首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 15 毫秒
1.
We consider the scheduling of n tasks on a single resource. Each task becomes available for processing at time ai, must be completed by time bi, and requires di time units for processing. The aim is to find a schedule that minimizes the elapsed time to complete all jobs. We present solution algorithms for this problem when job splitting is permitted and when job splitting is not permitted. Then we consider several scheduling situations which arise in practice where these models may apply.  相似文献   

2.
We consider the scheduling of n jobs on m identical machines when the jobs become available for processing at ready times ai, ai, ? 0, require di time units for processing and must be completed by times bi for i = 1, 2, … n. The objective chosen is that of minimizing the total elapsed time to complete all jobs subject to the ready time and due date constraints, preemption is not allowed. We present a multi-stage solution algorithm for this problem that is based on an implicit enumeration procedure and also uses the labelling type algorithm which solves the problem when preemption is allowed.  相似文献   

3.
In this paper we deal with the d‐dimensional vector packing problem, which is a generalization of the classical bin packing problem in which each item has d distinct weights and each bin has d corresponding capacities. We address the case in which the vectors of weights associated with the items are totally ordered, i.e., given any two weight vectors ai, aj, either ai is componentwise not smaller than aj or aj is componentwise not smaller than ai. An asymptotic polynomial‐time approximation scheme is constructed for this case. As a corollary, we also obtain such a scheme for the bin packing problem with cardinality constraint, whose existence was an open question to the best of our knowledge. We also extend the result to instances with constant Dilworth number, i.e., instances where the set of items can be partitioned into a constant number of totally ordered subsets. We use ideas from classical and recent approximation schemes for related problems, as well as a nontrivial procedure to round an LP solution associated with the packing of the small items. © 2002 Wiley Periodicals, Inc. Naval Research Logistics, 2003  相似文献   

4.
A new approach is presented for analyzing multiple-attribute decision problems in which the set of actions is finite and the utility function is additive. The problem can be resolved if the decision makers (or group of decision makers) specifies a set of nonnegative weights for the various attributes or criteria, but we here assume that the decision maker(s) cannot provide a numerical value for each such weight. Ordinal information about these weights is therefore obtained from the decision maker(s), and this information is translated into a set of linear constraints which restrict the values of the weights. These constraints are then used to construct a polytope W of feasible weight vectors, and the subsets Hi (polytopes) of W over which each action ai has the greatest utility are determined. With the Comparative Hypervolume Criterion we calculate for each action the ratio of the hypervolume of Hi to the hypervolume of W and suggest the choice of an action with the largest such ratio. Justification of this choice criterion is given, and a computational method for accurately approximating the hypervolume ratios is described. A simple example is provided to evaluate the efficiency of a computer code developed to implement the method.  相似文献   

5.
《防务技术》2014,10(1):28-33
A differential/integral method to estimate the kinetic parameters (apparent activation energy Ea and pre-exponential factor A) for thermal decomposition reaction of energetic materials based on Kooij formula are applied to study the nonisothermal decomposition reaction kinetics of hexanitrohexaazaisowurtzitane (HNIW) by analyzing nonisothermal DSC curve data. The apparent activation energy (Ea) obtained by the integral isoconversional non-isothermal method based on Kooij formula is used to check the constancy and validity of apparent activation energy by the differential/integral method based on Kooij formula. The most probable mechanism function of thermal decomposition reaction of HNIW is determined by a logical choice method. The equations for calculating the critical temperatures of thermal explosion (Tb) and adiabatic time-to-explosion (tTIad) based on Kooij formula are used to calculate the values of Tb and tTIad to evaluate the thermal safety and heat-resistant ability of HNIW. All the original data needed for analyzing the kinetic parameters are from nonisothermal DSC curves. The results show that the kinetic model function in differential form and the values of Ea and A of decomposition reaction of HNIW are 3(1 − α)[−ln(1 − α)]2/3, 152.73 kJ mol−1 and 1011.97 s−1, respectively, and the values of self-accelerating decomposition temperature (TSADT), Tb and tTIad are 486.55 K, 493.11 K and 52.01 s, respectively.  相似文献   

6.
Let Xi be independent IFR random variables and let Yi be independent exponential random variables such that E[Xi]=E[Yi] for all i=1, 2, ? n. Then it is well known that E[min (Xi)] ≥E[min (Xi)]. Nevertheless, for 1≤i≤n exponentially distributed Xi's and for a decreasing convex function ?(.). it is shown that .  相似文献   

7.
The effectiveness of Johnson's Approximate Method (JAM) for the 3 × n job shop scheduling problems was examined on 1,500 test cases with n ranging from 6 to 50 and with the processing times Ai, Bi, Ci (for item i on machines A, B, C) being uniformly and normally distributed. JAM proved to be quite effective for the case Bi ? max (Ai, Ci) and optimal for Bi, ? min (Ai, Ci).  相似文献   

8.
n periodic tasks are to be processed by a single machine, where each task i has a maximum request rate or periodicity Fi, a processing time Ei, a deadline Di, relative to each request of task i, a task-request interrupt overhead Ii, and a task-independent scheduling overhead S. Two scheduling strategies are considered for sequencing the execution of an arbitrary arrangement of task requests in time: the preemptive and the nonpreemptive earliest-deadline algorithms. Necessary and sufficient conditions are derived for establishing whether a given set of tasks can be scheduled by each scheduling strategy. The conditions are given in the form of limited simulations of a small number of well-defined task-request arrangements. If all simulations succeed, the schedule is feasible for the given set of tasks. If any simulation fails, the schedule is infeasible. While interrupt handling and scheduling overheads can be handled by such simulations, context switching overhead resulting from preemption cannot. A counterexample illustrates how the simulations fail to uncover unschedulable task sets when context switching overhead is considered.  相似文献   

9.
The transportation model with supplies (Si) and demands (Di) treated as bounded variables developed by Charnes and Klingman is extended to the case where the Si and Di are independently and uniformly distributed random variables. Chance constraints which require that demand at the jth destination will be satisfied with probability at least βi and that stockout at the ith origin will occur with probability less than αi are imposed. Conversion of the chance constraints to their linear equivalents results in a transportation problem with one more row and column than the original with some of the new arcs capacitated. The chance-constrained formulation is extended to the transshipment problem.  相似文献   

10.
There are n customers that need to be served. Customer i will only wait in queue for an exponentially distributed time with rate λi before departing the system. The service time of customer i has distribution Fi, and on completion of service of customer i a positive reward ri is earned. There is a single server and the problem is to choose, after each service completion, which currently in queue customer to serve next so as to maximize the expected total return. © 2015 Wiley Periodicals, Inc. Naval Research Logistics 62: 659–663, 2015  相似文献   

11.
We consider a general repair process where the virtual age Vi after the ith repair is given by Vi = ϕ(Vi−1 + Xi), ϕ(·) is a specified repair functional, and Xi is the time between the (i − 1)th and ith repair. Some monotonicity and dominance properties are derived, and an equilibrium process is considered. A computational method for evaluating the expected number/density of repairs is described together with an approximation method for obtaining some parameters of the equilibrium process. © 1998 John Wiley & Sons, Inc. Naval Research Logistics 45: 391–405, 1998  相似文献   

12.
A classic problem in Search Theory is one in which a searcher allocates resources to the points of the integer interval [1, n] in an attempt to find an object which has been hidden in them using a known probability function. In this paper we consider a modification of this problem in which there is a protector who can also allocate resources to the points; allocating these resources makes it more difficult for the searcher to find an object. We model the situation as a two‐person non‐zero‐sum game so that we can take into account the fact that using resources can be costly. It is shown that this game has a unique Nash equilibrium when the searcher's probability of finding an object located at point i is of the form (1 − exp (−λixi)) exp (−μiyi) when the searcher and protector allocate resources xi and yi respectively to point i. An algorithm to find this Nash equilibrium is given. © 2000 John Wiley & Sons, Inc. Naval Research Logistics 47:85–96, 2000  相似文献   

13.
Let f1 and f2 map [0, T] into the real numbers. A system is following either f1 or f2 and earning the associated reward ∫ f1 or ∫ f2, respectively. It is possible at any time to switch from fi to fj by paying a switching cost b > 0. We determine a switching policy which maximizes the total reward. Conditions which guarantee a planning horizon are established.  相似文献   

14.
This paper deals with a two searchers game and it investigates the problem of how the possibility of finding a hidden object simultaneously by players influences their behavior. Namely, we consider the following two‐sided allocation non‐zero‐sum game on an integer interval [1,n]. Two teams (Player 1 and 2) want to find an immobile object (say, a treasure) hidden at one of n points. Each point i ∈ [1,n] is characterized by a detection parameter λi (μi) for Player 1 (Player 2) such that pi(1 ? exp(?λixi)) (pi(1 ? exp(?μiyi))) is the probability that Player 1 (Player 2) discovers the hidden object with amount of search effort xi (yi) applied at point i where pi ∈ (0,1) is the probability that the object is hidden at point i. Player 1 (Player 2) undertakes the search by allocating the total amount of effort X(Y). The payoff for Player 1 (Player 2) is 1 if he detects the object but his opponent does not. If both players detect the object they can share it proportionally and even can pay some share to an umpire who takes care that the players do not cheat each other, namely Player 1 gets q1 and Player 2 gets q2 where q1 + q2 ≤ 1. The Nash equilibrium of this game is found and numerical examples are given. © 2006 Wiley Periodicals, Inc. Naval Research Logistics, 2007  相似文献   

15.
Let (Y, Xl,…, XK) be a random vector distributed according to a multivariate normal distribution where Xl,…, XK are considered as predictor variables and y is the predictand. Let ri, and Ri denote the population and sample correlation coefficients, respectively, between Y and Xi. The population correlation coefficient ri is a measure of the predictive power of Xi. The author has derived the joint distribution of Rl,…, RK and its asymptotic property. The given result is useful in the problem of selecting the most important predictor variable corresponding to the largest absolute value of ri.  相似文献   

16.
This paper discusses scheduling of data transmission when data can only be transmitted in one direction at a time. A common policy used is the so-called alternating priority policy. In this paper we select a more general class of policies named the {Si; O} policy. We show how to determine the optimal parameters of the {Si; O} policy for given system parameters. We also give a simple example to show that {Si; O} policy is, in fact, better then alternating priority policy.  相似文献   

17.
There are given k (? 2) univariate cumulative distribution functions (c.d.f.'s) G(x; θi) indexed by a real-valued parameter θi, i=1,…, k. Assume that G(x; θi) is stochastically increasing in θi. In this paper interval estimation on the ith smallest of the θ's and related topics are studied. Applications are considered for location parameter, normal variance, binomial parameter, and Poisson parameter.  相似文献   

18.
This paper develops a methodology for optimizing operation of a multipurpose reservoir with a finite capacity V. The input of water into the reservoir is a Wiener process with positive drift. There are n purposes for which water is demanded. Water may be released from the reservoir at any rate, and the release rate can be increased or decreased instantaneously with zero cost. In addition to the reservoir, a supplementary source of water can supply an unlimited amount of water demanded during any period of time. There is a cost of Ci dollars per unit of demand supplied by the supplementary source to the ith purpose (i = 1, 2, …, n). At any time, the demand rate Ri associated with the ith purpose (i = 1, 2, …, n) must be supplied. A controller must continually decide the amount of water to be supplied by the reservoir for each purpose, while the remaining demand will be supplied through the supplementary source with the appropriate costs. We consider the problem of specifying an output policy which minimizes the long run average cost per unit time.  相似文献   

19.
We study a class of new scheduling problems which involve types of teamwork tasks. Each teamwork task consists of several components, and requires a team of processors to complete, with each team member to process a particular component of the task. Once the processor completes its work on the task, it will be available immediately to work on the next task regardless of whether the other components of the last task have been completed or not. Thus, the processors in a team neither have to start, nor have to finish, at the same time as they process a task. A task is completed only when all of its components have been processed. The problem is to find an optimal schedule to process all tasks, under a given objective measure. We consider both deterministic and stochastic models. For the deterministic model, we find that the optimal schedule exhibits the pattern that all processors must adopt the same sequence to process the tasks, even under a general objective function GC = F(f1(C1), f2(C2), … , fn(Cn)), where fi(Ci) is a general, nondecreasing function of the completion time Ci of task i. We show that the optimal sequence to minimize the maximum cost MC = max fi(Ci) can be derived by a simple rule if there exists an order f1(t) ≤ … ≤ fn(t) for all t between the functions {fi(t)}. We further show that the optimal sequence to minimize the total cost TC = ∑ fi(Ci) can be constructed by a dynamic programming algorithm. For the stochastic model, we study three optimization criteria: (A) almost sure minimization; (B) stochastic ordering; and (C) expected cost minimization. For criterion (A), we show that the results for the corresponding deterministic model can be easily generalized. However, stochastic problems with criteria (B) and (C) become quite difficult. Conditions under which the optimal solutions can be found for these two criteria are derived. © 2004 Wiley Periodicals, Inc. Naval Research Logistics, 2004  相似文献   

20.
It is often assumed in the facility location literature that functions of the type øi(xi, y) = βi[(xi-x)2+(yi-y)2]K/2 are twice differentiable. Here we point out that this is true only for certain values of K. Convexity proofs that are independent of the value of K are given.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号