首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 15 毫秒
1.
This paper is devoted to study several aspects of the median residual life function (MERLF). In reliability studies, it is well known that, although the MERLF have several advantages over the mean residual life function (MRLF), the MRLF has the good property of uniquely determine a life distribution whereas either the median residual life function (MERLF) or an α‐percentile residual life do not have such good property. We shall give a characterization result where knowledge of both the MERLF and the survival function on an interval does uniquely determine the distribution. Moreover, in order to apply this characterization in practical situations, we propose a method to estimate the necessary information of the survival function. Relationships between analytical properties of the survival function and its associated MERLF are also obtained. Bryson and Siddiqui [J Am Statist Assoc 64 (1969), 1472–1483] proved relationships among seven criteria for aging, out of which two contained the MRLF (decreasing MRLF and net decreasing MRLF). In this paper, we prove that the same pattern of relationships holds if the MRLF is replaced by the MERLF. We also examine the aging criteria corresponding to an increasing MERLF and show that there is no relation between the behavior (increasing or decreasing) of the MERLF and of the MRLF. © 2005 Wiley Periodicals, Inc. Naval Research Logistics, 2005  相似文献   

2.
This paper discusses the properties of positive, integer valued compound Poisson processes and compares two members of the family: the geometric Poisson (stuttering Poisson) and the logarithmic Poisson. It is shown that the geometric Poisson process is particularly convenient when the analyst is interested in a simple model for the time between events, as in simulation. On the other hand, the logarithmic Poisson process is more convenient in analytic models in which the state probabilities (probabilities for the number of events in a specified time period) are required. These state probabilities have a negative binomial distribution. The state probabilities of the geometric Poisson process, known as the geometric Poisson distribution, are tabled for 160 sets of parameter values. The values of mean demand range from 0.10 to 10; those for variance to mean ratio from 1.5 to 7. It is observed that the geometric Poisson density is bimodal.  相似文献   

3.
Utilizing elementary geometric and probability considerations, we estimate the effect of crowd blocking in suicide bombing events. It is shown that the effect is quite significant. Beyond a certain threshold, the expected number of casualties decreases with the number of people in the arena. The numerical results of our model are consistent with casualty data from suicide bombing events in Israel. Some operational insights are discussed. © 2004 Wiley Periodicals, Inc. Naval Research Logistics, 2005.  相似文献   

4.
A joint optimization of the production run length and preventive maintenance (PM) policy is studied for a deteriorating production system where the in‐control period follows a general probability distribution with non‐decreasing failure rate. In the literature, the sufficient conditions for the optimality of the equal‐interval PM schedule is explored to derive an optimal production run length and an optimal number of PM actions. Nevertheless, an exhaustive search may arise. In this study, based on the assumption that the conditions for the optimality of the equal‐interval PM schedule hold, we derive some structural properties for the optimal production/PM policy, which increases the efficiency of the solution procedure. These analyses have implications for the practical application of the production/PM model to be more available in practice. A numerical example of gamma shift distribution with non‐decreasing failure rates is used to illustrate the solution procedure, leading to some insight into the management process. © 2005 Wiley Periodicals, Inc. Naval Research Logistics, 2006  相似文献   

5.
In this paper, we present the heavy‐traffic bottleneck phenomenon under multiclass deterministic routing and discuss how it can be addressed by decomposition approximation. Examples show that Bitran and Tirupati's method and Whitt's enhancements for deterministic routing may not properly account for this phenomenon. We propose refinements to these methods based on Whitt's variability functions. Results of numerical experiments on simple networks and semiconductor manufacturing process show significant improvement in the approximation of expected waiting time at bottleneck stations. © 2005 Wiley Periodicals, Inc. Naval Research Logistics, 2005.  相似文献   

6.
In this article, we study aging properties of parallel and series systems with a random number of components. We show that the decreasing likelihood ratio property is closed under the formation of random minima. We also show, by counterexamples, that other aging properties are not closed under the formation of random minima or maxima. Some mistakes in the literature are corrected. © 2014 Wiley Periodicals, Inc. Naval Research Logistics 61: 238–243, 2014  相似文献   

7.
We consider the problem of safely and swiftly navigating through a spatial arrangement of potential hazard detections in which each detection has associated with it a probability that the detection is indeed a true hazard. When in close proximity to a detection, we assume the ability—for a cost—to determine whether or not the hazard is real. Our approach to this problem involves a new object, the random disambiguation path (RDP), which is a curve‐valued random variable parametrized by a binary tree with particular properties. We prove an admissibility result showing that there is positive probability that the use of an RDP reduces the expected traversal length compared to the conventional shortest zero‐risk path, and we introduce a practically computable additive‐constant approximation to the optimal RDP. The theoretical considerations are complemented by simulation and example. © 2005 Wiley Periodicals, Inc. Naval Research Logistics, 2005  相似文献   

8.
This article examines a version of the machine repair problem where failures may be irreparable. Since the number of machines in the system keeps decreasing, we impose a fixed state-dependent ordering policy of the type often encountered in inventory models. Although the system is Markovian, the number of states becomes very large. The emphasis of the article, therefore, is on deriving computationally tractable formulas for the steady-state probabilities, the long-run average cost per unit time, and the vector of expected discounted costs. When the state space is so large that exact computations may be infeasible, we propose approximations which are relatively quick and simple to compute and which yield very accurate results for the test problems examined.  相似文献   

9.
The first problem considered in this paper is concerned with the assembly of independent components into parallel systems so as to maximize the expected number of systems that perform satisfactorily. Associated with each component is a probability of it performing successfully. It is shown that an optimal assembly is obtained if the reliability of each assembled system can be made equal. If such equality is not attainable, then bounds are given so that the maximum expected number of systems that perform satisfactorily will lie within these stated bounds; the bounds being a function of an arbitrarily chosen assembly. An improvement algorithm is also presented. A second problem treated is concerned with the optimal design of a system. Instead of assembling given units, there is an opportunity to “control” their quality, i.e., the manufacturer is able to fix the probability, p, of a unit performing successfully. However, his resources, are limited so that a constraint is imposed on these probabilities. For (1) series systems, (2) parallel systems, and (3) k out of n systems, results are obtained for finding the optimal p's which maximize the reliability of a single system, and which maximize the expected number of systems that perform satisfactorily out of a total assembly of J systems.  相似文献   

10.
We consider an EOQ model with multiple suppliers that have random capacities, which leads to uncertain yield in orders. A given order is fully received from a supplier if the order quantity is less than the supplier's capacity; otherwise, the quantity received is equal to the available capacity. The optimal order quantities for the suppliers can be obtained as the unique solution of an implicit set of equations in which the expected unsatisfied order is the same for each supplier. Further characterizations and properties are obtained for the uniform and exponential capacity cases with discussions on the issues related to diversification among suppliers. © 2005 Wiley Periodicals, Inc. Naval Research Logistics, 2006  相似文献   

11.
We present a group testing model for items characterized by marker random variables. An item is defined to be good (defective) if its marker is below (above) a given threshold. The items can be tested in groups; the goal is to obtain a prespecified number of good items by testing them in optimally sized groups. Besides this group size, the controller has to select a threshold value for the group marker sums, and the target number of groups which by the tests are classified to consist only of good items. These decision variables have to be chosen so as to minimize a cost function, which is a linear combination of the expected number of group tests and an expected penalty for missing the desired number of good items, subject to constraints on the probabilities of misclassifications. We treat two models of this kind: the first one is based on an infinite population size, whereas the second one deals with the case of a finite number of available items. All performance measures are derived in closed form; approximations are also given. Furthermore, we prove monotonicity properties of the components of the objective function and of the constraints. In several examples, we study (i) the dependence of the cost function on the decision variables and (ii) the dependence of the optimal values of the decision variables (group size, group marker threshold, and stopping rule for groups classified as clean) and of the target functionals (optimal expected number of tests, optimal expected penalty, and minimal expected cost) on the system parameters.© 2011 Wiley Periodicals, Inc. Naval Research Logistics, 2011  相似文献   

12.
Industrial situations exist where it is necessary to estimate the optimum number of parts to start through a manufacturing process in order to obtain a given number of completed good items. The solution to this problem is not straightforward when the expected number of rejects from the process is a random variable and when there are alternative penalties associated with producing too many or too few items. This paper discusses various aspects of this problem as well as some of the proposed solutions to it. In addition, tables of optimum reject allowances based on a comprehensive model are presented.  相似文献   

13.
We study in this paper the price‐dependent (PD) newsvendor model in which a manufacturer sells a product to an independent retailer facing uncertain demand and the retail price is endogenously determined by the retailer. We prove that for a zero salvage value and some expected demand functions, in equilibrium, the manufacturer may elect not to introduce buybacks. On the other hand, if buybacks are introduced in equilibrium, their introduction has an insignificant effect on channel efficiency improvement, but, by contrast, may significantly shift profits from the retailer to the manufacturer. We further demonstrate that the introduction of buybacks increases the wholesale price, retail price, and inventory level, as compared to the wholesale price‐only contract, and that the corresponding vertically integrated firm offers the lowest retail price and highest inventory level. © 2005 Wiley Periodicals, Inc. Naval Research Logistics, 2005.  相似文献   

14.
An attacker, being one of two types, initiates an attack at some time in the interval [-T, 0]. The a priori probabilities of each type are known. As time elapses the defender encounters false targets which occur according to a known Poisson process and which can be properly classified with known probability. The detection and classification probabilities for each type attacker are given. If the defender responds with a weapon at the time of attack, he survives with a probability which depends on the number of weapons in his possession and on attacker type. If he does not respond, his survival probability is smaller. These probabilities are known, as well as the current number of weapons in the defender's possession. They decrease as the number of weapons decreases. The payoff is the defender's survival probability. An iterative system of first-order differential equations is derived whose unique solution V1(t),V2(t),…,Vk(t) is shown to be the value of the game at time t, when the defender has 1, 2,…, k,… weapons, respectively. The optimal strategies are determined. Limiting results are obtained as t→-∞, while the ratio of the number of weapons to the expected number of false targets remaining is held constant.  相似文献   

15.
We study joint preventive maintenance (PM) and production policies for an unreliable production‐inventory system in which maintenance/repair times are non‐negligible and stochastic. A joint policy decides (a) whether or not to perform PM and (b) if PM is not performed, then how much to produce. We consider a discrete‐time system, formulating the problem as a Markov decision process (MDP) model. The focus of the work is on the structural properties of optimal joint policies, given the system state comprised of the system's age and the inventory level. Although our analysis indicates that the structure of optimal joint policies is very complex in general, we are able to characterize several properties regarding PM and production, including optimal production/maintenance actions under backlogging and high inventory levels, and conditions under which the PM portion of the joint policy has a control‐limit structure. In further special cases, such as when PM set‐up costs are negligible compared to PM times, we are able to establish some additional structural properties. © 2005 Wiley Periodicals, Inc. Naval Research Logistics, 2005.  相似文献   

16.
This paper considers the search for an evader concealed in one of an arbitrary number of regions, each of which is characterized by its detection probability. We shall be concerned here with the double-sided problem in which the evader chooses this probability secretly, although he may not subsequently move; his aim is to maximize the expected time to detection, while the searcher attempts to minimize it. The situation where two regions are involved has been studied previously and reported on recently. This paper represents a continuation of this analysis. It is normally true that as the number of regions increases, optimal strategies for both searcher and evader are progressively more difficult to determine precisely. However it will be shown that, generally, satisfactory approximations to each are almost as easily derived as in the two region problem, and that the accuracy of such approximations is essentially independent of the number of regions. This means that so far as the evader is concerned, characteristics of the two-region problem may be used to assess the accuracy of such approximate strategies for problems of more than two regions.  相似文献   

17.
The geometric process is considered when the distribution of the first interarrival time is assumed to be Weibull. Its one‐dimensional probability distribution is derived as a power series expansion of the convolution of the Weibull distributions. Further, the mean value function is expanded into a power series using an integral equation. © 2014 Wiley Periodicals, Inc. Naval Research Logistics, 61: 599–603, 2014  相似文献   

18.
This paper explores the relationship between research project cost and expected time to completion under various scheduling strategies; it assumes that many potential technical approaches to the research problem can be identified; and that each approach has a low but finite subjective probability of success. It is shown that under a variety of assumptions, expected time to project completion can be reduced, but that as a result expected project cost rises at an increasing rate. Some cases in which this convex time-cost tradeoff relationship might not hold generally are identified. When the time-cost tradeoff function is convex, the desirability of concurrent as opposed to series scheduling of approaches depends crucially upon the depth of the stream of benefits expected to be realized upon successful project completion. The deeper the benefit stream is, the more desirable concurrent scheduling is.  相似文献   

19.
It came as a surprise to many international observers when, on 31 March 2005, the United Nations Security Council passed resolution 1593, which referred the situation in Darfur to the jurisdiction of the International Criminal Court. Some celebrated this event as initiating a new era in which international criminal justice would prevail, but they might have done well to consider the objections immediately raised by the representatives of the Sudanese government, which was not a party to the ICC, a point that created a series of impediments to the implementation of the resolution. For all that the ICC has been charged with investigating crimes against humanity in Darfur, its investigators are being prevented from seeking the evidence on the ground essential to any successful prosecution. The Sudanese government has so far maintained its obstructive position, arguing that it is capable of handling such cases within its own sovereign jurisdiction. The imperative of excluding the ICC from Darfur has contributed to Khartoum's objections to the deployment of a UN force to replace the African Union mission there. In sum: the challenges faced by the ICC in Darfur demonstrate that international criminal justice does not operate in a political vacuum.  相似文献   

20.
One of the major problems in modeling production systems is how to treat the job arrival process. Restrictive assumptions such as Markovian arrivals do not represent real world systems, especially if the arrival process is generated by job departures from upstream workstations. Under these circumstances, cost‐effective policies that are robust with respect to the nature of the arrival process become of interest. In this paper, we focus on minimizing the expected total holding and setup costs in a two‐stage produce‐to‐order production system operated by a cross‐trained worker. We will show that if setup times are insignificant in comparison with processing times, then near‐optimal policies can be generated with very robust performances with respect to the arrival process. We also present conditions under which these near‐optimal policies can be obtained by using only the arrival and service rates. © 2004 Wiley Periodicals, Inc. Naval Research Logistics, 2005.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号