首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 31 毫秒
1.
This paper considers a new class of scheduling problems arising in logistics systems in which two different transportation modes are available at the stage of product delivery. The mode with the shorter transportation time charges a higher cost. Each job ordered by the customer is first processed in the manufacturing facility and then transported to the customer. There is a due date for each job to arrive to the customer. Our approach integrates the machine scheduling problem in the manufacturing stage with the transportation mode selection problem in the delivery stage to achieve the global maximum benefit. In addition to studying the NP‐hard special case in which no tardy job is allowed, we consider in detail the problem when minimizing the sum of the total transportation cost and the total weighted tardiness cost is the objective. We provide a branch and bound algorithm with two different lower bounds. The effectiveness of the two lower bounds is discussed and compared. We also provide a mathematical model that is solvable by CPLEX. Computational results show that our branch and bound algorithm is more efficient than CPLEX. © 2005 Wiley Periodicals, Inc. Naval Research Logistics, 2005  相似文献   

2.
In this article we develop a heuristic procedure for a multiproduct dynamic lot-sizing problem. In this problem a joint setup cost is incurred when at least one product is ordered in a period. In addition to the joint setup cost a separate setup cost for each product ordered is also incurred. The objective is to determine the product lot sizes, over a finite planning horizon, that will minimize the total relevant cost such that the demand in each period for each product is satisfied without backlogging. In this article we present an effective heuristic procedure for this problem. Computational results for the heuristic procedure are also reported. Our computational experience leads us to conclude that the heuristic procedure may be of considerable value as a decision-making aid to production planners in a real-world setting. © 1994 John Wiley & Sons, Inc.  相似文献   

3.
In many decision-making situations, each activity that can be undertaken may have associated with it both a fixed and a variable cost. Recently, we have encountered serveral practical problems in which the fixed cost of undertaking an activity depends upon which other activities are also undertaken. To our knowledge, no existing optimization model can accomodate such a fixed cost structure. To do so, we have therefore developed a new model called the interactive fixed charge linear programming problem (IFCLP). In this paper we present and motivate problem (IFCLP), study some of its characteristics, and present a finite branch and bound algorithm for solving it. We also discuss the main properties of this algorithm.  相似文献   

4.
The replacement or upgrade of productive resources over time is an important decision for a manufacturing organization. The type of technology used in the productive resources determines how effectively the manufacturing operations can support the product and marketing strategy of the organization. Increasing operating costs (cost of maintenance, labor, and depreciation) over time force manufacturing organizations to periodically consider replacement or upgrade of their existing productive resources. We assume that there is a setup cost associated with the replacement of a machine, and that the setup cost is a nonincreasing function of the number of replacements made so far due to learning in setups. The operating cost of a newer machine is assumed to be lower than the operating cost of an older machine in any given period, except perhaps in the first period of operation of the new machine when the cost could be unusually high due to higher initial depreciation. A forward dynamic programming algorithm is developed which can be used to solve finite-horizon problems. We develop procedures to find decision and forecast horizons such that choices made during the decision horizon based only on information over the forecast horizon are also optimal for any longer horizon problem. Thus, we are able to obtain optimal results for what is effectively an infinite-horizon problem while only requiring data over a finite period of time. We present a numerical example to illustrate the decision/forecast horizon procedure, as well as a study of the effects of considering learning in making a series of machine replacement decisions. © 1993 John Wiley & Sons. Inc.  相似文献   

5.
This article considers the Economic Lot Scheduling Problem where setup times and costs can be reduced by an initial investment that is amortized over time. The objective is to determine a multiple-item single facility cyclic schedule to minimize the long run average holding and setup costs plus the amortized investment. We develop a lower bound on the long run average inventory carrying and setup costs as a function of the setup times, and show that this lower bound is increasing concave on the setup times when the out-of-pocket setup costs are zero or proportional to the setup times. We then develop a model that may be helpful in deciding the magnitude and the distribution of a one-time investment in reducing the setup times when the investment is amortized over time. Numerical results based on randomly generated problems, and on Bomberger's ten item problem indicate that significant overall savings are possible for highly utilized facilities. Most of the savings are due to a significant reduction in the long run average holding cost. © 1995 John Wiley & Sons, Inc.  相似文献   

6.
We consider a generalization of the well‐known generalized assignment problem (GAP) over discrete time periods encompassed within a finite planning horizon. The resulting model, MultiGAP, addresses the assignment of tasks to agents within each time period, with the attendant single‐period assignment costs and agent‐capacity constraint requirements, in conjunction with transition costs arising between any two consecutive periods in which a task is reassigned to a different agent. As is the case for its single‐period antecedent, MultiGAP offers a robust tool for modeling a wide range of capacity planning problems occurring within supply chain management. We provide two formulations for MultiGAP and establish that the second (alternative) formulation provides a tighter bound. We define a Lagrangian relaxation‐based heuristic as well as a branch‐and‐bound algorithm for MultiGAP. Computational experience with the heuristic and branch‐and‐bound algorithm on over 2500 test problems is reported. The Lagrangian heuristic consistently generates high‐quality and in many cases near‐optimal solutions. The branch‐and‐bound algorithm is also seen to constitute an effective means for solving to optimality MultiGAP problems of reasonable size. © 2012 Wiley Periodicals, Inc. Naval Research Logistics, 2012  相似文献   

7.
We study unreliable serial production lines with known failure probabilities for each operation. Such a production line consists of a series of stations, existing machines, and optional quality control stations (QCSs). Our aim is to decide on the allocation of the QCSs within the assembly line, so as to maximize the expected profit of the system. In such a problem, the designer has to determine the QCS configuration and the production rate simultaneously. The profit maximization problem is approximated assuming exponentially distributed processing times, Poisson arrival process of jobs into the system, and the existing of holding costs. The novel feature of our model is the incorporation of holding costs that significantly complicated the problem. Our approximation approach uses a branch and bound strategy that employs our fast dynamic programming algorithm for minimizing the expected operational costs for a given production rate as a subroutine. Extensive numerical experiments are conducted to demonstrate the efficiency of the branch and bound procedure for solving large scale instances of the problem and for obtaining some qualitative insights.

8.
《防务技术》2020,16(1):242-250
In decades, the battlefield environment is becoming more and more complex with plenty of electronic equipments. Thus, in order to improve the survivability of radar sensors and satisfy the requirement of maneuvering target tracking with a low probability of intercept, a non-myopic scheduling is proposed to minimize the radiation cost with tracking accuracy constraint. At first, the scheduling problem is formulated as a partially observable Markov decision process (POMDP). Then the tracking accuracy and radiation cost over the future finite time horizon are predicted by the posterior carmér-rao lower bound (PCRLB) and the hidden Markov model filter, respectively. Finally, the proposed scheduling is implemented efficiently by utilizing the branch and bound (B&B) pruning algorithm. Simulation results show that the performance of maneuvering target tracking was improved by the improved interacting multiple model (IMM), and the scheduler time and maximum memory consumption were significant reduced by the present B&B pruning algorithm without losing the optimal solution.  相似文献   

9.
The segregated storage problem involves the optimal distribution of products among compartments with the restriction that only one product may be stored in each compartment. The storage capacity of each compartment, the storage demand for each product, and the linear cost of storing one unit of a product in a given compartment are specified. The problem is reformulated as a large set-packing problem, and a column generation scheme is devised to solve the associated linear programming problem. In case of fractional solutions, a branch and bound procedure is utilized. Computational results are presented.  相似文献   

10.
In this paper, we consider a new weapon–target allocation problem with the objective of minimizing the overall firing cost. The problem is formulated as a nonlinear integer programming model. We applied Lagrangian relaxation and a branch‐and‐bound method to the problem after transforming the nonlinear constraints into linear ones. An efficient primal heuristic is developed to find a feasible solution to the problem to facilitate the procedure. In the branch‐and‐bound method, three different branching rules are considered and the performances are evaluated. Computational results using randomly generated data are presented. © 1999 John Wiley & Sons, Inc. Naval Research Logistics 46: 640–653, 1999  相似文献   

11.
In this paper we present an improved branch and bound algorithm for the vertex coloring problem. The idea is to try to extend the coloring of a maximum clique to its adjacent vertices. If this succeeds, its successive neighbors are considered; in case of failure (i.e., in the case the initial colors are not sufficient), working on the subgraph induced by the maximum clique and its neighborhood, the lower bound is improved by seeking for an optimal coloring of this subgraph by branch and bound. The process is repeated iteratively until the whole graph is examined. The iterative scheme exploits a further lower bound obtained by integrating a simple algorithm into the maximum clique search, and a new method to compute upper bounds on subgraphs. Furthermore, a new branching rule and a method for the selection of the initial maximum clique are presented. Extensive computational results and comparisons with existing exact coloring algorithms on random graphs and benchmarks are given. © 2001 John Wiley & Sons, Inc. Naval Research Logistic 48: 518–550, 2001  相似文献   

12.
We formulate and solve a discrete‐time path‐optimization problem where a single searcher, operating in a discretized three‐dimensional airspace, looks for a moving target in a finite set of cells. The searcher is constrained by maximum limits on the consumption of one or more resources such as time, fuel, and risk along any path. We develop a specialized branch‐and‐bound algorithm for this problem that uses several network reduction procedures as well as a new bounding technique based on Lagrangian relaxation and network expansion. The resulting algorithm outperforms a state‐of‐the‐art algorithm for solving time‐constrained problems and also is the first algorithm to solve multi‐constrained problems. © 2010 Wiley Periodicals, Inc. Naval Research Logistics, 2010  相似文献   

13.
This paper considers the classical nXm flow shop sequencing problem. An improved branch and bound procedure is proposed. Computational experience shows that the proposed procedure is more efficient compared to the existing optimizing procedures.  相似文献   

14.
Optimizing the selection of resources to accomplish a set of tasks involves evaluating the tradeoffs between the cost of maintaining the resources necessary to accomplish the tasks and the penalty cost associated with unfinished tasks. We consider the case where resources are categorized into types, and limits (capacity) are imposed on the number of each type that can be selected. The objective is to minimize the sum of penalty costs and resource costs. This problem has several practical applications including production planning, new product design, menu selection and inventory management. We develop a branch‐and‐bound algorithm to find exact solutions to the problem. To generate bounds, we utilize a dual ascent procedure which exploits the special structure of the problem. Information from the dual and recovered primal solutions are used to select branching variables. We generate strong valid inequalities and use them to fix other variables at each branching step. Results of tests performed on reasonably sized problems are presented. © 1999 John Wiley & Sons, Inc. Naval Research Logistics 46: 19–37, 1999  相似文献   

15.
In many practical manufacturing environments, jobs to be processed can be divided into different families such that a setup is required whenever there is a switch from processing a job of one family to another job of a different family. The time for setup could be sequence independent or sequence dependent. We consider two particular scheduling problems relevant to such situations. In both problems, we are given a set of jobs to be processed on a set of identical parallel machines. The objective of the first problem is to minimize total weighted completion time of jobs, and that of the second problem is to minimize weighted number of tardy jobs. We propose column generation based branch and bound exact solution algorithms for the problems. Computational experiments show that the algorithms are capable of solving both problems of medium size to optimality within reasonable computational time. © 2003 Wiley Periodicals, Inc. Naval Research Logistics 50: 823–840, 2003.  相似文献   

16.
This article develops a robust, exact algorithm for the maximal covering problem (MCP) using dual-based solution methods and greedy heuristics in branch and bound. Based on tests using randomly generated problems with problem parameters similar to those in the existing literature, the hybrid approach developed in this work appears to be effective over a wide range of MCP model parameters. The method is further validated on problems constructed from three real-world data sets. The extensive computational study compares the new method with other existing exact methods using problems that are as big, or larger than, those used in previous work on MCP. The results show that the proposed method is effective in most instances of MCP. In particular, it is shown that bounding schemes using Lagrangian relaxation are effective on MCP as a method of obtaining both exact and heuristic solutions. © 1996 John Wiley & Sons, Inc.  相似文献   

17.
We consider in this paper the coordinated replenishment dynamic lot‐sizing problem when quantity discounts are offered. In addition to the coordination required due to the presence of major and minor setup costs, a separate element of coordination made possible by the offer of quantity discounts needs to be considered as well. The mathematical programming formulation for the incremental discount version of the extended problem and a tighter reformulation of the problem based on variable redefinition are provided. These then serve as the basis for the development of a primal‐dual based approach that yields a strong lower bound for our problem. This lower bound is then used in a branch and bound scheme to find an optimal solution to the problem. Computational results for this optimal solution procedure are reported in the paper. © 2000 John Wiley & Sons, Inc. Naval Research Logistics 47: 686–695, 2000  相似文献   

18.
In this article, we propose a branch‐and‐price‐and‐cut (BPC) algorithm to exactly solve the manpower routing problem with synchronization constraints (MRPSC). Compared with the classical vehicle routing problems (VRPs), the defining characteristic of the MRPSC is that multiple workers are required to work together and start at the same time to carry out a job, that is, the routes of the scheduling subjects are dependent. The incorporation of the synchronization constraints increases the difficulty of the MRPSC significantly and makes the existing VRP exact algorithm inapplicable. Although there are many types of valid inequalities for the VRP or its variants, so far we can only adapt the infeasible path elimination inequality and the weak clique inequality to handle the synchronization constraints in our BPC algorithm. The experimental results at the root node of the branch‐and‐bound tree show that the employed inequalities can effectively improve the lower bound of the problem. Compared with ILOG CPLEX, our BPC algorithm managed to find optimal solutions for more test instances within 1 hour. © 2016 Wiley Periodicals, Inc. Naval Research Logistics 63: 138–171, 2016  相似文献   

19.
The location-allocation problem for existing facilities uniformly distributed over rectangular regions is treated for the case where the rectilinear norm is used. The new facilities are to be located such that the expected total weighted distance is minimized. Properties of the problem are discussed. A branch and bound algorithm is developed for the exact solution of the problem. Computational results are given for different sized problems.  相似文献   

20.
A set of edges D called an isolation set, is said to isolate a set of nodes R from an undirected network if every chain between the nodes in R contains at least one edge from the set D. Associated with each edge of the network is a positive cost. The isolation problem is concerned with finding an isolation set such that the sum of its edge costs is a minimum. This paper formulates the problem of determining the minimal cost isolation as a 0–1 integer linear programming problem. An algorithm is presented which applies a branch and bound enumerative scheme to a decomposed linear program whose dual subproblems are minimal cost network flow problems. Computational results are given. The problem is also formulated as a special quadratic assignment problem and an algorithm is presented that finds a local optimal solution. This local solution is used for an initial bound.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号