排序方式: 共有85条查询结果,搜索用时 687 毫秒
1.
依据中华人民共和国公安部印发的《建筑工程消防验收评定暂行办法》,建立了建筑工程消防验收系统。依据层次分析法对分级系统中各指标层,利用专家打分法确定其权重,设定不同的等级,确定不同等级下的权重系数,从而计算出建筑工程消防验收定量评定的标准。 相似文献
2.
A genetic algorithm with neighborhood search for the resource‐constrained project scheduling problem
The resource‐constrained project scheduling problem (RCPSP) consists of a set of non‐preemptive activities that follow precedence relationship and consume resources. Under the limited amount of the resources, the objective of RCPSP is to find a schedule of the activities to minimize the project makespan. This article presents a new genetic algorithm (GA) by incorporating a local search strategy in GA operators. The local search strategy improves the efficiency of searching the solution space while keeping the randomness of the GA approach. Extensive numerical experiments show that the proposed GA with neighborhood search works well regarding solution quality and computational time compared with existing algorithms in the RCPSP literature, especially for the instances with a large number of activities. © 2011 Wiley Periodicals, Inc. Naval Research Logistics, 2011 相似文献
3.
4.
简述了弹载星敏感器几种应用方案的原理,从视场大小、导航星等、观星方式、像元分辨率、三轴姿态精度、动态性能、惯性基准误差分离等方面分析、比较了各种方案的优缺点.除平台方案外,捷联星图方案和单(双)星方案的技术参数相当,动态性能均有待提高.星图方案较单(双)星方案在2个方面占优势:一是星图方案不要求调整星敏感器光轴对准导航星,星跟踪算法等技术能快速识别星图;二是星图方案可同时、连续观测6~8颗星,解算出弹体三轴姿态,可以采用先进的滤波技术准确地分离惯性基准误差. 相似文献
5.
基于Vague集的装备采购项目组织结构评价方法 总被引:2,自引:0,他引:2
在装备采购项目组织评价中引入Vague集理论,在列举现有项目组织结构类型的基础上,构建项目组织结构评价指标体系,建立各项目组织结构和理想组织结构的Vague集,计算各项目组织结构和理想组织结构的相似度量,完成对装备采购项目组织结构的评价,为装备采购项目组织设计奠定基础。 相似文献
6.
影响因素难以量化是再制造发动机抽样方案选择过程中的难点,不可避免地给检验人员带来了主观性和片面性的问题。提出了应用模糊综合评价方法的解决方案,建立了再制造发动机抽样方案综合评价指标体系,详细阐述了综合评价方法的算法步骤,最后以某再制造发动机抽样方案的决策为例进行了实例应用。模糊综合评价方法解决了再制造发动机抽样方案选择中所遇到的问题,可为检验人员选择合理的抽样方案提供决策支持。 相似文献
7.
8.
Consider a project during the life cycle of which there are cash payouts and in‐flows. To better meet his financial commitments, the project owner would like to meet all deadlines without running out of cash. We show that the cash availability objective is similar to the total weighted flowtime used to measure work‐in‐progress performance in the scheduling and inventory control literatures. In this article we provide several specialized solution methods for the problem of minimizing total weighted flowtime in an arbitrary acyclic project network, subject to activity release times and due dates, where the activity weights may be positive or negative and represent cash in‐ and out‐flows. We describe the structure of an optimal solution and provide several efficient algorithms and their complexity based on mincost and maxflow formulations. © 2006 Wiley Periodicals, Inc. Naval Research Logistics, 2006 相似文献
9.
《Arms and Armour》2013,10(1):40-52
AbstractScientifically analysing important artefacts from the site of historic battles is vital if the best information is to be retrieved from the field. A detailed knowledge of the specific equipment that was available to the combatants from a known battle is also required at a high level so that artefacts and fragments resulting from an historic battlefield archaeological survey can be recognised when found. Access to specialists from all walks of life is required throughout each battlefield-related project, from the fieldwork stages to the dissemination of information. The following paper discusses the importance of working alongside museums and specialists and gives examples of how the Towton Battlefield Archaeology Project has successfully worked with the staff at the Royal Armouries Leeds. 相似文献
10.
周忠阳 《兵团教育学院学报》2013,(6):78-80
学校工作是由一个个细节组成的,切实做好每一个细节,是提高办学质量的关键。多年来,小白杨中学在“精”字上做文章,在“细”字上下功夫,优化过程,彰显内涵。“精品工程”的建设,有力的促进了学校各项工作的蓬勃发展。短短几年间,学校迅速从上百所学校中脱颖而出,独树一帜。 相似文献