首页 | 本学科首页   官方微博 | 高级检索  
文章检索
  按 检索   检索词:      
出版年份:   被引次数:   他引次数: 提示:输入*表示无穷大
  收费全文   24篇
  免费   4篇
  国内免费   1篇
  2021年   2篇
  2019年   2篇
  2015年   1篇
  2014年   3篇
  2012年   1篇
  2011年   1篇
  2010年   2篇
  2008年   2篇
  2007年   2篇
  2006年   2篇
  2005年   2篇
  2004年   2篇
  2003年   1篇
  2001年   1篇
  2000年   2篇
  1998年   1篇
  1994年   1篇
  1990年   1篇
排序方式: 共有29条查询结果,搜索用时 15 毫秒
1.
2.
This article demonstrates a novel approach for material nonlinear analysis. This analysis procedure eliminates tedious and lengthy step by step incremental and then iterative procedure adopted classically and gives direct results in the linear as well as in nonlinear range of the material behavior. Use of elastic moduli is eliminated. Instead, stress and strain functions are used as the material input in the analysis procedure. These stress and strain functions are directly derived from the stress-strain behavior of the material by the method of curve fitting. This way, the whole stress-strain diagram is utilized in the analysis which naturally exposes the response of structure when loading is in nonlinear range of the material behavior. It is found that it is an excellent computational procedure adopted so far for material nonlinear analysis which gives very accurate results, easy to adopt and simple in calculations. The method eliminates all types of linearity assumptions in basic derivations of equations and hence, eliminates all types of possibility of errors in the analysis procedure as well. As it is required to know stress distribution in the structural body by proper modelling and structural idealization, the proposed analysis approach can be regarded as stress-based analysis procedure. Basic problems such as uniaxial problem, beam bending, and torsion problems are solved. It is found that approach is very suitable for solving the problems of fracture mechanics. Energy release rate for plate with center crack and double cantilever beam specimen is also evaluated. The approach solves the fracture problem with relative ease in strength of material style calculations. For all problems, results are compared with the classical displacement-based liner theory.  相似文献   
3.
Reactive Materials (RMs), a new material with structural and energy release characteristics under shock-induced chemical reactions, are promising in extensive applications in national defense and military fields. They can increase the lethality of warheads due to their dual functionality. This paper focuses on the energy release characteristics of RM casings prepared by alloy melting and casting process under explosive loading. Explosion experiments of RM and conventional 2A12 aluminum alloy casings were conducted in free field to capture the explosive fireballs, temperature distribution, peak overpressure of the air shock wave and the fracture morphology of fragments of reactive material (RM) warhead casings by using high-speed camera, infrared thermal imager temperature and peak overpressure testing and scanning electron microscope. Results showed that an increase of both the fireball temperature and air shock wave were observed in all RM casings compared to conventional 2A12 aluminum ally casings. The RM casings can improve the peak overpressure of the air shock wave under explosion loading, though the results are different with different charge ratios. According to the energy release characteristics of the RM, increasing the thickness of RM casings will increase the peak overpressure of the near-field air shock wave, while reducing the thickness will increase the peak overpressure of the far-field air shock wave.  相似文献   
4.
建立标准信息管理系统的难点在于为内容广泛的标准确定统一的描述形式,建立公开高效的标准发布方式和满足用户个性化检索需求.从标准信息的表现形式出发,建立了标准统一描述形式;通过关键词检索服务和命令检索服务建立了高效的标准发布方式;通过身份认证服务和用户订阅服务满足了用户个性化检索需求.  相似文献   
5.
分析了地下停车库的火灾特点,并从停车库的火灾规模、发生轰燃的烟气条件、释放辐射热的大小、相邻汽车被引燃的临界条件和自动喷水系统的动作时间等几方面对停车库潜在的火灾危险性进行了探讨。以某地下一层停车库为例,对其火灾风险进行了具体评价。  相似文献   
6.
为了解决洞库工程教学训练缺乏直观性和实践性的难题,利用Revit,Sketch Up和3D Max软件进行三维模型构建,以漫游中的基本图形变换和位置实时显示技术为例介绍了相关数学原理及Virtools编程实现过程,实现预定功能后发布了洞库工程维护管理虚拟训练系统。该虚拟训练系统具有功能演示、虚拟漫游、虚拟施工、维护管理虚拟训练和考核评估等功能,可以让学员身临其境地学习洞库工程维护管理的相关知识,有效地提高了教学效果。  相似文献   
7.
In this paper, we consider just‐in‐time job shop environments (job shop problems with an objective of minimizing the sum of tardiness and inventory costs), subject to uncertainty due to machine failures. We present techniques for proactive uncertainty management that exploit prior knowledge of uncertainty to build competitive release dates, whose execution improves performance. These techniques determine the release dates of different jobs based on measures of shop load, statistical data of machine failures, and repairs with a tradeoff between inventory and tardiness costs. Empirical results show that our methodology is very promising in comparison with simulated annealing and the best of 39 combinations of dispatch rules & release policies, under different frequencies of breakdowns. We observe that the performance of the proactive technique compared to the other two approaches improves in schedule quality (maximizing delivery performance while minimizing costs) with increase in frequency of breakdowns. The proactive technique presented here is also computationally less expensive than the other two approaches. © 2004 Wiley Periodicals, Inc. Naval Research Logistics, 2004  相似文献   
8.
消防应急救援信息具有信息基数大、隐性程度高、时效性强的特点。对消防应急救援中的信息实行公开,有利于维护社会稳定、普及防灾减灾知识、塑造消防部队的良好形象。消防应急救援信息的公开应坚持真实性、及时性、口径一致的原则,建立信息收集研判机制、与媒体的沟通机制、新闻发言人制度、网络舆情应对机制。  相似文献   
9.
The paper deals with a problem of scheduling a set of jobs on a single machine. Before a job is released for processing, it must undergo some preprocessing treatment that consumes resources. It is assumed that the release date of a job is a linear decreasing continuous function of the amount of a locally and globally constrained, continuously divisible resource (e.g., energy, catalyzer, financial outlay, gas). The problem is to find a sequence of jobs and a resource allocation that will minimize the maximum job completion time. Such a problem appears, for example, in the ingot preheating and hot-rolling process in steel mills. It is shown that the problem is strongly NP-hard. Some polynomially solvable cases of the problem and approximate algorithms with both experimental and worst-case analysis are presented. © 1998 John Wiley & Sons, Inc. Naval Research Logistics 45: 99–113, 1998  相似文献   
10.
We consider a class of production scheduling models with m identical machines in parallel and k different product types. It takes a time pi to produce one unit of product type i on any one of the machines. There is a demand stream for product type i consisting of ni units with each unit having a given due date. Before a machine starts with the production of a batch of products of type i a setup cost c is incurred. We consider several different objective functions. Each one of the objective functions has three components, namely a total setup cost, a total earliness cost, and a total tardiness cost. In our class of problems we find a relatively large number of problems that can be solved either in polynomial time or in pseudo‐polynomial time. The polynomiality or pseudo‐polynomiality is achieved under certain special conditions that may be of practical interest; for example, a regularity pattern in the string of due dates combined with earliness and tardiness costs that are similar for different types of products. The class of models we consider includes as special cases discrete counterparts of a number of inventory models that have been considered in the literature before, e.g., Wagner and Whitin (Manage Sci 5 (1958), 89–96) and Zangwill (Oper Res 14 (1966), 486–507; Manage Sci 15 (1969), 506–527). © 2008 Wiley Periodicals, Inc. Naval Research Logistics, 2008  相似文献   
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号