurate spreadsheet‐implementable approximations to the optimal solution, which make this model a practical capacity planning tool.© 2008 Wiley Periodicals, Inc. Naval Research Logistics, 2008  相似文献   

18.
We explore the management of inventory for stochastic-demand systems, where the product's supply is randomly disrupted for periods of random duration, and demands that arrive when the inventory system is temporarily out of stock become a mix of backorders and lost sales. The stock is managed according to the following modified (s, S) policy: If the inventory level is at or below s and the supply is available, place an order to bring the inventory level up to S. Our analysis yields the optimal values of the policy parameters, and provides insight into the optimal inventory strategy when there are changes in the severity of supply disruptions or in the behavior of unfilled demands. © 1998 John Wiley & Sons, Inc. Naval Research Logistics 45: 687–703, 1998  相似文献   

19.
This article addresses the concept of quality risk in outsourcing. Recent trends in outsourcing extend a contract manufacturer's (CM's) responsibility to several functional areas, such as research and development and design in addition to manufacturing. This trend enables an original equipment manufacturer (OEM) to focus on sales and pricing of its product. However, increasing CM responsibilities also suggest that the OEM's product quality is mainly determined by its CM. We identify two factors that cause quality risk in this outsourcing relationship. First, the CM and the OEM may not be able to contract on quality; second, the OEM may not know the cost of quality to the CM. We characterize the effects of these two quality risk factors on the firms' profits and on the resulting product quality. We determine how the OEM's pricing strategy affects quality risk. We show, for example, that the effect of noncontractible quality is higher than the effect of private quality cost information when the OEM sets the sales price after observing the product's quality. We also show that committing to a sales price mitigates the adverse effect of quality risk. To obtain these results, we develop and analyze a three‐stage decision model. This model is also used to understand the impact of recent information technologies on profits and product quality. For example, we provide a decision tree that an OEM can use in deciding whether to invest in an enterprise‐wide quality management system that enables accounting of quality‐related activities across the supply chain. © 2009 Wiley Periodicals, Inc. Naval Research Logistics 2009  相似文献   

20.
Models for integrated production and demand planning decisions can serve to improve a producer's ability to effectively match demand requirements with production capabilities. In contexts with price‐sensitive demands, economies of scale in production, and multiple capacity options, such integrated planning problems can quickly become complex. To address these complexities, this paper provides profit‐maximizing production planning models for determining optimal demand and internal production capacity levels under price‐sensitive deterministic demands, with subcontracting and overtime options. The models determine a producer's optimal price, production, inventory, subcontracting, overtime, and internal capacity levels, while accounting for production economies of scale and capacity costs through concave cost functions. We use polyhedral properties and dynamic programming techniques to provide polynomial‐time solution approaches for obtaining an optimal solution for this class of problems when the internal capacity level is time‐invariant. © 2007 Wiley Periodicals, Inc. Naval Research Logistics, 2007  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号