In this paper we consider the discrete time/resource trade-off problem in project networks. Given a project network consisting of nodes (activities) and arcs (technological precedence relations), in which the duration of the activities is a discrete, nonincreasing function of the amount of a single renewable resource committed to it, the discrete time/resource trade-off problem minimizes the project makespan subject to precedence constraints and a single renewable resource constraint. For each activity, a work content is specified such that all execution modes (duration/resource requirement pairs) for performing the activity are allowed as long as the product of the duration and the resource requirement is at least as large as the specified work content. We present a tabu search procedure which is based on a decomposition of the problem into a mode assignment phase and a resource-constrained project scheduling phase with fixed mode assignments. Extensive computational experience, including a comparison with other local search methods, is reported. © 1998 John Wiley & Sons, Inc. Naval Research Logistics 45: 553–578, 1998  相似文献   

2.
We study the problem of multimode scheduling tasks on dedicated processors, with the objective of minimizing the maximum completion time. Each task can be undertaken in one among a set of predefined alternative modes, where each mode specifies a required set of dedicated processors and a processing time. At any time each processor can be used by a single task at most. General precedence constraints exist among tasks, and task preemption is not allowed. The problem consists of assigning a mode and a starting time to each task, respecting processor and precedence constraints, to minimize the time required to complete all tasks. The problem is NP-hard in several particular cases. In previous works, we studied algorithms in which a solution was obtained by means of an iterative procedure that combines mode assignment and sequencing phases separately. In this paper, we present some new heuristics where the decision on the mode assignment is taken on the basis of a partial schedule. Then, for each task, the mode selection and the starting time are chosen simultaneously considering the current processor usage. Different lower bounds are derived from a mathematical formulation of the problem and from a graph representation of a particular relaxed version of the problem. Heuristic solutions and lower bounds are evaluated on randomly generated test problems. © 1999 John Wiley & Sons, Inc. Naval Research Logistics 46: 893–911, 1999  相似文献   

3.
The problem of determining the optimal inspection epoch is studied for reliability systems in which N components operate in parallel. Lifetime distribution is arbitrary, but known. The optimization is carried with respect to two cost factors: the cost of inspecting a component and the cost of failure. The inspection epochs are determined so that the expected cost of the whole system per time unit per cycle will be minimized. The optimization process depends in the general case on the whole failure history of the system. This dependence is characterized. The cases of Weibull lifetime distributions are elaborated and illustrated numerically. The characteristics of the optimal inspection intervals are studied theoretically.  相似文献   

4.
In this paper we address the question of deriving deep cuts for nonconvex disjunctive programs. These problems include logical constraints which restrict the variables to at least one of a finite number of constraint sets. Based on the works of Balas. Glover, and Jeroslow, we examine the set of valid inequalities or cuts which one may derive in this context, and defining reasonable criteria to measure depth of a cut we demonstrate how one may obtain the “deepest” cut. The analysis covers the case where each constraint set in the logical statement has only one constraint and is also extended for the case where each of these constraint sets may have more than one constraint.  相似文献   

5.
The first problem considered in this paper is concerned with the assembly of independent components into parallel systems so as to maximize the expected number of systems that perform satisfactorily. Associated with each component is a probability of it performing successfully. It is shown that an optimal assembly is obtained if the reliability of each assembled system can be made equal. If such equality is not attainable, then bounds are given so that the maximum expected number of systems that perform satisfactorily will lie within these stated bounds; the bounds being a function of an arbitrarily chosen assembly. An improvement algorithm is also presented. A second problem treated is concerned with the optimal design of a system. Instead of assembling given units, there is an opportunity to “control” their quality, i.e., the manufacturer is able to fix the probability, p, of a unit performing successfully. However, his resources, are limited so that a constraint is imposed on these probabilities. For (1) series systems, (2) parallel systems, and (3) k out of n systems, results are obtained for finding the optimal p's which maximize the reliability of a single system, and which maximize the expected number of systems that perform satisfactorily out of a total assembly of J systems.  相似文献   

6.
A machine or production system is subject to random failure. Upon failure the system is replaced by a new one, and the process repeats. A cost is associated with each replacement, and an additional cost is incurred at each failure in service. Thus, there is an incentive for a controller to attempt to replace before failure occurs. The problem is to find an optimal control strategy that balances the cost of replacement with the cost of failure and results in a minimum total long-run average cost per unit time. We attack this problem under the cumulative damage model for system failure. In this failure model, shocks occur to the system in accordance with a Poisson process. Each shock causes a random amount of damage or wear and these damages accumulate additively. At any given shock, the system fails with a known probability that depends on the total damage accumulated to date. We assume that the cumulative damage is observable by the controller and that his decisions may be based on its current value. Supposing that the shock failure probability is an increasing function of the cumulative damage, we show that an optimal policy is to replace either upon failure or when this damage first exceeds a critical control level, and we give an equation which implicitly defines the optimal control level in terms of the cost and other system parameters. Also treated are some more general models that allow for income lost during repair time and other extensions.  相似文献   

7.
This article concerns the effect of stochastic time delays in the operation of components upon system reliability for isolated impulse systems, for which component delays have hitherto been treated as deterministic. These are systems, such as automatic protective devices, which remain idle for most of their lives but which are required to respond with the utmost speed to input signals arising at arbitrary isolated time instants. System failure can arise from components failing to operate, or from being too slow to operate so that the systems operation is too slow to meet requirements. During operation components are usually subjected to greater stresses than during idling, so that it is assumed that components are subjected to increased failure tendencies during the time it takes them to perform their functions. The effect of stochastic time delays on the evaluation of systems reliability is considered, and a hierarchy of complexity associated with the physical nature of the delays in series and redundant configurations is exposed. Some simple exponential illustrations are presented.  相似文献   

8.
This paper presents an application of a method for finding the global solution to a problem in integers with a separable objective function of a very general form. This report shows that there is a relationship between an integer problem with a separable nonlinear objective function and many constraints and a series of nonlinear problems with only a single constraint, each of which can be solved sequentially using dynamic programming. The first solution to any of the individual smaller problems that satisfies the original constraints in addition, will be the optimal solution to the multiply-constrained problem.  相似文献   

9.
Models are formulated for determining continuous review (Q, r) policies for a multiitem inventory subject to constraints. The objective function is the minimization of total time-weighted shortages. The constraints apply to inventory investment and reorder workload. The formulations are thus independent of the normal ordering, holding, and shortage costs. Two models are presented, each representing a convex programming problem. Lagrangian techniques are employed with the first, simplified model in which only the reorder points are optimized. In the second model both the reorder points and the reorder quantities are optimized utilizing penalty function methods. An example problem is solved for each model. The final section deals with the implementation of these models in very large inventory systems.  相似文献   

10.
为解决小子样多失效模式系统可靠性模型参数的估计问题,首先应用支持向量积建立小子样条件下各故障模式的规律模型,其次利用模型将各故障模式的故障数据由小子样扩充成大样本,再次采用常规的参数估算方法估算各故障模式的分布参数,最后建立多失效模式系统的可靠性竞争模型。利用所提方法,建立了小子样条件下具有两种失效模式的柴油机汽缸套可靠性竞争模型,计算结果与大样本条件下的故障预测数据吻合度较高,说明了方法的有效性。  相似文献   

11.
This paper considers the problem of finding optimal solutions to a class of separable constrained extremal problems involving nonlinear functionals. The results are proved for rather general situations, but they may be easily stated for the case of search for a stationary object whose a priori location distribution is given by a density function on R, a subset of Euclidean n-space. The functional to be optimized in this case is the probability of detection and the constraint is on the amount of effort to be used Suppose that a search of the above type is conducted in such a manner as to produce the maximum increase in probability of detection for each increment of effort added to the search. Then under very weak assumptions, it is proven that this search will produce an optimal allocation of the total effort involved. Under some additional assumptions, it is shown that any amount of search effort may be allocated in an optimal fashion.  相似文献   

12.
动态系统可靠性分析的新概念   总被引:6,自引:0,他引:6       下载免费PDF全文
传统可靠性分析的概念只能描述静态逻辑关系,不能满足现代复杂动态系统可靠性分析的需要。在给出动态系统状态空间结构和结构函数的基础上,提出失效序列和失效丛的概念描述动态系统的故障模式,这一概念扩展了传统可靠性分析的概念,将割集、蕴含集等作为其在静态情形的特例。给出动态系统部件的概率重要度、结构重要度以及关键重要度的概念,用实例对提出的有关概念进行了说明。  相似文献   

13.
当系统含有屏蔽数据时,在具有随机移走逐步增加型截尾模型下,讨论了部件寿命服从双参数指数分布的串联系统可靠性估计问题。设随机移走系统数服从二项分布,利用极大似然方法,Bayes理论及方法,推导出双参数指数部件参数、系统可靠性函数、失效率函数及移走概率的极大似然估计和Bayes估计。并利用Monte Carlo方法对两种估计结果进行了比较,表明Bayes估计较极大似然估计效果更优。  相似文献   

14.
We consider a system composed of k components, each of which is subject to failure if temperature is above a critical level. The failure of one component causes the failure of the system as a whole (a serially connected system). If zi is the critical temperature of the ith component then z* = min{zi: i = 1,2,…, k} is the critical level of the system. The components may be tested individually at different temperature levels, if the temperature is below the critical level the cost is $1, otherwise the test is destructive and the cost is m > 1 dollars. The purpose of this article is to construct, under a budgetary constraint, an efficient (in a minmax sense) testing procedure which will locate the critical level of the system with maximal accuracy.  相似文献   

15.
The reliability of a serial production line is optimized with respect to the location of a single buffer. The problem was earlier defined and solved by Soyster and Toof for the special case of an even number of machines all having equal probability of failure. In this paper we generalize the results for any number of machines and remove the restriction of identical machine reliabilities. In addition, an analysis of multibuffer systems is presented with a closed form solution for the reliability when both the number of buffers and their capacity is limited. For the general multibuffer system we present an approach for determining system reliability.  相似文献   

16.
We consider a generalization of the well‐known generalized assignment problem (GAP) over discrete time periods encompassed within a finite planning horizon. The resulting model, MultiGAP, addresses the assignment of tasks to agents within each time period, with the attendant single‐period assignment costs and agent‐capacity constraint requirements, in conjunction with transition costs arising between any two consecutive periods in which a task is reassigned to a different agent. As is the case for its single‐period antecedent, MultiGAP offers a robust tool for modeling a wide range of capacity planning problems occurring within supply chain management. We provide two formulations for MultiGAP and establish that the second (alternative) formulation provides a tighter bound. We define a Lagrangian relaxation‐based heuristic as well as a branch‐and‐bound algorithm for MultiGAP. Computational experience with the heuristic and branch‐and‐bound algorithm on over 2500 test problems is reported. The Lagrangian heuristic consistently generates high‐quality and in many cases near‐optimal solutions. The branch‐and‐bound algorithm is also seen to constitute an effective means for solving to optimality MultiGAP problems of reasonable size. © 2012 Wiley Periodicals, Inc. Naval Research Logistics, 2012  相似文献   

17.
In this research, we consider robust simulation optimization with stochastic constraints. In particular, we focus on the ranking and selection problem in which the computing time is sufficient to evaluate all the designs (solutions) under consideration. Given a fixed simulation budget, we aim at maximizing the probability of correct selection (PCS) for the best feasible design, where the objective and constraint measures are assessed by their worst‐case performances. To simplify the complexity of PCS, we develop an approximated probability measure and derive the asymptotic optimality condition (optimality condition as the simulation budget goes to infinity) of the resulting problem. A sequential selection procedure is then designed within the optimal computing budget allocation framework. The high efficiency of the proposed procedure is tested via a number of numerical examples. In addition, we provide some useful insights into the efficiency of a budget allocation procedure.  相似文献   

18.
One way of achieving the increased levels of system reliability and availability demanded by critical computer-based control systems is through the use of fault-tolerant distributed computer systems. This article addresses the problem of allocating a set of m tasks among a set of n processors in a manner that will satisfy various task assignment, system capacity, and task scheduling constraints while balancing the workload across processors. We discuss problem background, problem formulation, and a known heuristic procedure for the problem. A new solution-improving heuristic procedure is introduced, and computational experience with the heuristics is presented. With only a modest increase in the amount of computational effort, the new procedure is demonstrated to improve dramatically solution quality as well as obtain near-optimal solutions to the test problems.  相似文献   

19.
Within a reasonable life‐testing time, how to improve the reliability of highly reliable products is one of the great challenges to today's manufacturers. By using a resolution III experiment together with degradation test, Tseng, Hamada, and Chiao (1995) presented an interesting case study of improving the reliability of fluorescent lamps. However, in conducting such an experiment, they did not address the problem of how to choose the optimal settings of variables, such as sample size, inspection frequency, and termination time for each run, which are influential to the correct identification of significant factors and the experimental cost. Assuming that the product's degradation paths satisfy Wiener processes, this paper proposes a systematic approach to the aforementioned problem. First, an intuitively appealing identification rule is proposed. Next, under the constraints of a minimum probability of correct decision and a maximum probability of incorrect decision of the proposed identification rule, the optimum test plan (including the determinations of inspection frequency, sample size, and termination time for each run) can be obtained by minimizing the total experimental cost. An example is provided to illustrate the proposed method. © 2002 Wiley Periodicals, Inc. Naval Research Logistics 49: 514–526, 2002; Published online in Wiley InterScience (www.interscience.wiley.com). DOI 10.1002/nav.10024  相似文献   

20.
A branch and bound algorithm is developed for a class of allocation problems in which some constraint coefficients depend on the values of certain of the decision variables. Were it not for these dependencies, the problems could be solved by linear programming. The algorithm is developed in terms of a strategic deployment problem in which it is desired to find a least-cost transportation fleet, subject to constraints on men/materiel requirements in the event of certain hypothesized contingencies. Among the transportation vehicles available for selection are aircraft which exhibit the characteristic that the amount of goods deliverable by an aircraft on a particular route in a given time period (called aircraft productivity and measured in kilotons/aircraft/month) depends on the ratio of type 1 to type 2 aircraft used on that particular route. A model is formulated in which these relationships are first approximated by piecewise linear functions. A branch and bound algorithm for solving the resultant nonlinear problem is then presented; the algorithm solves a sequence of linear programming problems. The algorithm is illustrated by a sample problem and comments concerning its practicality are made.  相似文献   