首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 281 毫秒
1.
We consider two‐stage and three‐stage flexible flow shops with parallel machines in each stage and the minimum makespan objective. We develop linear time algorithms for these problems with absolute worst‐case bounds either sharper or no worse than the currently available ones and we accomplish this with lower complexity algorithms. We also demonstrate the asymptotic optimality of a class of algorithms for multistage flexible flow shop problems (which includes the proposed algorithms) under certain probabilistic assumptions on the job processing times. © 2000 John Wiley & Sons, Inc. Naval Research Logistics 47: 259–268, 2000  相似文献   

2.
In this article, a model for a repairable consecutive‐k‐out‐of‐n: F system with Markov dependence is studied. A binary vector is used to represent the system state. The failure rate of a component in the system depends on the state of the preceding component. The failure risk of a system state is then introduced. On the basis of the failure risk, a priority repair rule is adopted. Then the transition density matrix can be determined, and the analysis of the system reliability can be conducted accordingly. One example each of a linear and a circular system is then studied in detail to explain the model and methodology developed in this paper. © 2000 John Wiley & Sons, Inc. Naval Research Logistics 47: 18–39, 2000  相似文献   

3.
We study a multi‐item capacitated lot‐sizing problem with setup times and pricing (CLSTP) over a finite and discrete planning horizon. In this class of problems, the demand for each independent item in each time period is affected by pricing decisions. The corresponding demands are then satisfied through production in a single capacitated facility or from inventory, and the goal is to set prices and determine a production plan that maximizes total profit. In contrast with many traditional lot‐sizing problems with fixed demands, we cannot, without loss of generality, restrict ourselves to instances without initial inventories, which greatly complicates the analysis of the CLSTP. We develop two alternative Dantzig–Wolfe decomposition formulations of the problem, and propose to solve their relaxations using column generation and the overall problem using branch‐and‐price. The associated pricing problem is studied under both dynamic and static pricing strategies. Through a computational study, we analyze both the efficacy of our algorithms and the benefits of allowing item prices to vary over time. © 2009 Wiley Periodicals, Inc. Naval Research Logistics, 2010  相似文献   

4.
Clustering problems are often difficult to solve due to nonlinear cost functions and complicating constraints. Set partitioning formulations can help overcome these challenges, but at the cost of a very large number of variables. Therefore, techniques such as delayed column generation must be used to solve these large integer programs. The underlying pricing problem can suffer from the same challenges (non‐linear cost, complicating constraints) as the original problem, however, making a mathematical programming approach intractable. Motivated by a real‐world problem in printed circuit board (PCB) manufacturing, we develop a search‐based algorithm (Rank‐Cluster‐and‐Prune) as an alternative, present computational results for the PCB problem to demonstrate the tractability of our approach, and identify a broader class of clustering problems for which this approach can be used. © 2009 Wiley Periodicals, Inc. Naval Research Logistics 2009  相似文献   

5.
In this paper, we consider just‐in‐time job shop environments (job shop problems with an objective of minimizing the sum of tardiness and inventory costs), subject to uncertainty due to machine failures. We present techniques for proactive uncertainty management that exploit prior knowledge of uncertainty to build competitive release dates, whose execution improves performance. These techniques determine the release dates of different jobs based on measures of shop load, statistical data of machine failures, and repairs with a tradeoff between inventory and tardiness costs. Empirical results show that our methodology is very promising in comparison with simulated annealing and the best of 39 combinations of dispatch rules & release policies, under different frequencies of breakdowns. We observe that the performance of the proactive technique compared to the other two approaches improves in schedule quality (maximizing delivery performance while minimizing costs) with increase in frequency of breakdowns. The proactive technique presented here is also computationally less expensive than the other two approaches. © 2004 Wiley Periodicals, Inc. Naval Research Logistics, 2004  相似文献   

6.
This paper examines the discrete equal‐capacity p‐median problem that seeks to locate p new facilities (medians) on a network, each having a given uniform capacity, in order to minimize the sum of distribution costs while satisfying the demand on the network. Such problems arise, for example, in local access and transport area telecommunication network design problems where any number of a set of p facility units can be constructed at the specified candidate sites (hence, the net capacity is an integer multiple of a given unit capacity). We develop various valid inequalities, a separation routine for generating cutting planes that are specific members of such inequalities, as well as an enhanced reformulation that constructs a partial convex hull representation that subsumes an entire class of valid inequalities via its linear programming relaxation. We also propose suitable heuristic schemes for this problem, based on sequentially rounding the continuous relaxation solutions obtained for the various equivalent formulations of the problem. Extensive computational results are provided to demonstrate the effectiveness of the proposed valid inequalities, enhanced formulations, and heuristic schemes. The results indicate that the proposed schemes for tightening the underlying relaxations play a significant role in enhancing the performance of both exact and heuristic solution methods for this class of problems. © 2000 John & Sons, Inc. Naval Research Logistics 47: 166–183, 2000.  相似文献   

7.
Most scheduling problems are notoriously intractable, so the majority of algorithms for them are heuristic in nature. Priority rule‐based methods still constitute the most important class of these heuristics. Of these, in turn, parametrized biased random sampling methods have attracted particular interest, due to the fact that they outperform all other priority rule‐based methods known. Yet, even the “best” such algorithms are unable to relate to the full range of instances of a problem: Usually there will exist instances on which other algorithms do better. We maintain that asking for the one best algorithm for a problem may be asking too much. The recently proposed concept of control schemes, which refers to algorithmic schemes allowing to steer parametrized algorithms, opens up ways to refine existing algorithms in this regard and improve their effectiveness considerably. We extend this approach by integrating heuristics and case‐based reasoning (CBR), an approach that has been successfully used in artificial intelligence applications. Using the resource‐constrained project scheduling problem as a vehicle, we describe how to devise such a CBR system, systematically analyzing the effect of several criteria on algorithmic performance. Extensive computational results validate the efficacy of our approach and reveal a performance similar or close to state‐of‐the‐art heuristics. In addition, the analysis undertaken provides new insight into the behaviour of a wide class of scheduling heuristics. © 2000 John Wiley & Sons, Inc. Naval Research Logistics 47: 201–222, 2000  相似文献   

8.
We study a stochastic scenario‐based facility location problem arising in situations when facilities must first be located, then activated in a particular scenario before they can be used to satisfy scenario demands. Unlike typical facility location problems, fixed charges arise in the initial location of the facilities, and then in the activation of located facilities. The first‐stage variables in our problem are the traditional binary facility‐location variables, whereas the second‐stage variables involve a mix of binary facility‐activation variables and continuous flow variables. Benders decomposition is not applicable for these problems due to the presence of the second‐stage integer activation variables. Instead, we derive cutting planes tailored to the problem under investigation from recourse solution data. These cutting planes are derived by solving a series of specialized shortest path problems based on a modified residual graph from the recourse solution, and are tighter than the general cuts established by Laporte and Louveaux for two‐stage binary programming problems. We demonstrate the computational efficacy of our approach on a variety of randomly generated test problems. © 2010 Wiley Periodicals, Inc. Naval Research Logistics, 2010  相似文献   

9.
Characteristically, a small subset of operational problems admit risk neutrality when contingent claims methodology were used in their analysis. That is, for the majority of manufacturing and production problems, operating cash flows are not directly linked to prices of traded assets. However, to the extent that correlations can be estimated, the methodology's applicability to a broader set of operational problems is supported. Our article addresses this issue with the objective of extending the use of contingent claims techniques to a larger set of operational problems. In broad terms, this objective entails a partial equilibrium approach to the problem of valuing uncertain cash flows. To this end, we assume risk aversion and cast our approach within Merton's intertemporal capital asset pricing model. In this context, we formulate a “generic” production valuation model that is framed as an exercise in stochastic optimal control. The model is versatile in its characterization and can easily be adapted to accommodate a wide‐ranging set of risk‐based operational problems where the underlying sources of uncertainty are not traded. To obtain results, the model is recast as a stochastic dynamic program to be solved numerically. The article addresses a number of fundamental issues in the analysis risk based decision problems in operations. First, in the approach provided, decisions are analyzed under a properly defined risk structure. Second, the process of analysis leads to suitably adjusted probability distributions through which, appropriately discounted expectations are derived. Third, through consolidating existing concepts into a standard and adaptable framework, we extend the applicability of contingent claims methodology to a broader set of operational problems. The approach is advantageous as it obviates the need for exogenously specifying utility functions or discount rates.© 2011 Wiley Periodicals, Inc. Naval Research Logistics, 2011  相似文献   

10.
Design and management of complex systems with both integer and continuous decision variables can be guided using mixed‐integer optimization models and analysis. We propose a new mixed‐integer black‐box optimization (MIBO) method, subspace dynamic‐simplex linear interpolation search (SD‐SLIS), for decision making problems in which system performance can only be evaluated with a computer black‐box model. Through a sequence of gradient‐type local searches in subspaces of solution space, SD‐SLIS is particularly efficient for such MIBO problems with scaling issues. We discuss the convergence conditions and properties of SD‐SLIS algorithms for a class of MIBO problems. Under mild conditions, SD‐SLIS is proved to converge to a stationary solution asymptotically. We apply SD‐SLIS to six example problems including two MIBO problems associated with petroleum field development projects. The algorithm performance of SD‐SLIS is compared with that of a state‐of‐the‐art direct‐search method, NOMAD, and that of a full space simplex interpolation search, Full‐SLIS. The numerical results suggest that SD‐SLIS solves the example problems efficiently and outperforms the compared methods for most of the example cases. © 2017 Wiley Periodicals, Inc. Naval Research Logistics 64: 305–322, 2017  相似文献   

11.
In this short note we study a two‐machine flowshop scheduling problem with the additional no‐idle feasibility constraint and the total completion time criterion function. We show that one of the few papers which deal with this special problem contains incorrect claims and suggest a way how these claims can be rectified. © 2000 John Wiley & Sons, Inc. Naval Research Logistics 47:353–358, 2000  相似文献   

12.
This paper presents a branch‐and‐price algorithm for scheduling n jobs on m nonhomogeneous parallel machines with multiple time windows. An additional feature of the problem is that each job falls into one of ρ priority classes and may require two operations. The objective is to maximize the weighted number of jobs scheduled, where a job in a higher priority class has “infinitely” more weight or value than a job in a lower priority class. The methodology makes use of a greedy randomized adaptive search procedure (GRASP) to find feasible solutions during implicit enumeration and a two‐cycle elimination heuristic when solving the pricing subproblems. Extensive computational results are presented based on data from an application involving the use of communications relay satellites. Many 100‐job instances that were believed to be beyond the capability of exact methods, were solved within minutes. © 2005 Wiley Periodicals, Inc. Naval Research Logistics, 2006  相似文献   

13.
In this article, we propose a branch‐and‐price‐and‐cut (BPC) algorithm to exactly solve the manpower routing problem with synchronization constraints (MRPSC). Compared with the classical vehicle routing problems (VRPs), the defining characteristic of the MRPSC is that multiple workers are required to work together and start at the same time to carry out a job, that is, the routes of the scheduling subjects are dependent. The incorporation of the synchronization constraints increases the difficulty of the MRPSC significantly and makes the existing VRP exact algorithm inapplicable. Although there are many types of valid inequalities for the VRP or its variants, so far we can only adapt the infeasible path elimination inequality and the weak clique inequality to handle the synchronization constraints in our BPC algorithm. The experimental results at the root node of the branch‐and‐bound tree show that the employed inequalities can effectively improve the lower bound of the problem. Compared with ILOG CPLEX, our BPC algorithm managed to find optimal solutions for more test instances within 1 hour. © 2016 Wiley Periodicals, Inc. Naval Research Logistics 63: 138–171, 2016  相似文献   

14.
We consider a reliable network design problem under uncertain edge failures. Our goal is to select a minimum‐cost subset of edges in the network to connect multiple terminals together with high probability. This problem can be seen as a stochastic variant of the Steiner tree problem. We propose two scenario‐based Steiner cut formulations, study the strength of the proposed valid inequalities, and develop a branch‐and‐cut solution method. We also propose an LP‐based separation for the scenario‐based directed Steiner cut inequalities using Benders feasibility cuts, leveraging the success of the directed Steiner cuts for the deterministic Steiner tree problem. In our computational study, we test our branch‐and‐cut method on instances adapted from graphs in SteinLib Testdata Library with up to 100 nodes, 200 edges, and 17 terminals. The performance of our branch‐and‐cut method demonstrates the strength of the scenario‐based formulations and the benefit from adding the additional valid inequalities that we propose. © 2015 Wiley Periodicals, Inc. Naval Research Logistics 62: 321–334, 2015  相似文献   

15.
We study a component inventory planning problem in an assemble‐to‐order environment faced by many contract manufacturers in which both quick delivery and efficient management of component inventory are crucial for the manufacturers to achieve profitability in a highly competitive market. Extending a recent study in a similar problem setting by the same authors, we analyze an optimization model for determining the optimal component stocking decision for a contract manufacturer facing an uncertain future demand, where product price depends on the delivery times. In contrast to our earlier work, this paper considers the situation where the contract manufacturer needs to deliver the full order quantity in one single shipment. This delivery requirement is appropriate for many industries, such as the garment and toy industries, where the economies of scale in transportation is essential. We develop efficient solution procedures for solving this optimization problem. We use our model results to illustrate how the different model parameters affect the optimal solution. We also compare the results under this full‐shipment model with those from our earlier work that allows for multiple partial shipments. © 2007 Wiley Periodicals, Inc. Naval Research Logistics, 2007  相似文献   

16.
This paper presents a branch and bound algorithm for computing optimal replacement policies in a discrete‐time, infinite‐horizon, dynamic programming model of a binary coherent system with n statistically independent components, and then specializes the algorithm to consecutive k‐out‐of‐n systems. The objective is to minimize the long‐run expected average undiscounted cost per period. (Costs arise when the system fails and when failed components are replaced.) An earlier paper established the optimality of following a critical component policy (CCP), i.e., a policy specified by a critical component set and the rule: Replace a component if and only if it is failed and in the critical component set. Computing an optimal CCP is a optimization problem with n binary variables and a nonlinear objective function. Our branch and bound algorithm for solving this problem has memory storage requirement O(n) for consecutive k‐out‐of‐n systems. Extensive computational experiments on such systems involving over 350,000 test problems with n ranging from 10 to 150 find this algorithm to be effective when n ≤ 40 or k is near n. © 2002 Wiley Periodicals, Inc. Naval Research Logistics 49: 288–302, 2002; Published online in Wiley InterScience (www.interscience.wiley.com). DOI 10.1002/nav.10017  相似文献   

17.
Logistical planning problems are complicated in practice because planners have to deal with the challenges of demand planning and supply replenishment, while taking into account the issues of (i) inventory perishability and storage charges, (ii) management of backlog and/or lost sales, and (iii) cost saving opportunities due to economies of scale in order replenishment and transportation. It is therefore not surprising that many logistical planning problems are computationally difficult, and finding a good solution to these problems necessitates the development of many ad hoc algorithmic procedures to address various features of the planning problems. In this article, we identify simple conditions and structural properties associated with these logistical planning problems in which the warehouse is managed as a cross‐docking facility. Despite the nonlinear cost structures in the problems, we show that a solution that is within ε‐optimality can be obtained by solving a related piece‐wise linear concave cost multi‐commodity network flow problem. An immediate consequence of this result is that certain classes of logistical planning problems can be approximated by a factor of (1 + ε) in polynomial time. This significantly improves upon the results found in literature for these classes of problems. We also show that the piece‐wise linear concave cost network flow problem can be approximated to within a logarithmic factor via a large scale linear programming relaxation. We use polymatroidal constraints to capture the piece‐wise concavity feature of the cost functions. This gives rise to a unified and generic LP‐based approach for a large class of complicated logistical planning problems. © 2009 Wiley Periodicals, Inc. Naval Research Logistics, 2009  相似文献   

18.
We apply the techniques of response surface methodology (RSM) to approximate the objective function of a two‐stage stochastic linear program with recourse. In particular, the objective function is estimated, in the region of optimality, by a quadratic function of the first‐stage decision variables. The resulting response surface can provide valuable modeling insight, such as directions of minimum and maximum sensitivity to changes in the first‐stage variables. Latin hypercube (LH) sampling is applied to reduce the variance of the recourse function point estimates that are used to construct the response surface. Empirical results show the value of the LH method by comparing it with strategies based on independent random numbers, common random numbers, and the Schruben‐Margolin assignment rule. In addition, variance reduction with LH sampling can be guaranteed for an important class of two‐stage problems which includes the classical capacity expansion model. © 1999 John Wiley & Sons, Inc. Naval Research Logistics 46: 753–776, 1999  相似文献   

19.
This paper explores the role of franchising arrangements in the context of game theory. We assume a single franchisor and a single franchisee channel and address the impact of fixed lump‐sum fees, royalties, wholesale price, and retail price on the franchise contracts. We start with the chance cross‐constrained noncooperative situation where the franchisor, as the leader, first specifies his/her strategies. The franchisee, as the follower, then decides on his/her decision. We then relax the assumption of franchisee's inability to influence the franchisor's decisions and discuss cooperative situation between the franchisor and the franchisee. Nash's bargaining model is utilized to select the best Pareto‐efficient payment scheme for the franchisor and the franchisee to achieve their cooperation. © 2000 John Wiley & Sons, Inc. Naval Research Logistics 47: 669–685, 2000  相似文献   

20.
We consider in this paper the coordinated replenishment dynamic lot‐sizing problem when quantity discounts are offered. In addition to the coordination required due to the presence of major and minor setup costs, a separate element of coordination made possible by the offer of quantity discounts needs to be considered as well. The mathematical programming formulation for the incremental discount version of the extended problem and a tighter reformulation of the problem based on variable redefinition are provided. These then serve as the basis for the development of a primal‐dual based approach that yields a strong lower bound for our problem. This lower bound is then used in a branch and bound scheme to find an optimal solution to the problem. Computational results for this optimal solution procedure are reported in the paper. © 2000 John Wiley & Sons, Inc. Naval Research Logistics 47: 686–695, 2000  相似文献   