首页 | 本学科首页   官方微博 | 高级检索  
文章检索
  按 检索   检索词:      
出版年份:   被引次数:   他引次数: 提示:输入*表示无穷大
  收费全文   14篇
  免费   0篇
  2020年   1篇
  2016年   1篇
  2002年   1篇
  2001年   1篇
  1986年   3篇
  1984年   1篇
  1983年   1篇
  1982年   1篇
  1981年   1篇
  1980年   2篇
  1976年   1篇
排序方式: 共有14条查询结果,搜索用时 15 毫秒
1.
This paper analyzes the Smith-heuristic for the single-machine scheduling problem where the objective is to minimize the total weighted completion time subject to the constraint that the tradiness for any job does not exceed a prespecified maximum allowable tardiness. We identify several cases of this problem for which the Smith-heuristic is guaranteed to lead to optimal solutions. We also provide a worst-case analysis of the Smith-heuristic; the analysis shows that the fractional increase in the objective function value for the Smith-heuristic from the optimal solution is unbounded in the worst case.  相似文献   
2.
This article considers the production planning problem of a shop which can produce in either one shift or two shifts. Setup cost is charged whenever there is an increase in the production rate from one period to the next. Efficient planning horizon procedures have been developed for this model. A numerical example has been included to illustrate the planning horizon results.  相似文献   
3.
This paper develops a forward algorithm and planning horizon procedures for an important machine replacement model where it is assumed that the technological environment is improving over time and that the machine-in-use can be replaced by any of the several different kinds of machines available at that time. The set of replacement alternatives may include (i) new machines with different types of technologies such as labor- and capital- intensive, (ii) used machines, (iii) repairs and/or improvements which affect the performance characteristics of the existing machine, and so forth. The forward dynamic programming algorithm in the paper can be used to solve a finite horizon problem. The planning horizon results give a procedure to identify the forecast horizon T such that the optimal replacement decision for the first machine based on the forecast of machine technology until period T remains optimal for any problem with horizon longer than T and, for that matter, for the infinite horizon problem. A flow chart and a numerical example have been included to illustrate the algorithm.  相似文献   
4.
This note consists of developing a method for enforcing additional constraints to linear fractional programs and showing its usefulness in solving integer linear fractional programs.  相似文献   
5.
This paper considers a finite horizon parallel machine replacement problem where a fixed number of machines is in operation at all times. The operating cost for a machine goes up as the machine gets older. An older machine may have to be replaced by a new one when its operating cost becomes too high. There is a fixed order cost associated with the purchase of new machines. Machine purchase prices and salvage values may depend on the period in which they were purchased. The objective is to find a replacement plan that minimizes the total discounted cost over the problem horizon. We believe that the costs in our model are more commonly observed in practice than those previously used in the literature. The paper develops properties of optimal solutions and an efficient forward‐time algorithm to find an optimal replacement plan. A dominance property is developed that further limits the options to be considered, and a simple forecast horizon result is also presented. Future research possibilities are mentioned. © 2002 Wiley Periodicals, Inc. Naval Research Logistics 49: 275–287, 2002; Published online in Wiley InterScience (http://www.interscience.wiley.com). DOI 10.1002/nav.10012  相似文献   
6.
This paper investigates the problem of determining the optimal location of plants, and their respective production and distribution levels, in order to meet demand at a finite number of centers. The possible locations of plants are restricted to a finite set of sites, and the demands are allowed to be random. The cost structure of operating a plant is dependent on its location and is assumed to be a piecewise linear function of the production level, though not necessarily concave or convex. The paper is organized in three parts. In the first part, a branch and bound procedure for the general piecewise linear cost problem is presented, assuming that the demand is known. In the second part, a solution procedure is presented for the case when the demand is random, assuming a linear cost of production. Finally, in the third part, a solution procedure is presented for the general problem utilizing the results of the earlier parts. Certain extensions, such as capacity expansion or reduction at existing plants, and geopolitical configuration constraints can be easily incorporated within this framework.  相似文献   
7.
8.
This article considers the dynamic lot sizing problem when there is learning and forgetting in setups. Learning in setups takes place with repetition when additional setups are made and forgetting takes place when there is a break between two successive setups. We allow the amount forgotten over a break to depend both on the length of the break and the amount of learning at the beginning of the break. The learning and forgetting functions we use are realistic. We present several analytical results and use these in developing computationally efficient algorithms for solving the problem. Some decision/forecast horizon results are also developed, and finally we present managerial insights based on our computational results. © 2016 Wiley Periodicals, Inc. Naval Research Logistics 63: 93–108, 2016  相似文献   
9.
Job shop scheduling with a bank of machines in parallel is important from both theoretical and practical points of view. Herein we focus on the scheduling problem of minimizing the makespan in a flexible two-center job shop. The first center consists of one machine and the second has k parallel machines. An easy-to-perform approximate algorithm for minimizing the makespan with one-unit-time operations in the first center and k-unit-time operations in the second center is proposed. The algorithm has the absolute worst-case error bound of k − 1 , and thus for k = 1 it is optimal. Importantly, it runs in linear time and its error bound is independent of the number of jobs to be processed. Moreover, the algorithm can be modified to give an optimal schedule for k = 2 .  相似文献   
10.
This paper provides a method for solving linear fractional interval programming problems in integers with the help of a branch and bound technique.  相似文献   
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号