首页 | 本学科首页   官方微博 | 高级检索  
文章检索
  按 检索   检索词:      
出版年份:   被引次数:   他引次数: 提示:输入*表示无穷大
  收费全文   13篇
  免费   4篇
  国内免费   2篇
  2020年   1篇
  2017年   1篇
  2016年   3篇
  2015年   1篇
  2014年   1篇
  2013年   3篇
  2012年   2篇
  2010年   2篇
  2009年   1篇
  2006年   1篇
  2005年   1篇
  2004年   2篇
排序方式: 共有19条查询结果,搜索用时 18 毫秒
1.
We consider the problem of scheduling a set of n jobs on a single batch machine, where several jobs can be processed simultaneously. Each job j has a processing time pj and a size sj. All jobs are available for processing at time 0. The batch machine has a capacity D. Several jobs can be batched together and processed simultaneously, provided that the total size of the jobs in the batch does not exceed D. The processing time of a batch is the largest processing time among all jobs in the batch. There is a single vehicle available for delivery of the finished products to the customer, and the vehicle has capacity K. We assume that K = rD, where and r is an integer. The travel time of the vehicle is T; that is, T is the time from the manufacturer to the customer. Our goal is to find a schedule of the jobs and a delivery plan so that the service span is minimized, where the service span is the time that the last job is delivered to the customer. We show that if the jobs have identical sizes, then we can find a schedule and delivery plan in time such that the service span is minimum. If the jobs have identical processing times, then we can find a schedule and delivery plan in time such that the service span is asymptotically at most 11/9 times the optimal service span. When the jobs have arbitrary processing times and arbitrary sizes, then we can find a schedule and delivery plan in time such that the service span is asymptotically at most twice the optimal service span. We also derive upper bounds of the absolute worst‐case ratios in both cases. © 2015 Wiley Periodicals, Inc. Naval Research Logistics 62: 470–482, 2015  相似文献   
2.
We consider the problem of scheduling a set of jobs on a single machine subject to random breakdowns. We focus on the preemptive‐repeat model, which addresses the situation where, if a machine breaks down during the processing of a job, the work done on the job prior to the breakdown is lost and the job will have to be started from the beginning again when the machine resumes its work. We allow that (i) the uptimes and downtimes of the machine follow general probability distributions, (ii) the breakdown process of the machine depends upon the job being processed, (iii) the processing times of the jobs are random variables following arbitrary distributions, and (iv) after a breakdown, the processing time of a job may either remain a same but unknown amount, or be resampled according to its probability distribution. We first derive the optimal policy for a class of problems under the criterion to maximize the expected discounted reward earned from completing all jobs. The result is then applied to further obtain the optimal policies for other due date‐related criteria. We also discuss a method to compute the moments and probability distributions of job completion times by using their Laplace transforms, which can convert a general stochastic scheduling problem to its deterministic equivalent. The weighted squared flowtime problem and the maintenance checkup and repair problem are analyzed as applications. © 2004 Wiley Periodicals, Inc. Naval Research Logistics, 2004  相似文献   
3.
The coordination of production, supply, and distribution is an important issue in logistics and operations management. This paper develops and analyzes a single‐machine scheduling model that incorporates the scheduling of jobs and the pickup and delivery arrangements of the materials and finished jobs. In this model, there is a capacitated pickup and delivery vehicle that travels between the machine and the storage area, and the objective is to minimize the makespan of the schedule. The problem is strongly NP‐hard in general but is solvable in polynomial time when the job processing sequence is predetermined. An efficient heuristic is developed for the general problem. The effectiveness of the heuristic is studied both analytically and computationally. © 2005 Wiley Periodicals, Inc. Naval Research Logistics, 2005.  相似文献   
4.
一种新型内曲线式径向柱塞泵的设计   总被引:1,自引:0,他引:1  
讨论了各种液压泵的使用特点,提出了一种新型内曲线式径向柱塞泵的设计思路.通过合理设计泵内定子内曲线表面,在理论上实现了无流量脉动;为了提高柱塞泵的使用寿命,采取了降低定子导轨压力角的措施;通过Matlab实现了定子表面曲线和压力角的仿真计算;理论分析的结果对于设计和制造低噪声的柱塞式液压泵有一定的指导意义.  相似文献   
5.
Facing fierce competition from rivals, sellers in online marketplaces are eager to improve their sales by delivering items faster and more reliably. Because logistics quality can be known only after a transaction, sellers must identify effective ways to communicate logistics information to consumers. Drawing on the accessibility-diagnosticity framework, we theorize that the sales impacts of logistics information depend on its relative diagnostic value. Using data on 1493 items with 505,785 consumer reviews from an online marketplace, we examine how sales are affected by three information sources for logistics services: online word of mouth (WOM) about logistics, self-reported logistics services, and expected delivery time. We use an instrumental variable method to address the endogeneity issue between sales and WOM. We find that, ceteris paribus, consumers give more weight to WOM about logistics and delivery time when they make purchase decisions but less weight to self-reported logistics service. The effects of logistics information on sales are asymmetric for large and small sellers.  相似文献   
6.
We consider a capacitated inventory model with flexible delivery upgrades, in which the seller allocates its on‐hand inventory to price‐ and delivery‐time‐sensitive customers. The seller has two decisions: inventory commitment and replenishment. The former addresses how the on‐hand inventories are allocated between the two classes of customers within an inventory cycle. The latter addresses how the inventory is replenished between inventory cycles. We develop optimal inventory allocation, upgrade, and replenishment policies and demonstrate that the optimal policy can be characterized by a set of switching curves. © 2014 Wiley Periodicals, Inc. Naval Research Logistics 61: 418–426, 2014  相似文献   
7.
基于动态贝叶斯网的炮兵战斗效果评估建模仿真   总被引:1,自引:0,他引:1  
依据炮兵火力作战的特点规律,分析炮兵战斗效果评估的内容、程序、建模过程和影响因素,运用动态Bayesian网建立炮兵战斗效果评估模型,运用主成分分析方法确定评估专家权重,运用Poly Tree的消息传递算法进行评估网络推理分析,最后结合案例仿真验证。结果表明,该研究解决了情报信息不确定性、模糊性和动态性等影响战斗效果精确评估问题。  相似文献   
8.
针对相控阵天线阵面备件配置存在的冗余性强、批量送修、多级维修等现实问题,综合考虑备件费用、维修能力以及库存策略之间的关系,建立了基于定期补给的两级备件优化配置模型。给出了系统的故障件维修周转过程和维修备件的定期补给过程,在分析备件、库存、维修能力之间关系的基础上,结合成批到达的排队理论,建立了系统的供应可用度模型。以备件配置费用最小为目标、以系统供应可用度为约束条件,建立了系统的备件优化配置模型,并通过边际效益分析法对模型进行了求解。通过算例仿真与分析对模型进行了验证。结果表明:构建的备件配置能够较好地解决相控阵天线阵面的备件配置问题,具有一定的优越性。  相似文献   
9.
随着时钟频率的增加以及电源电压的降低,电源完整性问题日益凸显。将电流变化率加入到最差噪声算法的电流约束中,能够在任意电流变化率的情况下分析电源分布网络的最差噪声,从而获得更加真实的最差噪声。另外,利用改进的Knuth-Yao四边形不等式法对基于动态规划的最差噪声算法进行加速,加速后算法的时间复杂度从O(n~2m)降为O(mnlogn)。  相似文献   
10.
Motivated by the flow of products in the iron and steel industry, we study an identical and parallel machine scheduling problem with batch deliveries, where jobs finished on the parallel machines are delivered to customers in batches. Each delivery batch has a capacity and incurs a cost. The objective is to find a coordinated production and delivery schedule that minimizes the total flow time of jobs plus the total delivery cost. This problem is an extension of the problem considered by Hall and Potts, Ann Oper Res 135 (2005) 41–64, who studied a two‐machine problem with an unbounded number of transporters and unbounded delivery capacity. We first provide a dynamic programming algorithm to solve a special case with a given job assignment to the machines. A heuristic algorithm is then presented for the general problem, and its worst‐case performance ratio is analyzed. The computational results show that the heuristic algorithm can generate near‐optimal solutions. Finally, we offer a fully polynomial‐time approximation scheme for a fixed number of machines. © 2016 Wiley Periodicals, Inc. Naval Research Logistics 63: 492–502, 2016  相似文献   
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号