首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 359 毫秒
1.
We use the matrix‐geometric method to study the MAP/PH/1 general preemptive priority queue with a multiple class of jobs. A procedure for obtaining the block matrices representing the transition matrix P is presented. We show that the special upper triangular structure of the matrix R obtained by Miller [Computation of steady‐state probabilities for M/M/1 priority queues, Oper Res 29(5) (1981), 945–958] can be extended to an upper triangular block structure. Moreover, the subblock matrices of matrix R also have such a structure. With this special structure, we develop a procedure to compute the matrix R. After obtaining the stationary distribution of the system, we study two primary performance indices, namely, the distributions of the number of jobs of each type in the system and their waiting times. Although most of our analysis is carried out for the case of K = 3, the developed approach is general enough to study the other cases (K ≥ 4). © 2003 Wiley Periodicals, Inc. Naval Research Logistics 50: 662–682, 2003.  相似文献   

2.
We consider a reader—writer system consisting of a single server and a fixed number of jobs (or customers) belonging to two classes. Class one jobs are called readers and any number of them can be processed simultaneously. Class two jobs are called writers and they have to be processed one at a time. When a writer is being processed no other writer or readers can be processed. A fixed number of readers and writers are ready for processing at time 0. Their processing times are independent random variables. Each reader and writer has a fixed waiting cost rate. We find optimal scheduling rules that minimize the expected total waiting cost (expected total weighted flowtime). We consider both nonpreemptive and preemptive scheduling. The optimal nonpreemptive schedule is derived by a variation of the usual interchange argument, while the optimal schedule in the preemptive case is given by a Gittins index policy. These index policies continue to be optimal for systems in which new writers enter the system in a Poisson fashion. © 1998 John Wiley & Sons, Inc. Naval Research Logistics 45: 483–495, 1998  相似文献   

3.
In this paper we study the scheduling problem that considers both production and job delivery at the same time with machine availability considerations. Only one vehicle is available to deliver jobs in a fixed transportation time to a distribution center. The vehicle can load at most K jobs as a delivery batch in one shipment due to the vehicle capacity constraint. The objective is to minimize the arrival time of the last delivery batch to the distribution center. Since machines may not always be available over the production period in real life due to preventive maintenance, we incorporate machine availability into the models. Three scenarios of the problem are studied. For the problem in which the jobs are processed on a single machine and the jobs interrupted by the unavailable machine interval are resumable, we provide a polynomial algorithm to solve the problem optimally. For the problem in which the jobs are processed on a single machine and the interrupted jobs are nonresumable, we first show that the problem is NP‐hard. We then propose a heuristic with a worst‐case error bound of 1/2 and show that the bound is tight. For the problem in which the jobs are processed on either one of two parallel machines, where only one machine has an unavailable interval and the interrupted jobs are resumable, we propose a heuristic with a worst‐case error bound of 2/3. © 2006 Wiley Periodicals, Inc. Naval Research Logistics, 2007  相似文献   

4.
We deal with the problem of minimizing makespan on a single batch processing machine. In this problem, each job has both processing time and size (capacity requirement). The batch processing machine can process a number of jobs simultaneously as long as the total size of these jobs being processed does not exceed the machine capacity. The processing time of a batch is just the processing time of the longest job in the batch. An approximation algorithm with worst‐case ratio 3/2 is given for the version where the processing times of large jobs (with sizes greater than 1/2) are not less than those of small jobs (with sizes not greater than 1/2). This result is the best possible unless P = NP. For the general case, we propose an approximation algorithm with worst‐case ratio 7/4. A number of heuristics by Uzosy are also analyzed and compared. © 2001 John Wiley & Sons, Inc. Naval Research Logistics 48: 226–240, 2001  相似文献   

5.
We consider the problem of scheduling a set of jobs on a single machine subject to random breakdowns. We focus on the preemptive‐repeat model, which addresses the situation where, if a machine breaks down during the processing of a job, the work done on the job prior to the breakdown is lost and the job will have to be started from the beginning again when the machine resumes its work. We allow that (i) the uptimes and downtimes of the machine follow general probability distributions, (ii) the breakdown process of the machine depends upon the job being processed, (iii) the processing times of the jobs are random variables following arbitrary distributions, and (iv) after a breakdown, the processing time of a job may either remain a same but unknown amount, or be resampled according to its probability distribution. We first derive the optimal policy for a class of problems under the criterion to maximize the expected discounted reward earned from completing all jobs. The result is then applied to further obtain the optimal policies for other due date‐related criteria. We also discuss a method to compute the moments and probability distributions of job completion times by using their Laplace transforms, which can convert a general stochastic scheduling problem to its deterministic equivalent. The weighted squared flowtime problem and the maintenance checkup and repair problem are analyzed as applications. © 2004 Wiley Periodicals, Inc. Naval Research Logistics, 2004  相似文献   

6.
We consider sequencing of n jobs which will arrive intermittently and are to be processed on a single machine; the arrival and the processing times of each jobs are assumed known. A schedule is to be developed that minimizes the mean flow time. Two models are considered: (i) when no pre-emption or inserted idle time is allowed in the schedule, and (ii) when pre-emption is allowed but the jobs follow a pre-empt-repeat discipline We illustrate that Cobham's and Phipp's SPT dispatching rule does not guarantee the optimum F? even for the non-preemptive model We propose a branch and bound algorithm for both models and discuss our computational experience We also examine the relative performances of the optimum nonpre-emptive sequence, and the optimum pre-empt-repeat sequence over that resulting from SPT dispatching rule on a large number of sets of jobs of varying sizes and tightness.  相似文献   

7.
We consider the problem of scheduling multiprocessor tasks with prespecified processor allocations to minimize the total completion time. The complexity of both preemptive and nonpreemptive cases of the two-processor problem are studied. We show that the preemptive case is solvable in O(n log n) time. In the nonpreemptive case, we prove that the problem is NP-hard in the strong sense, which answers an open question mentioned in Hoogeveen, van de Velde, and Veltman (1994). An efficient heuristic is also developed for this case. The relative error of this heuristic is at most 100%. © 1998 John Wiley & Sons, Inc. Naval Research Logistics 45: 231–242, 1998  相似文献   

8.
We consider a processing network in which jobs arrive at a fork‐node according to a renewal process. Each job requires the completion of m tasks, which are instantaneously assigned by the fork‐node to m task‐processing nodes that operate like G/M/1 queueing stations. The job is completed when all of its m tasks are finished. The sojourn time (or response time) of a job in this G/M/1 fork‐join network is the total time it takes to complete the m tasks. Our main result is a closed‐form approximation of the sojourn‐time distribution of a job that arrives in equilibrium. This is obtained by the use of bounds, properties of D/M/1 and M/M/1 fork‐join networks, and exploratory simulations. Statistical tests show that our approximation distributions are good fits for the sojourn‐time distributions obtained from simulations. © 2008 Wiley Periodicals, Inc. Naval Research Logistics, 2008  相似文献   

9.
We consider problem of scheduling jobs on‐line on batch processing machines with dynamic job arrivals to minimize makespan. A batch machine can handle up to B jobs simultaneously. The jobs that are processed together from a batch, and all jobs in a batch start and complete at the same time. The processing time of a batch is given by the longest processing time of any job in the batch. Each job becomes available at its arrival time, which is unknown in advance, and its processing time becomes known upon its arrival. In the first part of this paper, we address the single batch processing machine scheduling problem. First we deal with two variants: the unbounded model where B is sufficiently large and the bounded model where jobs have two distinct arrival times. For both variants, we provide on‐line algorithms with worst‐case ratio (the inverse of the Golden ratio) and prove that these results are the best possible. Furthermore, we generalize our algorithms to the general case and show a worst‐case ratio of 2. We then consider the unbounded case for parallel batch processing machine scheduling. Lower bound are given, and two on‐line algorithms are presented. © 2001 John Wiley & Sons, Inc. Naval Research Logistics 48: 241–258, 2001  相似文献   

10.
The paper considers the open shop scheduling problem to minimize the make-span, provided that one of the machines has to process the jobs according to a given sequence. We show that in the preemptive case the problem is polynomially solvable for an arbitrary number of machines. If preemption is not allowed, the problem is NP-hard in the strong sense if the number of machines is variable, and is NP-hard in the ordinary sense in the case of two machines. For the latter case we give a heuristic algorithm that runs in linear time and produces a schedule with the makespan that is at most 5/4 times the optimal value. We also show that the two-machine problem in the nonpreemptive case is solvable in pseudopolynomial time by a dynamic programming algorithm, and that the algorithm can be converted into a fully polynomial approximation scheme. © 1998 John Wiley & Sons, Inc. Naval Research Logistics 45: 705–731, 1998  相似文献   

11.
随机弱实时系统作业调度概率保证分析   总被引:1,自引:0,他引:1       下载免费PDF全文
随机弱实时系统与强实时系统的显著区别是 ,它不要求实时任务的每一项作业都满足时限要求 ,只要保证作业的时限延误率低于某一阈值 ,其总体执行性能就是可以接受的。提出了概率时间需求分析法 (PTDA) ,用于估计可剥夺静态优先级调度策略下周期性任务的作业满足时限约束的概率的下界 ,并通过一个具体的实例考察了下界的紧性。对实例系统的仿真结果表明 ,PTDA分析的误差小于 1 0 % ,计算速度快 ,可以为弱实时应用的设计提供重要的参考依据  相似文献   

12.
The busy period, busy cycle, and the numbers of customers served and lost therein, of the G/M/m queue with balking is studied via the embedded Markov chain approach. It is shown that the expectations of the two discrete variables give the loss probability. For the special case G/M/1/N a closed expression in terms of contour integrals is obtained for the Laplace transform of these four variables. This yields as a byproduct the LIFO waiting time distribution for the G/M/m/N queue. The waiting time under random order service for this queue is also studied.  相似文献   

13.
We consider a single‐queue with exhaustive or gated time‐limited services and server vacations, in which the length of each service period at the queue is controlled by a timer, i.e., the server serves customers until the timer expires or the queue becomes empty, whichever occurs first, and then takes vacations. The customer whose service is interrupted due to the timer expiration may be attended according to nonpreemptive or preemptive service disciplines. For the M/G/1 exhaustive/gated time‐limited service queueing system with an exponential timer and four typical preemptive/nonpreemptive service disciplines, we derive the Laplace—Stieltjes transforms and the moment formulas for waiting times and sojourn times through a unified approach, and provide some new results for these time‐limited service disciplines. © John Wiley & Sons, Inc. Naval Research Logistics 48: 638–651, 2001.  相似文献   

14.
We consider a problem of scheduling jobs on m parallel machines. The machines are dedicated, i.e., for each job the processing machine is known in advance. We mainly concentrate on the model in which at any time there is one unit of an additional resource. Any job may be assigned the resource and this reduces its processing time. A job that is given the resource uses it at each time of its processing. No two jobs are allowed to use the resource simultaneously. The objective is to minimize the makespan. We prove that the two‐machine problem is NP‐hard in the ordinary sense, describe a pseudopolynomial dynamic programming algorithm and convert it into an FPTAS. For the problem with an arbitrary number of machines we present an algorithm with a worst‐case ratio close to 3/2, and close to 3, if a job can be given several units of the resource. For the problem with a fixed number of machines we give a PTAS. Virtually all algorithms rely on a certain variant of the linear knapsack problem (maximization, minimization, multiple‐choice, bicriteria). © 2008 Wiley Periodicals, Inc. Naval Research Logistics, 2008  相似文献   

15.
In this article, we study a queueing system serving multiple classes of customers. Each class has a finite‐calling population. The customers are served according to the preemptive‐resume priority policy. We assume general distributions for the service times. For each priority class, we derive the steady‐state system size distributions at departure/arrival and arbitrary time epochs. We introduce the residual augmented process completion times conditioned on the number of customers in the system to obtain the system time distribution. We then extend the model by assuming that the server is subject to operation‐independent failures upon which a repair process with random duration starts immediately. We also demonstrate how setup times, which may be required before resuming interrupted service or picking up a new customer, can be incorporated in the model. © 2013 Wiley Periodicals, Inc. Naval Research Logistics, 2013  相似文献   

16.
This paper presents a branch‐and‐price algorithm for scheduling n jobs on m nonhomogeneous parallel machines with multiple time windows. An additional feature of the problem is that each job falls into one of ρ priority classes and may require two operations. The objective is to maximize the weighted number of jobs scheduled, where a job in a higher priority class has “infinitely” more weight or value than a job in a lower priority class. The methodology makes use of a greedy randomized adaptive search procedure (GRASP) to find feasible solutions during implicit enumeration and a two‐cycle elimination heuristic when solving the pricing subproblems. Extensive computational results are presented based on data from an application involving the use of communications relay satellites. Many 100‐job instances that were believed to be beyond the capability of exact methods, were solved within minutes. © 2005 Wiley Periodicals, Inc. Naval Research Logistics, 2006  相似文献   

17.
We consider a single-machine problem of scheduling n independent jobs to minimize makespan, in which the processing time of job Jj grows by wj with each time unit its start is delayed beyond a given common critical date d. This processing time is pj if Jj starts by d. We show that this problem is NP-hard, give a pseudopolynomial algorithm that runs in time and O(nd) space, and develop a branch-and-bound algorithm that solves instances with up to 100 jobs in a reasonable amount of time. We also introduce the case of bounded deterioration, where the processing time of a job grows no further if the job starts after a common maximum deterioration date D > d. For this case, we give two pseudopolynomial time algorithms: one runs in O(n2d(D − d) time and O(nd(D − d)) space, the other runs in pj)2) time and pj) space. © 1998 John Wiley & Sons, Inc. Naval Research Logistics 45: 511–523, 1998  相似文献   

18.
Non‐preemptive scheduling of n independent jobs on m unrelated machines so as to minimize the maximal job completion time is considered. A polynomial algorithm with the worst‐case absolute error of min{(1 ? 1/m)pmax, p} is presented, where pmax is the largest job processing time and p is the mth element from the non‐increasing list of job processing times. This is better than the earlier known best absolute error of pmax. The algorithm is based on the rounding of acyclic multiprocessor distributions. An O(nm2) algorithm for the construction of an acyclic multiprocessor distribution is also presented. © 2006 Wiley Periodicals, Inc. Naval Research Logistics, 2006  相似文献   

19.
We develop polynomial algorithms for several cases of the NP-hard open shop scheduling problem of minimizing the number of late jobs by utilizing some recent results for the open shop makespan problem. For the two machine common due date problem, we assume that either the machines or the jobs are ordered. For the m machine common due date problem, we assume that one machine is maximal and impose a restriction on its load. © 1998 John Wiley & Sons, Inc. Naval Research Logistics 45: 525–532, 1998  相似文献   

20.
We consider parallel‐machine scheduling with a common server and job preemption to minimize the makespan. While the non‐preemptive version of the problem is strongly NP‐hard, the complexity status of the preemptive version has remained open. We show that the preemptive version is NP‐hard even if there is a fixed number of machines. We give a pseudo‐polynomial time algorithm to solve the case with two machines. We show that the case with an arbitrary number of machines is unary NP‐hard, analyze the performance ratios of some natural heuristic algorithms, and present several solvable special cases. © 2017 Wiley Periodicals, Inc. Naval Research Logistics 64: 388–398, 2017  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号