首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 546 毫秒
1.
This paper examines right-hand side sensitivity analysis in linear programming as a problem in optimal sampling. Specifically, the insensitivity point of a solution is defined as the point at which the expected gain from increased accuracy in the prediction of a resource level is equal to the expected cost of procuring the information. The problem is structured using the rudiments of optimal statistical decision theory.  相似文献   

2.
We consider the multiple-attribute decision problem with finite action set and additive utility function. We suppose that the decision maker cannot specify nonnegative weights for the various attributes which would resolve the problem, but that he/she supplies ordinal information about these weights which can be translated into a set of linear constraints restricting their values. A bounded polytope W of feasible weight vectors is thus determined. Supposing that each element of W has the same chance of being the “appropriate one,” we compute the expected utility value of each action. The computation method uses a combination of numerical integration and Monte Carlo simulation and is equivalent to finding the center of mass of the bounded polytope W . Comparisons are made with another criterion already presented, the comparative hyper-volume criterion, and two small examples are presented.  相似文献   

3.
The stochastic sequential assignment problem (SSAP) considers how to allocate available distinct workers to sequentially arriving tasks with stochastic parameters such that the expected total reward obtained from the sequential assignments is maximized. Implementing the optimal assignment policy for the SSAP involves calculating a new set of breakpoints upon the arrival of each task (i.e., for every time period), which is impractical for large‐scale problems. This article studies two problems that are concerned with obtaining stationary policies, which achieve the optimal expected reward per task as the number of tasks approaches infinity. The first problem considers independent and identically distributed (IID) tasks with a known distribution function, whereas in the second problem tasks are derived from r different unobservable distributions governed by an ergodic Markov chain. The convergence rate of the expected reward per task to the optimal value is also obtained for both problems. © 2013 Wiley Periodicals, Inc. Naval Research Logistics, 2013  相似文献   

4.
We investigate a single‐machine scheduling problem for which both the job processing times and due windows are decision variables to be determined by the decision maker. The job processing times are controllable as a linear or convex function of the amount of a common continuously divisible resource allocated to the jobs, where the resource allocated to the jobs can be used in discrete or continuous quantities. We use the common flow allowances due window assignment method to assign due windows to the jobs. We consider two performance criteria: (i) the total weighted number of early and tardy jobs plus the weighted due window assignment cost, and (ii) the resource consumption cost. For each resource consumption function, the objective is to minimize the first criterion, while keeping the value of the second criterion no greater than a given limit. We analyze the computational complexity, devise pseudo‐polynomial dynamic programming solution algorithms, and provide fully polynomial‐time approximation schemes and an enhanced volume algorithm to find high‐quality solutions quickly for the considered problems. We conduct extensive numerical studies to assess the performance of the algorithms. The computational results show that the proposed algorithms are very efficient in finding optimal or near‐optimal solutions. © 2017 Wiley Periodicals, Inc. Naval Research Logistics, 64: 41–63, 2017  相似文献   

5.
In this study, we illustrate a real‐time approximate dynamic programming (RTADP) method for solving multistage capacity decision problems in a stochastic manufacturing environment, by using an exemplary three‐stage manufacturing system with recycle. The system is a moderate size queuing network, which experiences stochastic variations in demand and product yield. The dynamic capacity decision problem is formulated as a Markov decision process (MDP). The proposed RTADP method starts with a set of heuristics and learns a superior quality solution by interacting with the stochastic system via simulation. The curse‐of‐dimensionality associated with DP methods is alleviated by the adoption of several notions including “evolving set of relevant states,” for which the value function table is built and updated, “adaptive action set” for keeping track of attractive action candidates, and “nonparametric k nearest neighbor averager” for value function approximation. The performance of the learned solution is evaluated against (1) an “ideal” solution derived using a mixed integer programming (MIP) formulation, which assumes full knowledge of future realized values of the stochastic variables (2) a myopic heuristic solution, and (3) a sample path based rolling horizon MIP solution. The policy learned through the RTADP method turned out to be superior to polices of 2 and 3. © 2010 Wiley Periodicals, Inc. Naval Research Logistics 2010  相似文献   

6.
针对随机条件下动态规划模型的主要特点,运用智能算法混合编程理论,设计了一种探索多阶段决策问题的智能混合算法.该算法首先将问题转化成一族同类型的一步决策子问题,然后利用随机模拟和遗传算法,依据训练样本形成的训练神经元网络,在单步决策中寻求最优策略和最优目标值,逐个求解,再据初始状态逆序求出最优策略序列和最优目标值.仿真结果表明,该算法具有一定的通用性,初始设计点可以随机产生,其计算精度不因函数的非线性强弱而受影响,对目标和约束的限制较少,可应用于多种形式的随机多阶段决策优化问题,较好地满足了随机动态规划模型求解和优化的要求.  相似文献   

7.
A branch and bound algorithm is developed for a class of allocation problems in which some constraint coefficients depend on the values of certain of the decision variables. Were it not for these dependencies, the problems could be solved by linear programming. The algorithm is developed in terms of a strategic deployment problem in which it is desired to find a least-cost transportation fleet, subject to constraints on men/materiel requirements in the event of certain hypothesized contingencies. Among the transportation vehicles available for selection are aircraft which exhibit the characteristic that the amount of goods deliverable by an aircraft on a particular route in a given time period (called aircraft productivity and measured in kilotons/aircraft/month) depends on the ratio of type 1 to type 2 aircraft used on that particular route. A model is formulated in which these relationships are first approximated by piecewise linear functions. A branch and bound algorithm for solving the resultant nonlinear problem is then presented; the algorithm solves a sequence of linear programming problems. The algorithm is illustrated by a sample problem and comments concerning its practicality are made.  相似文献   

8.
A stochastic linear programming problem under the “wait-and-see” situation is studied. After the conditions for the interchange of the order of integration and differentiation are surveyed, an explicit form of the probability density function of the stochastic linear programming problem is found. An example is also given to illustrate the result.  相似文献   

9.
A mixed optimization technique for optimal machine replacement is presented which allows much more flexibility than previous models. Optimal purchase, maintenance and sale of a given machine between any two given points in time is treated as a subproblem, which one may choose to solve via control theory, dynamic programming, or practical engineering considerations. (A control theory formulation is used in the paper as an illustration.) These subproblem solutions are then incorporated into a Wagner-Whitin formulation for solution of the full problem. The technique is particularly useful for problems with such asymmetries as an existing initial machine or uneven technological change. A simple numerical example is solved in the Appendix.  相似文献   

10.
A new approach is presented for analyzing multiple-attribute decision problems in which the set of actions is finite and the utility function is additive. The problem can be resolved if the decision makers (or group of decision makers) specifies a set of nonnegative weights for the various attributes or criteria, but we here assume that the decision maker(s) cannot provide a numerical value for each such weight. Ordinal information about these weights is therefore obtained from the decision maker(s), and this information is translated into a set of linear constraints which restrict the values of the weights. These constraints are then used to construct a polytope W of feasible weight vectors, and the subsets Hi (polytopes) of W over which each action ai has the greatest utility are determined. With the Comparative Hypervolume Criterion we calculate for each action the ratio of the hypervolume of Hi to the hypervolume of W and suggest the choice of an action with the largest such ratio. Justification of this choice criterion is given, and a computational method for accurately approximating the hypervolume ratios is described. A simple example is provided to evaluate the efficiency of a computer code developed to implement the method.  相似文献   

11.
This article generalizes the dynamic and stochastic knapsack problem by allowing the decision‐maker to postpone the accept/reject decision for an item and maintain a queue of waiting items to be considered later. Postponed decisions are penalized with delay costs, while idle capacity incurs a holding cost. This generalization addresses applications where requests of scarce resources can be delayed, for example, dispatching in logistics and allocation of funding to investments. We model the problem as a Markov decision process and analyze it through dynamic programming. We show that the optimal policy with homogeneous‐sized items possesses a bithreshold structure, despite the high dimensionality of the decision space. Finally, the value (or price) of postponement is illustrated through numerical examples. © 2015 Wiley Periodicals, Inc. Naval Research Logistics 62: 267–292, 2015  相似文献   

12.
搜索路径给定时的最优搜索方案问题,也可以理解为是关于搜索者和目标的二人对策问题,主要讨论了当搜索路径给定时的单个搜索者和单个目标的搜索对策问题。首先根据问题的特点,利用动态规划和迭代的方法,确定关于目标逃逸路径混合策略的最优分区,证明该分区是多面体凸集;针对目标不同逃逸路径的分区,求出搜索者的最大期望收益,再将问题转化为二人有限零和对策,计算出搜索者的支付矩阵,确定最优搜索策略。最后结合海军护航行动,对我舰载直升机搜索小型海盗船进行分析和计算,说明搜索路径给定时的最优搜索对策对于双方的资源分配和提高搜索效率具有一定的应用价值。  相似文献   

13.
Chemotherapy appointment scheduling is a challenging problem due to the uncertainty in premedication and infusion durations. In this paper, we formulate a two‐stage stochastic mixed integer programming model for the chemotherapy appointment scheduling problem under limited availability of nurses and infusion chairs. The objective is to minimize the expected weighted sum of nurse overtime, chair idle time, and patient waiting time. The computational burden to solve real‐life instances of this problem to optimality is significantly high, even in the deterministic case. To overcome this burden, we incorporate valid bounds and symmetry breaking constraints. Progressive hedging algorithm is implemented in order to solve the improved formulation heuristically. We enhance the algorithm through a penalty update method, cycle detection and variable fixing mechanisms, and a linear approximation of the objective function. Using numerical experiments based on real data from a major oncology hospital, we compare our solution approach with several scheduling heuristics from the relevant literature, generate managerial insights related to the impact of the number of nurses and chairs on appointment schedules, and estimate the value of stochastic solution to assess the significance of considering uncertainty.  相似文献   

14.
We study the classical ranking and selection problem, where the ultimate goal is to find the unknown best alternative in terms of the probability of correct selection or expected opportunity cost. However, this paper adopts an alternative sampling approach to achieve this goal, where sampling decisions are made with the objective of maximizing information about the unknown best alternative, or equivalently, minimizing its Shannon entropy. This adaptive learning is formulated via a Bayesian stochastic dynamic programming problem, by which several properties of the learning problem are presented, including the monotonicity of the optimal value function in an information-seeking setting. Since the state space of the stochastic dynamic program is unbounded in the Gaussian setting, a one-step look-ahead approach is used to develop a policy. The proposed policy seeks to maximize the one-step information gain about the unknown best alternative, and therefore, it is called information gradient (IG). It is also proved that the IG policy is consistent, that is, as the sampling budget grows to infinity, the IG policy finds the true best alternative almost surely. Later, a computationally efficient estimate of the proposed policy, called approximated information gradient (AIG), is introduced and in the numerical experiments its performance is tested against recent benchmarks alongside several sensitivity analyses. Results show that AIG performs competitively against other algorithms from the literature.  相似文献   

15.
In this paper we optimally control service rates for an inventory system of service facilities with perishable products. We consider a finite capacity system where arrivals are Poisson‐distributed, lifetime of items have exponential distribution, and replenishment is instantaneous. We determine the service rates to be employed at each instant of time so that the long‐run expected cost rate is minimized for fixed maximum inventory level and capacity. The problem is modelled as a semi‐Markov decision problem. We establish the existence of a stationary optimal policy and we solve it by employing linear programming. Several numerical examples which provide insight to the behavior of the system are presented. © 2002 Wiley Periodicals, Inc. Naval Research Logistics 49: 464–482, 2002; Published online in Wiley InterScience (www.interscience.wiley.com). DOI 10.1002/nav.10021  相似文献   

16.
We consider the problem of scheduling a set of jobs on a single machine subject to random breakdowns. We focus on the preemptive‐repeat model, which addresses the situation where, if a machine breaks down during the processing of a job, the work done on the job prior to the breakdown is lost and the job will have to be started from the beginning again when the machine resumes its work. We allow that (i) the uptimes and downtimes of the machine follow general probability distributions, (ii) the breakdown process of the machine depends upon the job being processed, (iii) the processing times of the jobs are random variables following arbitrary distributions, and (iv) after a breakdown, the processing time of a job may either remain a same but unknown amount, or be resampled according to its probability distribution. We first derive the optimal policy for a class of problems under the criterion to maximize the expected discounted reward earned from completing all jobs. The result is then applied to further obtain the optimal policies for other due date‐related criteria. We also discuss a method to compute the moments and probability distributions of job completion times by using their Laplace transforms, which can convert a general stochastic scheduling problem to its deterministic equivalent. The weighted squared flowtime problem and the maintenance checkup and repair problem are analyzed as applications. © 2004 Wiley Periodicals, Inc. Naval Research Logistics, 2004  相似文献   

17.
基于马尔柯夫过程的武器系统目标分配问题决策分析   总被引:3,自引:1,他引:2  
将防空作战中武器系统目标分配决策作为一个在动态随机系统中实现最优化的问题,并用马尔柯夫过程理论进行建模分析,提出新的算法并运用Matlab编程;通过对实行不同策略时武器系统长期平均效能的分析比较,指出在目标分配问题上仅靠原有的静态线性规划决策方法是不够的,还必须考虑动态随机对抗过程本身的特性.  相似文献   

18.
Consider a standard linear programming problem and suppose that there are bounds available for the decision variables such that those bounds are not violated at an optimal solution of the problem (but they may be violated at some other feasible solutions of the problem). Thus, these bounds may not appear explicitly in the problem, but rather they may have been derived from some prior knowledge about an optimal solution or from the explicit constraints of the problem. In this paper, the bounds on variables are used to compute bounds on the optimal value when the problem is being solved by the simplex method. The latter bounds may then be used as a termination criteria for the simples iterations for the purpose of finding a “sufficiently good” near optimal solution. The bounds proposed are such that the computational effort in evaluating them is insignificant compared to that involved in the simplex iterations. A numerical example is given to demonstrate their performance.  相似文献   

19.
Consider a supplier offering a product to several potential demand sources, each with a unique revenue, size, and probability that it will materialize. Given a long procurement lead time, the supplier must choose the orders to pursue and the total quantity to procure prior to the selling season. We model this as a selective newsvendor problem of maximizing profits where the total (random) demand is given by the set of pursued orders. Given that the dimensionality of a mixed‐integer linear programming formulation of the problem increases exponentially with the number of potential orders, we develop both a tailored exact algorithm based on the L‐shaped method for two‐stage stochastic programming as well as a heuristic method. We also extend our solution approach to account for piecewise‐linear cost and revenue functions as well as a multiperiod setting. Extensive experimentation indicates that our exact approach rapidly finds optimal solutions with three times as many orders as a state‐of‐the‐art commercial solver. In addition, our heuristic approach provides average gaps of less than 1% for the largest problems that can be solved exactly. Observing that the gaps decrease as problem size grows, we expect the heuristic approach to work well for large problem instances. © 2008 Wiley Periodicals, Inc. Naval Research Logistics 2008  相似文献   

20.
We present methods for optimizing generation and storage decisions in an electricity network with multiple unreliable generators, each colocated with one energy storage unit (e.g., battery), and multiple loads under power flow constraints. Our model chooses the amount of energy produced by each generator and the amount of energy stored in each battery in every time period in order to minimize power generation and storage costs when each generator faces stochastic Markovian supply disruptions. This problem cannot be optimized easily using stochastic programming and/or dynamic programming approaches. Therefore, in this study, we present several heuristic methods to find an approximate optimal solution for this system. Each heuristic involves decomposing the network into several single‐generator, single‐battery, multiload systems and solving them optimally using dynamic programming, then obtaining a solution for the original problem by recombining. We discuss the computational performance of the proposed heuristics as well as insights gained from the models. © 2015 Wiley Periodicals, Inc. Naval Research Logistics 62: 493–511, 2015  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号