首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 31 毫秒
1.
In this article, we define a scheduling/packing problem called the Job Splitting Problem, motivated by the practices in the printing industry. There are n types of items to be produced on an m‐slot machine. A particular assignment of the types to the slots is called a “run” configuration and requires a setup cost. Once a run begins, the production continues according to that configuration and the “length” of the run represents the quantity produced in each slot during that run. For each unit of production in excess of demand, there is a waste cost. Our goal is to construct a production plan, i.e., a set of runs, such that the total setup and waste cost is minimized. We show that the problem is strongly NP‐hard and propose two integer programming formulations, several preprocessing steps, and two heuristics. We also provide a worst‐case bound for one of the heuristics. Extensive tests on real‐world and randomly generated instances show that the heuristics are both fast and effective, finding near‐optimal solutions. © 2010 Wiley Periodicals, Inc. Naval Research Logistics, 2010  相似文献   

2.
空空导弹攻击区处理的拟合——插值法   总被引:3,自引:0,他引:3  
用最小二乘拟合与插值相结合的方法对空空导弹的发射包线进行处理,降低了拟合阶次。数字仿真结果表明,该方法不但在平常发射条件下极大地提高了拟合的精度和速度,而且在一些传统方法几乎无法使用的异常情况下仍有较好的结果。  相似文献   

3.
属性约简与近似集的关系研究   总被引:1,自引:0,他引:1       下载免费PDF全文
上近似和下近似是在粗集理论中最基本的概念,而粗集理论的主要思想又是在保持分类能力不变的前提下通过对属性的约简导出问题的决策和分类规则。本文讨论了属性的约简和相对约简与上近似和下近似的关系,并在此基础上提出了一种新的相对约简———保近似约简。  相似文献   

4.
This article studies a min‐max path cover problem, which is to determine a set of paths for k capacitated vehicles to service all the customers in a given weighted graph so that the largest path cost is minimized. The problem has wide applications in vehicle routing, especially when the minimization of the latest service completion time is a critical performance measure. We have analyzed four typical variants of this problem, where the vehicles have either unlimited or limited capacities, and they start from either a given depot or any depot of a given depot set. We have developed approximation algorithms for these four variants, which achieve approximation ratios of max{3 ‐ 2/k,2}, 5, max{5 ‐ 2/k,4}, and 7, respectively. We have also analyzed the approximation hardness of these variants by showing that, unless P = NP , it is impossible for them to achieve approximation ratios less than 4/3, 3/2, 3/2, and 2, respectively. We have further extended the techniques and results developed for this problem to other min‐max vehicle routing problems.© 2010 Wiley Periodicals, Inc. Naval Research Logistics, 2010  相似文献   

5.
In this article, we consider the concurrent open shop scheduling problem to minimize the total weighted completion time. When the number of machines is arbitrary, the problem has been shown to be inapproximable within a factor of 4/3 ‐ ε for any ε > 0 if the unique games conjecture is true in the literature. We propose a polynomial time approximation scheme for the problem under the restriction that the number of machines is fixed. © 2011 Wiley Periodicals, Inc. Naval Research Logistics, 2011  相似文献   

6.
The paper considers the open shop scheduling problem to minimize the make-span, provided that one of the machines has to process the jobs according to a given sequence. We show that in the preemptive case the problem is polynomially solvable for an arbitrary number of machines. If preemption is not allowed, the problem is NP-hard in the strong sense if the number of machines is variable, and is NP-hard in the ordinary sense in the case of two machines. For the latter case we give a heuristic algorithm that runs in linear time and produces a schedule with the makespan that is at most 5/4 times the optimal value. We also show that the two-machine problem in the nonpreemptive case is solvable in pseudopolynomial time by a dynamic programming algorithm, and that the algorithm can be converted into a fully polynomial approximation scheme. © 1998 John Wiley & Sons, Inc. Naval Research Logistics 45: 705–731, 1998  相似文献   

7.
We consider a single-machine scheduling model in which the job processing times are controllable variables with linear costs. The objective is to minimize the sum of the cost incurred in compressing job processing times and the cost associated with the number of late jobs. The problem is shown to be NP-hard even when the due dates of all jobs are identical. We present a dynamic programming solution algorithm and a fully polynomial approximation scheme for the problem. Several efficient heuristics are proposed for solving the problem. Computational experiments demonstrate that the heuristics are capable of producing near-optimal solutions quickly. © 1998 John Wiley & Sons, Inc. Naval Research Logistics 45: 67–82, 1998  相似文献   

8.
低轨单星对自由段弹道的估计是天基预警系统需解决的关键技术之一.建立了低轨预警卫星对自由段弹道的观测模型,针对极大似然估计批处理算法的大运算量问题,给出了一种多项式逼近算法,由观测数据的逼近多项式在一些特定采样点的值形成伪观测数据,以伪观测数据代替原观测数据进行弹道估计.仿真表明,精度与极大似然估计相当,运算量显著降低.  相似文献   

9.
针对直接基于透视投影模型的标定算法计算量大、结果不稳定的事实,提出一种基于仿射投影矩阵的标定算法。算法首先线性解算仿射投影矩阵,然后分解出部分参数。在假定主点坐标等于图像中心的前提下,解算出其余参数,再以重投影图像点残差和为目标函数,对所有参数进行优化,获得精确的摄像机模型参数,达到精确、快速、稳定的标定目的。大量的仿真和真实图像实验证明算法比传统算法更稳定。  相似文献   

10.
We consider a problem of scheduling jobs on m parallel machines. The machines are dedicated, i.e., for each job the processing machine is known in advance. We mainly concentrate on the model in which at any time there is one unit of an additional resource. Any job may be assigned the resource and this reduces its processing time. A job that is given the resource uses it at each time of its processing. No two jobs are allowed to use the resource simultaneously. The objective is to minimize the makespan. We prove that the two‐machine problem is NP‐hard in the ordinary sense, describe a pseudopolynomial dynamic programming algorithm and convert it into an FPTAS. For the problem with an arbitrary number of machines we present an algorithm with a worst‐case ratio close to 3/2, and close to 3, if a job can be given several units of the resource. For the problem with a fixed number of machines we give a PTAS. Virtually all algorithms rely on a certain variant of the linear knapsack problem (maximization, minimization, multiple‐choice, bicriteria). © 2008 Wiley Periodicals, Inc. Naval Research Logistics, 2008  相似文献   

11.
In this article, we develop a stochastic approximation algorithm to find good bid price policies for the joint capacity allocation and overbooking problem over an airline network. Our approach is based on visualizing the total expected profit as a function of the bid prices and searching for a good set of bid prices by using the stochastic gradients of the total expected profit function. We show that the total expected profit function that we use is differentiable with respect to the bid prices and derive a simple expression that can be used to compute its stochastic gradients. We show that the iterates of our stochastic approximation algorithm converge to a stationary point of the total expected profit function with probability 1. Our computational experiments indicate that the bid prices computed by our approach perform significantly better than those computed by standard benchmark strategies and the performance of our approach is relatively insensitive to the frequency with which we recompute the bid prices over the planning horizon. © 2011 Wiley Periodicals, Inc. Naval Research Logistics, 2011  相似文献   

12.
We consider the problem of scheduling n independent and simultaneously available jobs without preemption on a single machine, where the machine has a fixed maintenance activity. The objective is to find the optimal job sequence to minimize the total amount of late work, where the late work of a job is the amount of processing of the job that is performed after its due date. We first discuss the approximability of the problem. We then develop two pseudo‐polynomial dynamic programming algorithms and a fully polynomial‐time approximation scheme for the problem. Finally, we conduct extensive numerical studies to evaluate the performance of the proposed algorithms. © 2016 Wiley Periodicals, Inc. Naval Research Logistics 63: 172–183, 2016  相似文献   

13.
本文用正则化方法给出了拉普拉斯变换的数值反演方法,并考虑了问题的不适定性,此方法在实际中有较强的应用价值.  相似文献   

14.
This paper addresses a two‐machine open shop scheduling problem, in which the machines are not continuously available for processing. The processing of an operation affected by a non‐availability interval can be interrupted and resumed later. The objective is to minimize the makespan. We present two polynomial‐time approximation schemes, one of which handles the problem with one non‐availability interval on each machine and the other for the problem with several non‐availability intervals on one of the machines. Problems with a more general structure of the non‐availability intervals are not approximable in polynomial time within a constant factor, unless . © 2005 Wiley Periodicals, Inc. Naval Research Logistics, 2006  相似文献   

15.
Logistical planning problems are complicated in practice because planners have to deal with the challenges of demand planning and supply replenishment, while taking into account the issues of (i) inventory perishability and storage charges, (ii) management of backlog and/or lost sales, and (iii) cost saving opportunities due to economies of scale in order replenishment and transportation. It is therefore not surprising that many logistical planning problems are computationally difficult, and finding a good solution to these problems necessitates the development of many ad hoc algorithmic procedures to address various features of the planning problems. In this article, we identify simple conditions and structural properties associated with these logistical planning problems in which the warehouse is managed as a cross‐docking facility. Despite the nonlinear cost structures in the problems, we show that a solution that is within ε‐optimality can be obtained by solving a related piece‐wise linear concave cost multi‐commodity network flow problem. An immediate consequence of this result is that certain classes of logistical planning problems can be approximated by a factor of (1 + ε) in polynomial time. This significantly improves upon the results found in literature for these classes of problems. We also show that the piece‐wise linear concave cost network flow problem can be approximated to within a logarithmic factor via a large scale linear programming relaxation. We use polymatroidal constraints to capture the piece‐wise concavity feature of the cost functions. This gives rise to a unified and generic LP‐based approach for a large class of complicated logistical planning problems. © 2009 Wiley Periodicals, Inc. Naval Research Logistics, 2009  相似文献   

16.
In this paper, we present the heavy‐traffic bottleneck phenomenon under multiclass deterministic routing and discuss how it can be addressed by decomposition approximation. Examples show that Bitran and Tirupati's method and Whitt's enhancements for deterministic routing may not properly account for this phenomenon. We propose refinements to these methods based on Whitt's variability functions. Results of numerical experiments on simple networks and semiconductor manufacturing process show significant improvement in the approximation of expected waiting time at bottleneck stations. © 2005 Wiley Periodicals, Inc. Naval Research Logistics, 2005.  相似文献   

17.
In this article, we consider the performance evaluation of a multicomponent, multiproduct assemble‐to‐order (ATO) system. Each component is managed independently using a base‐stock policy at a supply facility with limited production capacity and an infinite buffer. The arrivals of demands follow a multivariate Poisson process and unfilled demands are backlogged. Because exact analysis of the proposed system is not feasible, we propose two approximation methods which provide upper and lower bounds for various performance measures such as fill rate, average waiting time, and average number of backorders of the proposed system. Our computational experiments demonstrate the effectiveness of the two approximation methods under various system settings. © 2011 Wiley Periodicals, Inc. Naval Research Logistics, 2011  相似文献   

18.
NORX算法是进入凯撒竞赛第三轮的15个认证加密候选算法之一,该算法的唯一非线性组件由异或、与和移位操作组成。从非线性逼近和循环分析两个密码学性质研究移位参数的选取准则,证明了可变移位函数的非线性逼近概率为三值函数,并得到了移位参数取1时具有最佳的非线性逼近性质;给出了可变移位函数的循环概率表达式,并证明了对于任意非零的移位参数其最大循环概率均相同。由上述分析结果可知,NORX算法中非线性组件的移位参数取1时达到了最佳的非线性逼近和循环性质。该结果可应用于NORX算法的安全性分析中,同时也能为设计类似算法提供理论指导。  相似文献   

19.
We consider the two‐machine open shop scheduling problem in which the jobs are brought to the system by a single transporter and moved between the processing machines by the same transporter. The purpose is to split the jobs into batches and to find the sequence of moves of the transporter so that the time by which the completed jobs are collected together on board the transporter is minimal. We present a ‐approximation algorithm. © 2008 Wiley Periodicals, Inc. Naval Research Logistics 2009  相似文献   

20.
设E是具有一致G -可微范数的实Banach空间 ,D是E的非空闭凸子集 ,T :D→D是非扩张映象 ,F(T)非空。设 {αn} ,{ βn}是 [0 ,1]中满足一定条件的两个序列 ,定义压缩映象St:D→D为 :St(z) =(1-t)x tTz , x ,z∈D , n≥ 1,t∈ (0 ,1) .设zt 是St 的唯一不动点 ,若当t→ 1-时 ,{zt}强收敛于某点z∈F(T) .那么 ,Reich序列 {xn}强收敛于某点z∈F(T) .  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号