首页 | 本学科首页   官方微博 | 高级检索  
文章检索
  按 检索   检索词:      
出版年份:   被引次数:   他引次数: 提示:输入*表示无穷大
  收费全文   374篇
  免费   61篇
  2023年   1篇
  2021年   3篇
  2019年   11篇
  2018年   4篇
  2017年   19篇
  2016年   20篇
  2015年   17篇
  2014年   20篇
  2013年   72篇
  2012年   23篇
  2011年   26篇
  2010年   24篇
  2009年   19篇
  2008年   25篇
  2007年   34篇
  2006年   25篇
  2005年   16篇
  2004年   19篇
  2003年   13篇
  2002年   14篇
  2001年   13篇
  2000年   13篇
  1999年   3篇
  1990年   1篇
排序方式: 共有435条查询结果,搜索用时 15 毫秒
21.
This paper proposes a kurtosis correction (KC) method for constructing the X? and R control charts for symmetrical long‐tailed (leptokurtic) distributions. The control charts are similar to the Shewhart control charts and are very easy to use. The control limits are derived based on the degree of kurtosis estimated from the actual (subgroup) data. It is assumed that the underlying quality characteristic is symmetrically distributed and no other distributional and/or parameter assumptions are made. The control chart constants are tabulated and the performance of these charts is compared with that of the Shewhart control charts. For the case of the logistic distribution, the exact control limits are derived and are compared with the KC method and the Shewhart method. © 2007 Wiley Periodicals, Inc. Naval Research Logistics, 2007  相似文献   
22.
Design and management of complex systems with both integer and continuous decision variables can be guided using mixed‐integer optimization models and analysis. We propose a new mixed‐integer black‐box optimization (MIBO) method, subspace dynamic‐simplex linear interpolation search (SD‐SLIS), for decision making problems in which system performance can only be evaluated with a computer black‐box model. Through a sequence of gradient‐type local searches in subspaces of solution space, SD‐SLIS is particularly efficient for such MIBO problems with scaling issues. We discuss the convergence conditions and properties of SD‐SLIS algorithms for a class of MIBO problems. Under mild conditions, SD‐SLIS is proved to converge to a stationary solution asymptotically. We apply SD‐SLIS to six example problems including two MIBO problems associated with petroleum field development projects. The algorithm performance of SD‐SLIS is compared with that of a state‐of‐the‐art direct‐search method, NOMAD, and that of a full space simplex interpolation search, Full‐SLIS. The numerical results suggest that SD‐SLIS solves the example problems efficiently and outperforms the compared methods for most of the example cases. © 2017 Wiley Periodicals, Inc. Naval Research Logistics 64: 305–322, 2017  相似文献   
23.
Under quasi‐hyperbolic discounting, the valuation of a payoff falls relatively rapidly for earlier delay periods, but then falls more slowly for longer delay periods. When the salespersons with quasi‐hyperbolic discounting consider the product sale problem, they would exert less effort than their early plan, thus resulting in losses of future profit. We propose a winner‐takes‐all competition to alleviate the above time inconsistent behaviors of the salespersons, and allow the company to maximize its revenue by choosing an optimal bonus. To evaluate the effects of the competition scheme, we define the group time inconsistency degree of the salespersons, which measures the consequence of time inconsistent behaviors, and two welfare measures, the group welfare of the salespersons and the company revenue. We show that the competition always improves the group welfare and the company revenue as long as the company chooses to run the competition in the first place. However, the effect on group time inconsistency degree is mixed. When the optimal bonus is moderate (extreme high), the competition motivates (over‐motivates) the salesperson to work hard, thus alleviates (worsens) the time inconsistent behaviors. © 2017 Wiley Periodicals, Inc. Naval Research Logistics 64: 357–372, 2017  相似文献   
24.
We study a setting with a single type of resource and with several players, each associated with a single resource (of this type). Unavailability of these resources comes unexpectedly and with player‐specific costs. Players can cooperate by reallocating the available resources to the ones that need the resources most and let those who suffer the least absorb all the costs. We address the cost savings allocation problem with concepts of cooperative game theory. In particular, we formulate a probabilistic resource pooling game and study them on various properties. We show that these games are not necessarily convex, do have non‐empty cores, and are totally balanced. The latter two are shown via an interesting relationship with Böhm‐Bawerk horse market games. Next, we present an intuitive class of allocation rules for which the resulting allocations are core members and study an allocation rule within this class of allocation rules with an appealing fairness property. Finally, we show that our results can be applied to a spare parts pooling situation.  相似文献   
25.
We consider the problem of scheduling a set of n jobs on a single batch machine, where several jobs can be processed simultaneously. Each job j has a processing time pj and a size sj. All jobs are available for processing at time 0. The batch machine has a capacity D. Several jobs can be batched together and processed simultaneously, provided that the total size of the jobs in the batch does not exceed D. The processing time of a batch is the largest processing time among all jobs in the batch. There is a single vehicle available for delivery of the finished products to the customer, and the vehicle has capacity K. We assume that K = rD, where and r is an integer. The travel time of the vehicle is T; that is, T is the time from the manufacturer to the customer. Our goal is to find a schedule of the jobs and a delivery plan so that the service span is minimized, where the service span is the time that the last job is delivered to the customer. We show that if the jobs have identical sizes, then we can find a schedule and delivery plan in time such that the service span is minimum. If the jobs have identical processing times, then we can find a schedule and delivery plan in time such that the service span is asymptotically at most 11/9 times the optimal service span. When the jobs have arbitrary processing times and arbitrary sizes, then we can find a schedule and delivery plan in time such that the service span is asymptotically at most twice the optimal service span. We also derive upper bounds of the absolute worst‐case ratios in both cases. © 2015 Wiley Periodicals, Inc. Naval Research Logistics 62: 470–482, 2015  相似文献   
26.
We consider a partially observable degrading system subject to condition monitoring and random failure. The system's condition is categorized into one of three states: a healthy state, a warning state, and a failure state. Only the failure state is observable. While the system is operational, vector data that is stochastically related to the system state is obtained through condition monitoring at regular sampling epochs. The state process evolution follows a hidden semi‐Markov model (HSMM) and Erlang distribution is used for modeling the system's sojourn time in each of its operational states. The Expectation‐maximization (EM) algorithm is applied to estimate the state and observation parameters of the HSMM. Explicit formulas for several important quantities for the system residual life estimation such as the conditional reliability function and the mean residual life are derived in terms of the posterior probability that the system is in the warning state. Numerical examples are presented to demonstrate the applicability of the estimation procedure and failure prediction method. A comparison results with hidden Markov modeling are provided to illustrate the effectiveness of the proposed model. © 2015 Wiley Periodicals, Inc. Naval Research Logistics 62: 190–205, 2015  相似文献   
27.
描述了一种双层Powerlink网络的Powerlink网关,用于解决不同层次实时以太网总线之间数据转换以及不同网络之间周期同步的问题。其主要是解决了两层实时Powerlink网络通信时的周期不同步问题,通过使用这一同步机制使下层Powerlink网络在接入上层Powerlink网络时能够同步于上层网络,使每一个接入在同一上层网络的下层网络的动作实际都与上层网络保持同步,从而确保双层网络数据交互的正常进行。  相似文献   
28.
概述了求取Duffing系统阈值的3种传统方法,分析优缺点,最终提出一种新的求取混沌阈值的定量方法。这种方法能充分反映周期序列的振荡特征,因此,定义为周期特征量法。将该特征量作为混沌阈值可以明显区别混沌序列和周期序列,由此可以用于判断Duffing系统的输出状态,是一种优于其他方法的混沌判决。最后,仿真验证了该方法的可行性并应用于检测弱周期信号的有无及其幅值。  相似文献   
29.
文章梳理归纳了2005—2013年间国内在少数民族学生自主学习的研究成果。对收集到的68篇相关文献从研究概况、研究内容、研究方法、研究对象几个方面进行了分析,并依据主要的研究内容和方法将本领域研究大体分为两个阶段:起步阶段(2005-2008)和发展阶段(2009-2013)。通过分析发现目前仍存在数量较少、层次低、重复研究多、研究深度与广度不够等不足。  相似文献   
30.
In scheduling problems with two competing agents, each one of the agents has his own set of jobs to be processed and his own objective function, and both share a common processor. In the single‐machine problem studied in this article, the goal is to find a joint schedule that minimizes the total deviation of the job completion times of the first agent from a common due‐date, subject to an upper bound on the maximum deviation of job completion times of the second agent. The problem is shown to be NP‐hard even for a nonrestrictive due‐date, and a pseudopolynomial dynamic program is introduced and tested numerically. For the case of a restrictive due‐date (a sufficiently small due‐date that may restrict the number of early jobs), a faster pseudopolynomial dynamic program is presented. We also study the multiagent case, which is proved to be strongly NP‐hard. A simple heuristic for this case is introduced, which is tested numerically against a lower bound, obtained by extending the dynamic programming algorithm. © 2013 Wiley Periodicals, Inc. Naval Research Logistics 61: 1–16, 2014  相似文献   
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号