 共查询到20条相似文献,搜索用时 31 毫秒
1.
We consider the scheduling of n jobs on m identical machines when the jobs become available for processing at ready times ai, ai, ? 0, require di time units for processing and must be completed by times bi for i = 1, 2, … n. The objective chosen is that of minimizing the total elapsed time to complete all jobs subject to the ready time and due date constraints, preemption is not allowed. We present a multi-stage solution algorithm for this problem that is based on an implicit enumeration procedure and also uses the labelling type algorithm which solves the problem when preemption is allowed.  相似文献   

2.
This paper deals with flowshop/sum of completion times scheduling problems, working under a “no-idle” or a “no-wait” constraint, the former prescribes for the machines to work continuously without idle intervals and the latter for the jobs to be processed continuously without waiting times between consecutive machines. Under either of the constraints the problem is unary NP-Complete for two machines. We prove some properties of the optimal schedule for n/2/F, no-idle/σCi. For n/m/P, no-idle/σCi, and n/m/P, no-wait/σCi, with an increasing or decreasing series of dominating machines, we prove theorems that are the basis for polynomial bounded algorithms. All theorems are demonstrated numerically.  相似文献   

3.
Non‐preemptive scheduling of n independent jobs on m unrelated machines so as to minimize the maximal job completion time is considered. A polynomial algorithm with the worst‐case absolute error of min{(1 ? 1/m)pmax, p} is presented, where pmax is the largest job processing time and p is the mth element from the non‐increasing list of job processing times. This is better than the earlier known best absolute error of pmax. The algorithm is based on the rounding of acyclic multiprocessor distributions. An O(nm2) algorithm for the construction of an acyclic multiprocessor distribution is also presented. © 2006 Wiley Periodicals, Inc. Naval Research Logistics, 2006  相似文献   

4.
We study a class of new scheduling problems which involve types of teamwork tasks. Each teamwork task consists of several components, and requires a team of processors to complete, with each team member to process a particular component of the task. Once the processor completes its work on the task, it will be available immediately to work on the next task regardless of whether the other components of the last task have been completed or not. Thus, the processors in a team neither have to start, nor have to finish, at the same time as they process a task. A task is completed only when all of its components have been processed. The problem is to find an optimal schedule to process all tasks, under a given objective measure. We consider both deterministic and stochastic models. For the deterministic model, we find that the optimal schedule exhibits the pattern that all processors must adopt the same sequence to process the tasks, even under a general objective function GC = F(f1(C1), f2(C2), … , fn(Cn)), where fi(Ci) is a general, nondecreasing function of the completion time Ci of task i. We show that the optimal sequence to minimize the maximum cost MC = max fi(Ci) can be derived by a simple rule if there exists an order f1(t) ≤ … ≤ fn(t) for all t between the functions {fi(t)}. We further show that the optimal sequence to minimize the total cost TC = ∑ fi(Ci) can be constructed by a dynamic programming algorithm. For the stochastic model, we study three optimization criteria: (A) almost sure minimization; (B) stochastic ordering; and (C) expected cost minimization. For criterion (A), we show that the results for the corresponding deterministic model can be easily generalized. However, stochastic problems with criteria (B) and (C) become quite difficult. Conditions under which the optimal solutions can be found for these two criteria are derived. © 2004 Wiley Periodicals, Inc. Naval Research Logistics, 2004  相似文献   

5.
We consider the scheduling of n tasks on a single resource. Each task becomes available for processing at time ai, must be completed by time bi, and requires di time units for processing. The aim is to find a schedule that minimizes the elapsed time to complete all jobs. We present solution algorithms for this problem when job splitting is permitted and when job splitting is not permitted. Then we consider several scheduling situations which arise in practice where these models may apply.  相似文献   

6.
Most machine scheduling models assume that the machines are available all of the time. However, in most realistic situations, machines need to be maintained and hence may become unavailable during certain periods. In this paper, we study the problem of processing a set of n jobs on m parallel machines where each machine must be maintained once during the planning horizon. Our objective is to schedule jobs and maintenance activities so that the total weighted completion time of jobs is minimized. Two cases are studied in this paper. In the first case, there are sufficient resources so that different machines can be maintained simultaneously if necessary. In the second case, only one machine can be maintained at any given time. In this paper, we first show that, even when all jobs have the same weight, both cases of the problem are NP-hard. We then propose branch and bound algorithms based on the column generation approach for solving both cases of the problem. Our algorithms are capable of optimally solving medium sized problems within a reasonable computational time. We note that the general problem where at most j machines, 1 ≤ jm, can be maintained simultaneously, can be solved similarly by the column generation approach proposed in this paper. © 2000 John Wiley & Sons, Inc. Naval Research Logistics 47: 145–165, 2000  相似文献   

7.
We consider a problem of scheduling jobs on m parallel machines. The machines are dedicated, i.e., for each job the processing machine is known in advance. We mainly concentrate on the model in which at any time there is one unit of an additional resource. Any job may be assigned the resource and this reduces its processing time. A job that is given the resource uses it at each time of its processing. No two jobs are allowed to use the resource simultaneously. The objective is to minimize the makespan. We prove that the two‐machine problem is NP‐hard in the ordinary sense, describe a pseudopolynomial dynamic programming algorithm and convert it into an FPTAS. For the problem with an arbitrary number of machines we present an algorithm with a worst‐case ratio close to 3/2, and close to 3, if a job can be given several units of the resource. For the problem with a fixed number of machines we give a PTAS. Virtually all algorithms rely on a certain variant of the linear knapsack problem (maximization, minimization, multiple‐choice, bicriteria). © 2008 Wiley Periodicals, Inc. Naval Research Logistics, 2008  相似文献   

8.
We investigate the solvability of two single‐machine scheduling problems when the objective is to identify among all job subsets with cardinality k,1≤kn, the one that has the minimum objective function value. For the single‐machine minimum maximum lateness problem, we conclude that the problem is solvable in O(n2) time using the proposed REMOVE algorithm. This algorithm can also be used as an alternative to Moore's algorithm to solve the minimum number of tardy jobs problem by actually solving the hierarchical problem in which the objective is to minimize the maximum lateness subject to the minimum number of tardy jobs. We then show that the REMOVE algorithm cannot be used to solve the general case of the single‐machine total‐weighted completion time problem; we derive sufficient conditions among the job parameters so that the total weighted completion time problem becomes solvable in O(n2) time. © 2013 Wiley Periodicals, Inc. Naval Research Logistics 60: 449–453, 2013  相似文献   

9.
To location Li we are to allocate a “generator” and ni “machines” for i = 1, …,k, where n1n1 ≧ … ≧ nk. Although the generators and machines function independently of one another, a machine is operable only if it and the generator at its location are functioning. The problem we consider is that of finding the arrangement or allocation optimizing the number of operable machines. We show that if the objective is to maximize the expected number of operable machines at some future time, then it is best to allocate the best generator and the n1 best machines to location L1, the second-best generator and the n2-next-best machines to location L2, etc. However, this arrangement is not always stochastically optimal. For the case of two generators we give a necessary and sufficient condition that this arrangement is stochastically best, and illustrate the result with several examples.  相似文献   

10.
We consider server scheduling on parallel dedicated machines to minimize the makespan. Each job has a loading operation and a processing operation. The loading operation requires a server that serves all the jobs. Each machine has a given set of jobs to process, and the processing sequence is known and fixed. We design a polynomial‐time algorithm to solve the two‐machine case of the problem. When the number of machines is arbitrary, the problem becomes strongly NP‐hard even if all the jobs have the same processing length or all the loading operations require a unit time. We design two heuristic algorithms to treat the case where all the loading times are unit and analyze their performance.  相似文献   

11.
We consider a model with M + N identical machines. As many as N of these can be working at any given time and the others act as standby spares. Working machines fail at exponential rate λ, spares fail at exponential rale γ, and failed machines are repaired at exponential rate μ. The control variables are λ. μ, and the number of removable repairman, S, to be operated at any given time. Using the criterion of total expected discounted cost, we show that λ, S, and μ are monotonic functions of the number of failed machines M, N, the discount factor, and for the finite time horizon model, the amount of time remaining.  相似文献   

12.
Suppose that the state of a queueing system is described by a Markov process { Yt, t ≥ 0}, and the profit from operating it up to a time t is given by the function f(Yt). We operate the system up to a time T, where the random variable T is a stopping time for the process Yt. Optimal stochastic control is achieved by choosing the stopping time T that maximizes Ef(YT) over a given class of stopping times. In this paper a theory of stochastic control is developed for a single server queue with Poisson arrivals and general service times.  相似文献   

13.
The problem of minimum makespan on an m machine jobshop with unit execution time (UET) jobs (m ≥ 3) is known to be strongly NP‐hard even with no setup times. We focus in this article on the two‐machine case. We assume UET jobs and consider batching with batch availability and machine‐dependent setup times. We introduce an efficient \begin{align*}(O(\sqrt{n}))\end{align*} algorithm, where n is the number of jobs. We then introduce a heuristic for the multimachine case and demonstrate its efficiency for two interesting instances. © 2011 Wiley Periodicals, Inc. Naval Research Logistics, 2011  相似文献   

14.
Variations of Hale's channel assignment problem, the L(j, k)‐labeling problem and the radio labeling problem require the assignment of integers to the vertices of a graph G subject to various distance constraints. The λj,k‐number of G and the radio number of G are respectively the minimum span among all L(j, k)‐labelings, and the minimum span plus 1 of all radio labelings of G (defined in the Introduction). In this paper, we establish the λj,k‐number of ∏ K for pairwise relatively prime integers t1 < t2 < … < tq, t1 ≥ 2. We also show the existence of an infinite class of graphs G with radio number |V(G)| for any diameter d(G). © 2003 Wiley Periodicals, Inc. Naval Research Logistics, 2005  相似文献   

15.
An attacker, being one of two types, initiates an attack at some time in the interval [-T, 0]. The a priori probabilities of each type are known. As time elapses the defender encounters false targets which occur according to a known Poisson process and which can be properly classified with known probability. The detection and classification probabilities for each type attacker are given. If the defender responds with a weapon at the time of attack, he survives with a probability which depends on the number of weapons in his possession and on attacker type. If he does not respond, his survival probability is smaller. These probabilities are known, as well as the current number of weapons in the defender's possession. They decrease as the number of weapons decreases. The payoff is the defender's survival probability. An iterative system of first-order differential equations is derived whose unique solution V1(t),V2(t),…,Vk(t) is shown to be the value of the game at time t, when the defender has 1, 2,…, k,… weapons, respectively. The optimal strategies are determined. Limiting results are obtained as t→-∞, while the ratio of the number of weapons to the expected number of false targets remaining is held constant.  相似文献   

16.
T identical exponential lifetime components out of which G are initially functioning (and B are not) are to be allocated to N subsystems, which are connected either in parallel or in series. Subsystem i, i = 1,…, N, functions when at least Ki of its components function and the whole system is maintained by a single repairman. Component repair times are identical independent exponentials and repaired components are as good as new. The problem of the determination of the assembly plan that will maximize the system reliability at any (arbitrary) time instant t is solved when the component failure rate is sufficiently small. For the parallel configuration, the optimal assembly plan allocates as many components as possible to the subsystem with the smallest Ki and allocates functioning components to subsystems in increasing order of the Ki's. For the series configuration, the optimal assembly plan allocates both the surplus and the functioning components equally to all subsystems whenever possible, and when not possible it favors subsystems in decreasing order of the Ki's. The solution is interpreted in the context of the optimal allocation of processors and an initial number of jobs in a problem of routing time consuming jobs to parallel multiprocessor queues. © John Wiley & Sons, Inc. Naval Research Logistics 48: 732–746, 2001  相似文献   

17.
We consider a class of production scheduling models with m identical machines in parallel and k different product types. It takes a time pi to produce one unit of product type i on any one of the machines. There is a demand stream for product type i consisting of ni units with each unit having a given due date. Before a machine starts with the production of a batch of products of type i a setup cost c is incurred. We consider several different objective functions. Each one of the objective functions has three components, namely a total setup cost, a total earliness cost, and a total tardiness cost. In our class of problems we find a relatively large number of problems that can be solved either in polynomial time or in pseudo‐polynomial time. The polynomiality or pseudo‐polynomiality is achieved under certain special conditions that may be of practical interest; for example, a regularity pattern in the string of due dates combined with earliness and tardiness costs that are similar for different types of products. The class of models we consider includes as special cases discrete counterparts of a number of inventory models that have been considered in the literature before, e.g., Wagner and Whitin (Manage Sci 5 (1958), 89–96) and Zangwill (Oper Res 14 (1966), 486–507; Manage Sci 15 (1969), 506–527). © 2008 Wiley Periodicals, Inc. Naval Research Logistics, 2008  相似文献   

18.
The paper discusses mathematical properties of the well-known Bellman-Johnson 3 × n sequencing problem. Optimal rules for some special cases are developed. For the case min Bi ≥ maxAj we find an optimal sequence of the 2 × n problem for machines B and C and move one item to the front of the sequence to minimize (7); when min Bi ≥ max Cj we solve a 2 × n problem for machines A and B and move one item to the end of the optimal sequence so as to minimize (9). There is also given a sufficient optimality condition for a solution obtained by Johnson's approximate method. This explains why this method so often produces an optimal solution.  相似文献   

19.
We consider the problem of rescheduling n jobs to minimize the makespan on m parallel identical processors when m changes value. We show this problem to be NP-hard in general. Call a list schedule totally optimal if it is optimal for all m = 1, …,n. When n is less than 6, there always exists a totally optimal schedule, but for n ≥ 6 this can fail. We show that an exact solution is less robust than the largest processing time first (LPT) heuristic and discuss implications for polynomial approximation schemes and hierarchical planning models.  相似文献   

20.
In this paper, we consider a coherent system with n independent and identically distributed components under the condition that the system is monitored at time instances t1 and t2 (t1 < t2). First, various mixture representations for reliability function of the conditional residual lifetime of the coherent system are derived under different scenarios at times t1 and t2 (t1 < t2). Several stochastic comparisons between two systems are also made based on the proposed conditional random variables. Then, we consider the conditional residual lifetime of the functioning components of the system given that j components have failed at time t1 and the system has failed at time t2. Some stochastic comparisons on the proposed conditional residual lifetimes are investigated. Several illustrative graphs and examples are also provided.  相似文献   