首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 962 毫秒
1.
In this paper we consider the capacitated multi‐facility Weber problem with the Euclidean, squared Euclidean, and ?p‐distances. This problem is concerned with locating m capacitated facilities in the Euclidean plane to satisfy the demand of n customers with the minimum total transportation cost. The demand and location of each customer are known a priori and the transportation cost between customers and facilities is proportional to the distance between them. We first present a mixed integer linear programming approximation of the problem. We then propose new heuristic solution methods based on this approximation. Computational results on benchmark instances indicate that the new methods are both accurate and efficient. © 2006 Wiley Periodicals, Inc. Naval Research Logistics 2006  相似文献   

2.
Consider a monopolist who sells a single product to time‐sensitive customers located on a line segment. Customers send their orders to the nearest distribution facility, where the firm processes (customizes) these orders on a first‐come, first‐served basis before delivering them. We examine how the monopolist would locate its facilities, set their capacities, and price the product offered to maximize profits. We explicitly model customers' waiting costs due to both shipping lead times and queueing congestion delays and allow each customer to self‐select whether she orders or not, based on her reservation price. We first analyze the single‐facility problem and derive a number of interesting insights regarding the optimal solution. We show, for instance, that the optimal capacity relates to the square root of the customer volume and that the optimal price relates additively to the capacity and transportation delay costs. We also compare our solutions to a similar problem without congestion effects. We then utilize our single‐facility results to treat the multi‐facility problem. We characterize the optimal policy for serving a fixed interval of customers from multiple facilities when customers are uniformly distributed on a line. We also show how as the length of the customer interval increases, the optimal policy relates to the single‐facility problem of maximizing expected profit per unit distance. © 2006 Wiley Periodicals, Inc. Naval Research Logistics, 2007  相似文献   

3.
The dynamics of the environment in which supply chains evolve requires that companies frequently redesign their logistics distribution networks. In this paper we address a multiperiod single‐sourcing problem that can be used as a strategic tool for evaluating the costs of logistics network designs in a dynamic environment. The distribution networks that we consider consist of a set of production and storage facilities, and a set of customers who do not hold inventories. The facilities face production capacities, and each customer's demand needs to be delivered by a single facility in each period. We deal with the assignment of customers to facilities, as well as the location, timing, and size of inventories. In addition, to mitigate start and end‐of‐study effects, we view the planning period as a typical future one, which will repeat itself. This leads to a cyclic model, in which starting and ending inventories are equal. Based on an assignment formulation of the problem, we propose a greedy heuristic, and prove that this greedy heuristic is asymptotically feasible and optimal in a probabilistic sense. We illustrate the behavior of the greedy heuristic, as well as some improvements where the greedy heuristic is used as the starting point of a local interchange procedure, on a set of randomly generated test problems. © 2003 Wiley Periodicals, Inc. Naval Research Logistics 50: 412–437, 2003  相似文献   

4.
We study the problem of designing a two‐echelon spare parts inventory system consisting of a central plant and a number of service centers each serving a set of customers with stochastic demand. Processing and storage capacities at both levels of facilities are limited. The manufacturing process is modeled as a queuing system at the plant. The goal is to optimize the base‐stock levels at both echelons, the location of service centers, and the allocation of customers to centers simultaneously, subject to service constraints. A mixed integer nonlinear programming model (MINLP) is formulated to minimize the total expected cost of the system. The problem is NP‐hard and a Lagrangian heuristic is proposed. We present computational results and discuss the trade‐off between cost and service. © 2009 Wiley Periodicals, Inc. Naval Research Logistics 2009  相似文献   

5.
This paper develops a new model for allocating demand from retailers (or customers) to a set of production/storage facilities. A producer manufactures a product in multiple production facilities, and faces demand from a set of retailers. The objective is to decide which of the production facilities should satisfy each retailer's demand, in order minimize total production, inventory holding, and assignment costs (where the latter may include, for instance, variable production costs and transportation costs). Demand occurs continuously in time at a deterministic rate at each retailer, while each production facility faces fixed‐charge production costs and linear holding costs. We first consider an uncapacitated model, which we generalize to allow for production or storage capacities. We then explore situations with capacity expansion opportunities. Our solution approach employs a column generation procedure, as well as greedy and local improvement heuristic approaches. A broad class of randomly generated test problems demonstrates that these heuristics find high quality solutions for this large‐scale cross‐facility planning problem using a modest amount of computation time. © 2005 Wiley Periodicals, Inc. Naval Research Logistics, 2005.  相似文献   

6.
This paper presents several models for the location of facilities subject to congestion. Motivated by applications to locating servers in communication networks and automatic teller machines in bank systems, these models are developed for situations in which immobile service facilities are congested by stochastic demand originating from nearby customer locations. We consider this problem from three different perspectives, that of (i) the service provider (wishing to limit costs of setup and operating servers), (ii) the customers (wishing to limit costs of accessing and waiting for service), and (iii) both the service provider and the customers combined. In all cases, a minimum level of service quality is ensured by imposing an upper bound on the server utilization rate at a service facility. The latter two perspectives also incorporate queueing delay costs as part of the objective. Some cases are amenable to an optimal solution. For those cases that are more challenging, we either propose heuristic procedures to find good solutions or establish equivalence to other well‐studied facility location problems. © 2003 Wiley Periodicals, Inc. Naval Research Logistics, 2004.  相似文献   

7.
In this paper we propose and solve a competitive facility location model when demand is continuously distributed in an area and each facility attracts customers within a given distance. This distance is a measure of the facility's attractiveness level which may be different for different facilities. The market share captured by each facility is calculated by two numerical integration methods. These approaches can be used for evaluating functional values in other operations research models as well. The single facility location problem is optimally solved by the big triangle small triangle global optimization algorithm and the multiple facility problem is heuristically solved by the Nelder‐Mead algorithm. Extensive computational experiments demonstrate the effectiveness of the solution approaches.  相似文献   

8.
We consider price and capacity decisions for a profit‐maximizing service provider in a single server queueing system, in which customers are boundedly rational and decide whether to join the service according to a multinomial logit model. We find two potential price‐capacity pair solutions for the first‐order condition of the profit‐maximizing problem. Profit is maximized at the solution with a larger capacity, but minimized at the smaller one. We then consider a dynamically adjusting capacity system to mimic a real‐life situation and find that the maximum can be reached only when the initial service rate is larger than a certain threshold; otherwise, the system capacity and demand shrink to zero. We also find that a higher level of customers’ bounded rationality does not necessarily benefit a firm, nor does it necessarily allow service to be sustained. We extend our analysis to a setting in which customers’ bounded rationality level is related to historical demand and find that such a setting makes service easier to sustain. Finally we find that bounded rationality always harms social welfare.  相似文献   

9.
This paper considers the problem of locating one or more new facilities on a continuous plane, where the destinations or customers, and even the facilities, may be represented by areas and not points. The objective is to locate the facilities in order to minimize a sum of transportation costs. What is new in this study is that the relevant distances are the distances from the closest point in the facility to the closest point in the demand areas. © 2000 John Wiley & Sons, Inc. Naval Research Logistics 47: 77–84, 2000  相似文献   

10.
This paper studies a scheduling problem arising in a beef distribution system where pallets of various types of beef products in the warehouse are first depalletized and then individual cases are loaded via conveyors to the trucks which deliver beef products to various customers. Given each customer's demand for each type of beef, the problem is to find a depalletizing and truck loading schedule that fills all the demands at a minimum total cost. We first show that the general problem where there are multiple trucks and each truck covers multiple customers is strongly NP‐hard. Then we propose polynomial‐time algorithms for the case where there are multiple trucks, each covering only one customer, and the case where there is only one truck covering multiple customers. We also develop an optimal dynamic programming algorithm and a heuristic for solving the general problem. By comparing to the optimal solutions generated by the dynamic programming algorithm, the heuristic is shown to be capable of generating near optimal solutions quickly. © 2003 Wiley Periodicals, Inc. Naval Research Logistics, 2003  相似文献   

11.
We consider a supplier with finite production capacity and stochastic production times. Customers provide advance demand information (ADI) to the supplier by announcing orders ahead of their due dates. However, this information is not perfect, and customers may request an order be fulfilled prior to or later than the expected due date. Customers update the status of their orders, but the time between consecutive updates is random. We formulate the production‐control problem as a continuous‐time Markov decision process and prove there is an optimal state‐dependent base‐stock policy, where the base‐stock levels depend upon the numbers of orders at various stages of update. In addition, we derive results on the sensitivity of the state‐dependent base‐stock levels to the number of orders in each stage of update. In a numerical study, we examine the benefit of ADI, and find that it is most valuable to the supplier when the time between updates is moderate. We also consider the impact of holding and backorder costs, numbers of updates, and the fraction of customers that provide ADI. In addition, we find that while ADI is always beneficial to the supplier, this may not be the case for the customers who provide the ADI. © 2011 Wiley Periodicals, Inc. Naval Research Logistics, 2011  相似文献   

12.
This article concerns scheduling policies in a surveillance system aimed at detecting a terrorist attack in time. Terrorist suspects arriving at a public area are subject to continuous monitoring, while a surveillance team takes their biometric signatures and compares them with records stored in a terrorist database. Because the surveillance team can screen only one terrorist suspect at a time, the team faces a dynamic scheduling problem among the suspects. We build a model consisting of an M/G/1 queue with two types of customers—red and white—to study this problem. Both types of customers are impatient but the reneging time distributions are different. The server only receives a reward by serving a red customer and can use the time a customer has spent in the queue to deduce its likely type. In a few special cases, a simple service rule—such as first‐come‐first‐serve—is optimal. We explain why the problem is in general difficult and we develop a heuristic policy motivated by the fact that terrorist attacks tend to be rare events. © 2009 Wiley Periodicals, Inc. Naval Research Logistics, 2009  相似文献   

13.
In this paper we study strategies for better utilizing the network capacity of Internet Service Providers (ISPs) when they are faced with stochastic and dynamic arrivals and departures of customers attempting to log‐on or log‐off, respectively. We propose a method in which, depending on the number of modems available, and the arrival and departure rates of different classes of customers, a decision is made whether to accept or reject a log‐on request. The problem is formulated as a continuous time Markov Decision Process for which optimal policies can be readily derived using techniques such as value iteration. This decision maximizes the discounted value to ISPs while improving service levels for higher class customers. The methodology is similar to yield management techniques successfully used in airlines, hotels, etc. However, there are sufficient differences, such as no predefined time horizon or reservations, that make this model interesting to pursue and challenging. This work was completed in collaboration with one of the largest ISPs in Connecticut. The problem is topical, and approaches such as those proposed here are sought by users. © 2001 John Wiley & Sons, Inc., Naval Research Logistics 48:348–362, 2001  相似文献   

14.
We study a stochastic scenario‐based facility location problem arising in situations when facilities must first be located, then activated in a particular scenario before they can be used to satisfy scenario demands. Unlike typical facility location problems, fixed charges arise in the initial location of the facilities, and then in the activation of located facilities. The first‐stage variables in our problem are the traditional binary facility‐location variables, whereas the second‐stage variables involve a mix of binary facility‐activation variables and continuous flow variables. Benders decomposition is not applicable for these problems due to the presence of the second‐stage integer activation variables. Instead, we derive cutting planes tailored to the problem under investigation from recourse solution data. These cutting planes are derived by solving a series of specialized shortest path problems based on a modified residual graph from the recourse solution, and are tighter than the general cuts established by Laporte and Louveaux for two‐stage binary programming problems. We demonstrate the computational efficacy of our approach on a variety of randomly generated test problems. © 2010 Wiley Periodicals, Inc. Naval Research Logistics, 2010  相似文献   

15.
We investigate the problem of scheduling a fleet of vehicles to visit the customers located on a path to minimize some regular function of the visiting times of the customers. For the single‐vehicle problem, we prove that it is pseudopolynomially solvable for any minsum objective and polynomially solvable for any minmax objective. Also, we establish the NP‐hardness of minimizing the weighted number of tardy customers and the total weighted tardiness, and present polynomial algorithms for their special cases with a common due date. For the multivehicle problem involving n customers, we show that an optimal solution can be found by solving or O(n) single‐vehicle problems. © 2013 Wiley Periodicals, Inc. Naval Research Logistics 61: 34–43, 2014  相似文献   

16.
The network redesign problem attempts to design an optimal network that serves both existing and new demands. In addition to using spare capacity on existing network facilities and deploying new facilities, the model allows for rearrangement of existing demand units. As rearrangements mean reassigning existing demand units, at a cost, to different facilities, they may lead to disconnecting of uneconomical existing facilities, resulting in significant savings. The model is applied to an access network, where the demands from many sources need to be routed to a single destination, using either low‐capacity or high‐capacity facilities. Demand from any location can be routed to the destination either directly or through one other demand location. Low‐capacity facilities can be used between any pair of locations, whereas high‐capacity facilities are used only between demand locations and the destination. We present a new modeling approach to such problems. The model is described as a network flow problem, where each demand location is represented by multiple nodes associated with demands, low‐capacity and high‐capacity facilities, and rearrangements. Each link has a capacity and a cost per unit flow parameters. Some of the links also have a fixed‐charge cost. The resulting network flow model is formulated as a mixed integer program, and solved by a heuristic and a commercially available software. © 1999 John Wiley & Sons, Inc. Naval Research Logistics 46: 487–506, 1999  相似文献   

17.
We consider a make‐to‐order production–distribution system with one supplier and one or more customers. A set of orders with due dates needs to be processed by the supplier and delivered to the customers upon completion. The supplier can process one order at a time without preemption. Each customer is at a distinct location and only orders from the same customer can be batched together for delivery. Each delivery shipment has a capacity limit and incurs a distribution cost. The problem is to find a joint schedule of order processing at the supplier and order delivery from the supplier to the customers that optimizes an objective function involving the maximum delivery tardiness and the total distribution cost. We first study the solvability of various cases of the problem by either providing an efficient algorithm or proving the intractability of the problem. We then develop a fast heuristic for the general problem. We show that the heuristic is asymptotically optimal as the number of orders goes to infinity. We also evaluate the performance of the heuristic computationally by using lower bounds obtained by a column generation approach. Our results indicate that the heuristic is capable of generating near optimal solutions quickly. Finally, we study the value of production–distribution integration by comparing our integrated approach with two sequential approaches where scheduling decisions for order processing are made first, followed by order delivery decisions, with no or only partial integration of the two decisions. We show that in many cases, the integrated approach performs significantly better than the sequential approaches. © 2005 Wiley Periodicals, Inc. Naval Research Logistics, 2005  相似文献   

18.
In this article we explore how two competing firms locate and set capacities to serve time‐sensitive customers. Because customers are time‐sensitive, they may decline to place an order from either competitor if their expected waiting time is large. We develop a two‐stage game where firms set capacities and then locations, and show that three types of subgame perfect equilibria are possible: local monopoly (in which each customer is served by a single firm, but some customers may be left unserved), constrained local monopoly (in which firms serve the entire interval of customers but do not compete with each other), and constrained competition (in which firms also serve the entire interval of customers, but now compete for some customers). We perform a comparative statics analysis to illustrate differences in the equilibrium behavior of a duopolist and a coordinated monopolist. © 2008 Wiley Periodicals, Inc. Naval Research Logistics, 2008  相似文献   

19.
In this article, we study a queueing system serving multiple classes of customers. Each class has a finite‐calling population. The customers are served according to the preemptive‐resume priority policy. We assume general distributions for the service times. For each priority class, we derive the steady‐state system size distributions at departure/arrival and arbitrary time epochs. We introduce the residual augmented process completion times conditioned on the number of customers in the system to obtain the system time distribution. We then extend the model by assuming that the server is subject to operation‐independent failures upon which a repair process with random duration starts immediately. We also demonstrate how setup times, which may be required before resuming interrupted service or picking up a new customer, can be incorporated in the model. © 2013 Wiley Periodicals, Inc. Naval Research Logistics, 2013  相似文献   

20.
Having a robustly designed supply chain network is one of the most effective ways to hedge against network disruptions because contingency plans in the event of a disruption are often significantly limited. In this article, we study the facility reliability problem: how to design a reliable supply chain network in the presence of random facility disruptions with the option of hardening selected facilities. We consider a facility location problem incorporating two types of facilities, one that is unreliable and another that is reliable (which is not subject to disruption, but is more expensive). We formulate this as a mixed integer programming model and develop a Lagrangian Relaxation‐based solution algorithm. We derive structural properties of the problem and show that for some values of the disruption probability, the problem reduces to the classical uncapacitated fixed charge location problem. In addition, we show that the proposed solution algorithm is not only capable of solving large‐scale problems, but is also computationally effective. © 2009 Wiley Periodicals, Inc. Naval Research Logistics, 2010  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号