首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 93 毫秒
1.
Consider a system consisting of n separately maintained independent components where the components alternate between intervals in which they are “up” and in which they are “down”. When the ith component goes up [down] then, independent of the past, it remains up [down] for a random length of time, having distribution Fi[Gi], and then goes down [up]. We say that component i is failed at time t if it has been “down” at all time points s ?[t-A.t]: otherwise it is said to be working. Thus, a component is failed if it is down and has been down for the previous A time units. Assuming that all components initially start “up,” let T denote the first time they are all failed, at which point we say the system is failed. We obtain the moment-generating function of T when n = l, for general F and G, thus generalizing previous results which assumed that at least one of these distributions be exponential. In addition, we present a condition under which T is an NBU (new better than used) random variable. Finally we assume that all the up and down distributions Fi and Gi i = l,….n, are exponential, and we obtain an exact expression for E(T) for general n; in addition we obtain bounds for all higher moments of T by showing that T is NBU.  相似文献   

2.
Let (Y, Xl,…, XK) be a random vector distributed according to a multivariate normal distribution where Xl,…, XK are considered as predictor variables and y is the predictand. Let ri, and Ri denote the population and sample correlation coefficients, respectively, between Y and Xi. The population correlation coefficient ri is a measure of the predictive power of Xi. The author has derived the joint distribution of Rl,…, RK and its asymptotic property. The given result is useful in the problem of selecting the most important predictor variable corresponding to the largest absolute value of ri.  相似文献   

3.
Suppose that the state of a queueing system is described by a Markov process { Yt, t ≥ 0}, and the profit from operating it up to a time t is given by the function f(Yt). We operate the system up to a time T, where the random variable T is a stopping time for the process Yt. Optimal stochastic control is achieved by choosing the stopping time T that maximizes Ef(YT) over a given class of stopping times. In this paper a theory of stochastic control is developed for a single server queue with Poisson arrivals and general service times.  相似文献   

4.
Suppose that observations from populations π1, …, πk (k ≥ 1) are normally distributed with unknown means μ1., μk, respectively, and a common known variance σ2. Let μ[1] μ … ≤ μ[k] denote the ranked means. We take n independent observations from each population, denote the sample mean of the n observation from π1 by X i (i = 1, …, k), and define the ranked sample means X [1] ≤ … ≤ X [k]. The problem of confidence interval estimation of μ(1), …,μ[k] is stated and related to previous work (Section 1). The following results are obtained (Section 2). For i = 1, …, k and any γ(0 < γ < 1) an upper confidence interval for μ[i] with minimal probability of coverage γ is (? ∞, X [i]+ h) with h = (σ/n1/2) Φ?11/k-i+1), where Φ(·) is the standard normal cdf. A lower confidence interval for μ[i] with minimal probability of coverage γ is (X i[i]g, + ∞) with g = (σ/n1/2) Φ?11/i). For the upper confidence interval on μ[i] the maximal probability of coverage is 1– [1 – γ1/k-i+1]i, while for the lower confidence interval on μ[i] the maximal probability of coverage is 1–[1– γ1/i] k-i+1. Thus the maximal overprotection can always be calculated. The overprotection is tabled for k = 2, 3. These results extend to certain translation parameter families. It is proven that, under a bounded completeness condition, a monotone upper confidence interval h(X 1, …, X k) for μ[i] with probability of coverage γ(0 < γ < 1) for all μ = (μ[1], …,μ[k]), does not exist.  相似文献   

5.
For each n, X1(n),…Xn(n) are independent and identically distributed random variables, with common probability density function Where c, θ, α, and r(y) are all unknown. It is shown that we can make asymptotic inferences about c, θ, and α, when r(y) satisfies mild conditions.  相似文献   

6.
We study a class of new scheduling problems which involve types of teamwork tasks. Each teamwork task consists of several components, and requires a team of processors to complete, with each team member to process a particular component of the task. Once the processor completes its work on the task, it will be available immediately to work on the next task regardless of whether the other components of the last task have been completed or not. Thus, the processors in a team neither have to start, nor have to finish, at the same time as they process a task. A task is completed only when all of its components have been processed. The problem is to find an optimal schedule to process all tasks, under a given objective measure. We consider both deterministic and stochastic models. For the deterministic model, we find that the optimal schedule exhibits the pattern that all processors must adopt the same sequence to process the tasks, even under a general objective function GC = F(f1(C1), f2(C2), … , fn(Cn)), where fi(Ci) is a general, nondecreasing function of the completion time Ci of task i. We show that the optimal sequence to minimize the maximum cost MC = max fi(Ci) can be derived by a simple rule if there exists an order f1(t) ≤ … ≤ fn(t) for all t between the functions {fi(t)}. We further show that the optimal sequence to minimize the total cost TC = ∑ fi(Ci) can be constructed by a dynamic programming algorithm. For the stochastic model, we study three optimization criteria: (A) almost sure minimization; (B) stochastic ordering; and (C) expected cost minimization. For criterion (A), we show that the results for the corresponding deterministic model can be easily generalized. However, stochastic problems with criteria (B) and (C) become quite difficult. Conditions under which the optimal solutions can be found for these two criteria are derived. © 2004 Wiley Periodicals, Inc. Naval Research Logistics, 2004  相似文献   

7.
We present a branch and bound algorithm to solve mathematical programming problems of the form: Find x =|(x1,…xn) to minimize Σ?i0(x1) subject to x?G, l≦x≦L and Σ?i0(x1)≦0, j=1,…,m. With l=(l1,…,ln) and L=(L1,…,Ln), each ?ij is assumed to be lower aemicontinuous and piecewise convex on the finite interval [li.Li]. G is assumed to be a closed convex set. The algorithm solves a finite sequence of convex programming problems; these correspond to successive partitions of the set C={x|l ≦ x ≦L} on the bahis of the piecewise convexity of the problem functions ?ij. Computational considerations are discussed, and an illustrative example is presented.  相似文献   

8.
For each n, X1(n),…, Xn(n) are independent and identically distributed random variables, each with cumulative distribution function F(x) which is known to be absolutely continuous but is otherwise unknown. The problem is to test the hypothesis that \documentclass{article}\pagestyle{empty}\begin{document}$ F(x) = G\left( {{\textstyle{{x - \theta _1 } \over {\theta _2 }}}} \right) $\end{document}, where the cumulative distribution function Gx is completely specified and satisfies certain regularity conditions, and the parameters θ1, θ2 are unknown and unspecified, except that the scale parameter θ2, is positive. Y1 (n) ≦ Y2 (n) ≦ … ≦ Yn (n)are the ordered values of X1(n),…, Xn(n). A test based on a certain subset of {Yi(n)} is proposed, is shown to have asymptotically a normal distribution when the hypothesis is true, and is shown to be consistent against all alternatives satisfying a mild regularity condition.  相似文献   

9.
For nonnegative integers d1, d2, and L(d1, d2)‐labeling of a graph G, is a function f : V(G) → {0, 1, 2, …} such that |f(u) − f(v)| ≥ di whenever the distance between u and v is i in G, for i = 1, 2. The L(d1, d2)‐number of G, λ(G) is the smallest k such that there exists an L(d1, d2)‐labeling with the largest label k. These labelings have an application to a computer code assignment problem. The task is to assign integer “control codes” to a network of computer stations with distance restrictions, which allow d1d2. In this article, we will study the labelings with (d1, d2) ∈ {(0, 1), (1, 1), (1, 2)}. © 2004 Wiley Periodicals, Inc. Naval Research Logistics, 2005  相似文献   

10.
Consider an N‐item, periodic review, infinite‐horizon, undiscounted, inventory model with stochastic demands, proportional holding and shortage costs, and full backlogging. For 1 ≤ jN, orders for item j can arrive in every period, and the cost of receiving them is negligible (as in a JIT setting). Every Tj periods, one reviews the current stock level of item j and decides on deliveries for each of the next Tj periods, thus incurring an item‐by‐item fixed cost kj. There is also a joint fixed cost whenever any item is reviewed. The problem is to find review periods T1, T2, …, TN and an ordering policy satisfying the average cost criterion. The current article builds on earlier results for the single‐item case. We prove an optimal policy exists, give conditions where it has a simple form, and develop a branch and bound algorithm for its computation. We also provide two heuristic policies with O(N) computational requirements. Computational experiments indicate that the branch and bound algorithm can handle normal demand problems with N ≤ 10 and that both heuristics do well for a wide variety of problems with N ranging from 2 to 200; moreover, the performance of our heuristics seems insensitive to N. © 2001 John Wiley & Sons, Inc. Naval Research Logistics 48:430–449, 2001  相似文献   

11.
Consider n jobs (J1, …, Jn), m working stations (M1, …, Mm) and λ linear resources (R1, …, Rλ). Job Ji consists of m operations (Oi1, …, Oim). Operation Oij requires Pk(i, j) units of resource Rk to be realized in an Mj. The availability of resource Rk and the ability of the working station Mh to consume resource Rk, vary over time. An operation involving more than one resource consumes them in constant proportions equal to those in which they are required. The order in which operations are realized is immaterial. We seek an allocation of the resources such that the schedule length is minimized. In this paper, polynomial algorithms are developed for several problems, while NP-hardness is demonstrated for several others. © 1998 John Wiley & Sons, Inc. Naval Research Logistics 45: 51–66, 1998  相似文献   

12.
Let X1 < X2 <… < Xn denote an ordered sample of size n from a Weibull population with cdf F(x) = 1 - exp (?xp), x > 0. Formulae for computing Cov (Xi, Xj) are well known, but they are difficult to use in practice. A simple approximation to Cov(Xi, Xj) is presented here, and its accuracy is discussed.  相似文献   

13.
The article considers a two-person zero-sum game in which the movement of the players is constrained to integer points …, −1, 0, 1, … of a line L. Initially the searcher (hider) is at point x = 0 (x = d, d > 0). The searcher and the hider perform simple motion on L with maximum speeds w and u, respectively, where w > u > 0. Each of the players knows the other's initial position but not the other's subsequent positions. The searcher has a bomb which he can drop at any time during his search. Between the dropping of the bomb and the bomb exploding there is a T time lag. If the bomb explodes at point i and the hider is at point i − 1, or i, or i + 1, then the destruction probability is equal to P, or 1, or P, respectively, where 0 < P < 1. d, w, u, and T are integer constants. The searcher can drop the bomb at integer moments of time t = 0, 1, … . The aim of the searcher is to maximize the probability of the destruction of the hider. © 1993 John Wiley & Sons, Inc.  相似文献   

14.
An attacker, being one of two types, initiates an attack at some time in the interval [-T, 0]. The a priori probabilities of each type are known. As time elapses the defender encounters false targets which occur according to a known Poisson process and which can be properly classified with known probability. The detection and classification probabilities for each type attacker are given. If the defender responds with a weapon at the time of attack, he survives with a probability which depends on the number of weapons in his possession and on attacker type. If he does not respond, his survival probability is smaller. These probabilities are known, as well as the current number of weapons in the defender's possession. They decrease as the number of weapons decreases. The payoff is the defender's survival probability. An iterative system of first-order differential equations is derived whose unique solution V1(t),V2(t),…,Vk(t) is shown to be the value of the game at time t, when the defender has 1, 2,…, k,… weapons, respectively. The optimal strategies are determined. Limiting results are obtained as t→-∞, while the ratio of the number of weapons to the expected number of false targets remaining is held constant.  相似文献   

15.
The Markov analysis of reliability models frequently involves a partitioning of the state space into two or more subsets, each corresponding to a given degree of functionality of the system. A common partitioning is GB ∪ {o}, where G (good) and B (bad) stand, respectively, for fully and partially functional sets of system states; o denotes system failure. Visits to B may correspond to, for instance, reparable system downtimes, whereas o will stand for irrecoverable system failure. Let TG and NB stand, respectively, for the total time spent in G, and the number of visits to B, until system failure. Both TG and NB are familiar system performance measures with well-known cumulative distribution functions. In this article a closed-form expression is established for the probability Pr[TG <> t, NBn], a dependability measure with much intuitive appeal but which hitherto seems not to have been considered in the literature. It is based on a recent result on the joint distribution of sojourn times in subsets of the state space by a Markov process. The formula is explored numerically by the example of a power transmission reliability model. © 1996 John Wiley & Sons, Inc.  相似文献   

16.
T identical exponential lifetime components out of which G are initially functioning (and B are not) are to be allocated to N subsystems, which are connected either in parallel or in series. Subsystem i, i = 1,…, N, functions when at least Ki of its components function and the whole system is maintained by a single repairman. Component repair times are identical independent exponentials and repaired components are as good as new. The problem of the determination of the assembly plan that will maximize the system reliability at any (arbitrary) time instant t is solved when the component failure rate is sufficiently small. For the parallel configuration, the optimal assembly plan allocates as many components as possible to the subsystem with the smallest Ki and allocates functioning components to subsystems in increasing order of the Ki's. For the series configuration, the optimal assembly plan allocates both the surplus and the functioning components equally to all subsystems whenever possible, and when not possible it favors subsystems in decreasing order of the Ki's. The solution is interpreted in the context of the optimal allocation of processors and an initial number of jobs in a problem of routing time consuming jobs to parallel multiprocessor queues. © John Wiley & Sons, Inc. Naval Research Logistics 48: 732–746, 2001  相似文献   

17.
The discounted return associated with a finite state Markov chain X1, X2… is given by g(X1)+ αg(X2) + α2g(X3) + …, where g(x) represents the immediate return from state x. Knowing the transition matrix of the chain, it is desired to compute the expected discounted return (present worth) given the initial state. This type of problem arises in inventory theory, dynamic programming, and elsewhere. Usually the solution is approximated by solving the system of linear equations characterizing the expected return. These equations can be solved by a variety of well-known methods. This paper describes yet another method, which is a slight modification of the classical iterative scheme. The method gives sequences of upper and lower bounds which converge mono-tonely to the solution. Hence, the method is relatively free of error control problems. Computational experiments were conducted which suggest that for problems with a large number of states, the method is quite efficient. The amount of computation required to obtain the solution increases much slower with an increase in the number of states, N, than with the conventional methods. In fact, computational time is more nearly proportional to N2, than to N3.  相似文献   

18.
We consider the scheduling of n jobs on m identical machines when the jobs become available for processing at ready times ai, ai, ? 0, require di time units for processing and must be completed by times bi for i = 1, 2, … n. The objective chosen is that of minimizing the total elapsed time to complete all jobs subject to the ready time and due date constraints, preemption is not allowed. We present a multi-stage solution algorithm for this problem that is based on an implicit enumeration procedure and also uses the labelling type algorithm which solves the problem when preemption is allowed.  相似文献   

19.
To location Li we are to allocate a “generator” and ni “machines” for i = 1, …,k, where n1n1 ≧ … ≧ nk. Although the generators and machines function independently of one another, a machine is operable only if it and the generator at its location are functioning. The problem we consider is that of finding the arrangement or allocation optimizing the number of operable machines. We show that if the objective is to maximize the expected number of operable machines at some future time, then it is best to allocate the best generator and the n1 best machines to location L1, the second-best generator and the n2-next-best machines to location L2, etc. However, this arrangement is not always stochastically optimal. For the case of two generators we give a necessary and sufficient condition that this arrangement is stochastically best, and illustrate the result with several examples.  相似文献   

20.
We consider three classes of lower bounds to P(c) = P (X1c1,…, Xnc); Bonferroni-type bounds, product-type bounds and setwise bounds. Setwise probability inequalities are shown to be a compromise between product-type and Bonferroni-type probability inequalities. Bonferroni-type inequalities always hold. Product-type inequalities require positive dependence conditions, but are superior to the Bonferroni-type and setwise bounds when these conditions are satisfied. Setwise inequalities require less stringent positive dependence bound conditions than the product-type bounds. Neither setwise nor Bonferroni-type bounds dominate the other. Optimized setwise bounds are developed. Results pertaining to the nesting of setwise bounds are obtained. Combination setwise-Bonferroni-type bounds are developed in which high dimensional setwise bounds are applied and second and third order Bonferroni-type bounds are applied within each subvector of the setwise bounds. These new combination bounds, which are applicable for associated random variables, are shown to be superior to Bonferroni-type and setwise bounds for moving averages and runs probabilities. Recently proposed upper bounds to P(c) are reviewed. The lower and upper bounds are tabulated for various classes of multivariate normal distributions with banded covariance matrices. The bounds are shown to be surprisingly accurate and are much easier to compute than the inclusion-exclusion bounds. A strategy for employing the bounds is developed. © 1996 John Wiley & Sons, Inc.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号