全文获取类型
收费全文 | 234篇 |
免费 | 73篇 |
国内免费 | 9篇 |
出版年
2024年 | 1篇 |
2023年 | 2篇 |
2022年 | 3篇 |
2021年 | 3篇 |
2020年 | 6篇 |
2019年 | 5篇 |
2018年 | 2篇 |
2017年 | 15篇 |
2016年 | 14篇 |
2015年 | 16篇 |
2014年 | 19篇 |
2013年 | 18篇 |
2012年 | 10篇 |
2011年 | 24篇 |
2010年 | 18篇 |
2009年 | 17篇 |
2008年 | 18篇 |
2007年 | 14篇 |
2006年 | 12篇 |
2005年 | 20篇 |
2004年 | 14篇 |
2003年 | 8篇 |
2002年 | 12篇 |
2001年 | 20篇 |
2000年 | 4篇 |
1999年 | 3篇 |
1998年 | 5篇 |
1997年 | 3篇 |
1996年 | 3篇 |
1995年 | 2篇 |
1994年 | 1篇 |
1993年 | 1篇 |
1992年 | 2篇 |
1990年 | 1篇 |
排序方式: 共有316条查询结果,搜索用时 709 毫秒
31.
This paper examines scheduling problems in which the setup phase of each operation needs to be attended by a single server, common for all jobs and different from the processing machines. The objective in each situation is to minimize the makespan. For the processing system consisting of two parallel dedicated machines we prove that the problem of finding an optimal schedule is N P‐hard in the strong sense even if all setup times are equal or if all processing times are equal. For the case of m parallel dedicated machines, a simple greedy algorithm is shown to create a schedule with the makespan that is at most twice the optimum value. For the two machine case, an improved heuristic guarantees a tight worst‐case ratio of 3/2. We also describe several polynomially solvable cases of the later problem. The two‐machine flow shop and the open shop problems with a single server are also shown to be N P‐hard in the strong sense. However, we reduce the two‐machine flow shop no‐wait problem with a single server to the Gilmore—Gomory traveling salesman problem and solve it in polynomial time. © 2000 John Wiley & Sons, Inc. Naval Research Logistics 47: 304–328, 2000 相似文献
32.
In this paper we consider the discrete time/resource trade-off problem in project networks. Given a project network consisting of nodes (activities) and arcs (technological precedence relations), in which the duration of the activities is a discrete, nonincreasing function of the amount of a single renewable resource committed to it, the discrete time/resource trade-off problem minimizes the project makespan subject to precedence constraints and a single renewable resource constraint. For each activity, a work content is specified such that all execution modes (duration/resource requirement pairs) for performing the activity are allowed as long as the product of the duration and the resource requirement is at least as large as the specified work content. We present a tabu search procedure which is based on a decomposition of the problem into a mode assignment phase and a resource-constrained project scheduling phase with fixed mode assignments. Extensive computational experience, including a comparison with other local search methods, is reported. © 1998 John Wiley & Sons, Inc. Naval Research Logistics 45: 553–578, 1998 相似文献
33.
介绍了迫弹电子时间引信控制系统的电路组成、工作原理及其功能,并以PIC16F873A型单片机作为控制器核心,对引信的工作过程进行控制,提高了引信的安全性和可靠性。 相似文献
34.
基于多媒体辅助的高等数学教学模式探究 总被引:2,自引:0,他引:2
在对高等数学教学模式构建的理论基础和价值取向分析的基础上,确立了"双主-双线"的教学模式:即在高等数学教学中,发挥教师主要导向作用,体现学生自主学习的主体地位,以师生共同探究、学生自主建构为主线,以现代多媒体和传统媒体的灵活运用为辅线的教学模式.并以此为基础陈述了模式的实施步骤及遵循的原则. 相似文献
35.
针对超空泡航行体轴向受力特点,建立超空泡航行体双层壳结构有限元模型,对结构动力稳定性进行分析.数值计算表明,当壳间实肋板厚度增大或环向肋骨数量和尺寸增加时,动力失稳区域整体下移,不稳定激发频率下降,失稳区域宽度减小幅度较小;当壳间间距减小或纵向肋骨数量和尺寸增加时,双层壳结构动力不稳定激发频率上升,动力失稳区域宽度较大... 相似文献
36.
影响因素难以量化是再制造发动机抽样方案选择过程中的难点,不可避免地给检验人员带来了主观性和片面性的问题。提出了应用模糊综合评价方法的解决方案,建立了再制造发动机抽样方案综合评价指标体系,详细阐述了综合评价方法的算法步骤,最后以某再制造发动机抽样方案的决策为例进行了实例应用。模糊综合评价方法解决了再制造发动机抽样方案选择中所遇到的问题,可为检验人员选择合理的抽样方案提供决策支持。 相似文献
37.
在推导罗兰C双台链交叉定位算法基础上,根据试验得到的时差测量结果进行了单台链双曲线定位、非时基交叉圆定位以及双台链交叉定位算法比较.结果表明:测量点几何因子GDOP较好时,单台链双曲线定位与交叉圆定位方法的定位结果基本相同,而GDOP较差时,交叉圆定位方法的定位结果明显优于单台链双曲线定位算法的定位结果,但两种情况下的... 相似文献
38.
39.
40.