1.
Consider two machines, labeled 1 and 2. A set of tasks has to be processed first on machine 1 and after that on machine 2. A second set of tasks has to be processed first on machine 2 and after that on machine 1. All the processing times are exponentially distributed. We present a policy which minimizes the expected completion time of all tasks.  相似文献   

2.
We consider the scheduling of n tasks on a single resource. Each task becomes available for processing at time ai, must be completed by time bi, and requires di time units for processing. The aim is to find a schedule that minimizes the elapsed time to complete all jobs. We present solution algorithms for this problem when job splitting is permitted and when job splitting is not permitted. Then we consider several scheduling situations which arise in practice where these models may apply.  相似文献   

3.
This article defines optimal replacement policies for identical components performing different functions in a given system, when more than one spare part is available. The problem is first formulated for two components and any number of spare parts and the optimal replacement time y(x) at time x is found to have a certain form. Sufficient conditions are then provided for y(x) to be a constant y* for x > y*, and y(x) = x for x > y* (single-critical-number policy). Under the assumption that the optimal policies are of the single-critical-number type, the results are extended to the n-component case, and a theorem is provided that reduces the required number of critical numbers. Finally, the theory is applied to the case of the exponential and uniform failure laws, in which single-critical-number policies are optimal, and to another failure law in which they are not.  相似文献   

4.
The stochastic sequential assignment problem (SSAP) considers how to allocate available distinct workers to sequentially arriving tasks with stochastic parameters such that the expected total reward obtained from the sequential assignments is maximized. Implementing the optimal assignment policy for the SSAP involves calculating a new set of breakpoints upon the arrival of each task (i.e., for every time period), which is impractical for large‐scale problems. This article studies two problems that are concerned with obtaining stationary policies, which achieve the optimal expected reward per task as the number of tasks approaches infinity. The first problem considers independent and identically distributed (IID) tasks with a known distribution function, whereas in the second problem tasks are derived from r different unobservable distributions governed by an ergodic Markov chain. The convergence rate of the expected reward per task to the optimal value is also obtained for both problems. © 2013 Wiley Periodicals, Inc. Naval Research Logistics, 2013  相似文献   

5.
Most machine scheduling models assume that the machines are available all of the time. However, in most realistic situations, machines need to be maintained and hence may become unavailable during certain periods. In this paper, we study the problem of processing a set of n jobs on m parallel machines where each machine must be maintained once during the planning horizon. Our objective is to schedule jobs and maintenance activities so that the total weighted completion time of jobs is minimized. Two cases are studied in this paper. In the first case, there are sufficient resources so that different machines can be maintained simultaneously if necessary. In the second case, only one machine can be maintained at any given time. In this paper, we first show that, even when all jobs have the same weight, both cases of the problem are NP-hard. We then propose branch and bound algorithms based on the column generation approach for solving both cases of the problem. Our algorithms are capable of optimally solving medium sized problems within a reasonable computational time. We note that the general problem where at most j machines, 1 ≤ jm, can be maintained simultaneously, can be solved similarly by the column generation approach proposed in this paper. © 2000 John Wiley & Sons, Inc. Naval Research Logistics 47: 145–165, 2000  相似文献   

6.
A system reliability is often evaluated by individual tests of components that constitute the system. These component test plans have advantages over complete system based tests in terms of time and cost. In this paper, we consider the series system with n components, where the lifetime of the i‐th component follows exponential distribution with parameter λi. Assuming test costs for the components are different, we develop an efficient algorithm to design a two‐stage component test plan that satisfies the usual probability requirements on the system reliability and in addition minimizes the maximum expected cost. For the case of prior information in the form of upper bounds on λi's, we use the genetic algorithm to solve the associated optimization problems which are otherwise difficult to solve using mathematical programming techniques. The two‐stage component test plans are cost effective compared to single‐stage plans developed by Rajgopal and Mazumdar. We demonstrate through several numerical examples that our approach has the potential to reduce the overall testing costs significantly. © 2002 John Wiley & Sons, Inc. Naval Research Logistics, 49: 95–116, 2002; DOI 10.1002/nav.1051  相似文献   

7.
This paper presents a branch and bound algorithm for computing optimal replacement policies in a discrete‐time, infinite‐horizon, dynamic programming model of a binary coherent system with n statistically independent components, and then specializes the algorithm to consecutive k‐out‐of‐n systems. The objective is to minimize the long‐run expected average undiscounted cost per period. (Costs arise when the system fails and when failed components are replaced.) An earlier paper established the optimality of following a critical component policy (CCP), i.e., a policy specified by a critical component set and the rule: Replace a component if and only if it is failed and in the critical component set. Computing an optimal CCP is a optimization problem with n binary variables and a nonlinear objective function. Our branch and bound algorithm for solving this problem has memory storage requirement O(n) for consecutive k‐out‐of‐n systems. Extensive computational experiments on such systems involving over 350,000 test problems with n ranging from 10 to 150 find this algorithm to be effective when n ≤ 40 or k is near n. © 2002 Wiley Periodicals, Inc. Naval Research Logistics 49: 288–302, 2002; Published online in Wiley InterScience (www.interscience.wiley.com). DOI 10.1002/nav.10017  相似文献   

8.
Much work has been done in search theory; however, very little effort has occurred where an object's presence at a location can be accepted when no object is present there. The case analyzed is of this type. The number of locations is finite, a single object is stationary at one location, and only one location is observed each step of the search. The object's location has a known prior probability distribution. Also known are the conditional probability of acceptance given the object's absence (small) and the conditional probability of rejection given the object's presence (not too large); these Probabilities remain fixed for all searching and locations. The class of sequential search policies which terminate the search at the first acceptance is assumed. A single two-part optimization criterion is considered. The search sequence is found which (i) minimizes the probability of obtaining n rejections in the first n steps for all n, and (ii) maximizes the probability that the first acceptance occurs within the first n steps and occurs at the object's location for all n. The optimum sequential search policy specifies that the next location observed is one with the largest posterior probability of the object's presence (evaluated after each step from Bayes Rule) and that the object is at the first location where acceptance occurs. Placement at the first acceptance seems appropriate when the conditional probability of acceptance given the object's absence is sufficiently small. Search always terminates (with probability one). Optimum truncated sequential policies are also considered. Methods are given for evaluating some pertinent properties and for investigating the possibility that no object occurs at any location.  相似文献   

9.
We study a deterministic two‐machine flowshop scheduling problem with an assumption that one of the two machines is not available in a specified time period. This period can be due to a breakdown, preventive maintenance, or processing unfinished jobs from a previous planning horizon. The problem is known to be NP‐hard. Pseudopolynomial dynamic programming algorithms and heuristics with worst case error bounds are given in the literature to solve the problem. They are different for the cases when the unavailability interval is for the first or second machine. The existence of a fully polynomial time approximation scheme (FPTAS) was formulated as an open conjecture in the literature. In this paper, we show that the two cases of the problem under study are equivalent to similar partition type problems. Then we derive a generic FPTAS for the latter problems with O(n54) time complexity. © 2003 Wiley Periodicals, Inc. Naval Research Logistics, 2004.  相似文献   

10.
We consider sequencing of n jobs which will arrive intermittently and are to be processed on a single machine; the arrival and the processing times of each jobs are assumed known. A schedule is to be developed that minimizes the mean flow time. Two models are considered: (i) when no pre-emption or inserted idle time is allowed in the schedule, and (ii) when pre-emption is allowed but the jobs follow a pre-empt-repeat discipline We illustrate that Cobham's and Phipp's SPT dispatching rule does not guarantee the optimum F? even for the non-preemptive model We propose a branch and bound algorithm for both models and discuss our computational experience We also examine the relative performances of the optimum nonpre-emptive sequence, and the optimum pre-empt-repeat sequence over that resulting from SPT dispatching rule on a large number of sets of jobs of varying sizes and tightness.  相似文献   

11.
We consider the problem of scheduling multiprocessor tasks with prespecified processor allocations to minimize the total completion time. The complexity of both preemptive and nonpreemptive cases of the two-processor problem are studied. We show that the preemptive case is solvable in O(n log n) time. In the nonpreemptive case, we prove that the problem is NP-hard in the strong sense, which answers an open question mentioned in Hoogeveen, van de Velde, and Veltman (1994). An efficient heuristic is also developed for this case. The relative error of this heuristic is at most 100%. © 1998 John Wiley & Sons, Inc. Naval Research Logistics 45: 231–242, 1998  相似文献   

12.
We consider the problem of rescheduling n jobs to minimize the makespan on m parallel identical processors when m changes value. We show this problem to be NP-hard in general. Call a list schedule totally optimal if it is optimal for all m = 1, …,n. When n is less than 6, there always exists a totally optimal schedule, but for n ≥ 6 this can fail. We show that an exact solution is less robust than the largest processing time first (LPT) heuristic and discuss implications for polynomial approximation schemes and hierarchical planning models.  相似文献   

13.
We present a service constrained (Q, r) model that minimizes expected holding and ordering costs subject to an upper bound on the expected waiting time of demands that are actually backordered. We show that, after optimizing over r, the average cost is quasiconvex in Q for logconcave continuous lead time demand distributions. For logconcave discrete lead time demand distributions we find a single‐pass efficient algorithm based on a novel search stopping criterion. The algorithm also allows for bounds on the variability of the service measure. A brief numerical study indicates how the bounds on service impact the optimal average cost and the optimal (Q, r) choice. The discrete case algorithm can be readily adapted to provide a single pass algorithm for the traditional model that bounds the expected waiting time of all demands (backordered or not). © 2002 Wiley Periodicals, Inc. Naval Research Logistics 49: 557–573, 2002; Published online in Wiley InterScience (www.interscience.wiley.com). DOI 10.1002/nav.10028  相似文献   

14.
The first problem considered in this paper is concerned with the assembly of independent components into parallel systems so as to maximize the expected number of systems that perform satisfactorily. Associated with each component is a probability of it performing successfully. It is shown that an optimal assembly is obtained if the reliability of each assembled system can be made equal. If such equality is not attainable, then bounds are given so that the maximum expected number of systems that perform satisfactorily will lie within these stated bounds; the bounds being a function of an arbitrarily chosen assembly. An improvement algorithm is also presented. A second problem treated is concerned with the optimal design of a system. Instead of assembling given units, there is an opportunity to “control” their quality, i.e., the manufacturer is able to fix the probability, p, of a unit performing successfully. However, his resources, are limited so that a constraint is imposed on these probabilities. For (1) series systems, (2) parallel systems, and (3) k out of n systems, results are obtained for finding the optimal p's which maximize the reliability of a single system, and which maximize the expected number of systems that perform satisfactorily out of a total assembly of J systems.  相似文献   

15.
We consider the problem of scheduling n jobs with random processing times on a single machine in order to minimize the expected variance of the completion times. We prove a number of results, including one to the effect that the optimal schedule must be V shaped when the jobs have identical means or variances or have exponential processing times.  相似文献   

16.
We consider the salvo policy problem, in which there are k moments, called salvos, at which we can fire multiple missiles simultaneously at an incoming object. Each salvo is characterized by a probability pi: the hit probability of a single missile. After each salvo, we can assess whether the incoming object is still active. If it is, we fire the missiles assigned to the next salvo. In the salvo policy problem, the goal is to assign at most n missiles to salvos in order to minimize the expected number of missiles used. We consider three problem versions. In Gould's version, we have to assign all n missiles to salvos. In the Big Bomb version, a cost of B is incurred when all salvo's are unsuccessful. Finally, we consider the Quota version in which the kill probability should exceed some quota Q. We discuss the computational complexity and the approximability of these problem versions. In particular, we show that Gould's version and the Big Bomb version admit pseudopolynomial time exact algorithms and fully polynomial time approximation schemes. We also present an iterative approximation algorithm for the Quota version, and show that a related problem is NP-complete.  相似文献   

17.
The authors study a discrete-time, infinite-horizon, dynamic programming model for the replacement of components in a binary k-out-of-n failure system. (The system fails when k or more of its n components fail.) Costs are incurred when the system fails and when failed components are replaced. The objective is to minimize the long-run expected average undiscounted cost per period. A companion article develops a branch-and-bound algorithm for computing optimal policies. Extensive computational experiments find it effective for k to be small or near n; however, difficulties are encountered when n ≥ 30 and 10 ≤ kn − 4. This article presents a simple, intuitive heuristic rule for determining a replacement policy whose memory storage and computation time requirements are O(n − k) and O(n(n − k) + k), respectively. This heuristic is based on a plausible formula for ranking components in order of their usefulness. The authors provide sufficient conditions for it to be optimal and undertake computational experiments that suggest that it handles parallel systems (k = n) effectively and, further, that its effectiveness increases as k moves away from n. In our test problems, the mean relative errors are under 5% when n ≤ 100 and under 2% when kn − 3 and n ≤ 50. © 1997 John Wiley & Sons, Inc. Naval Research Logistics 44, 273–286, 1997.  相似文献   

18.
This article proposes a modified preventive maintenance (PM) policy which may be done only at scheduled times nT (n = 1,2, …): The PM is done at the next such time if and only if the total number of failures exceeds a specified number k. The optimal number k* to minimize the expected cost rate is discussed. Further, four alternative similar PM models are considered, when the system fails due to a certain number of faults, uses, shocks, and unit failures.  相似文献   

19.
We consider a processing network in which jobs arrive at a fork‐node according to a renewal process. Each job requires the completion of m tasks, which are instantaneously assigned by the fork‐node to m task‐processing nodes that operate like G/M/1 queueing stations. The job is completed when all of its m tasks are finished. The sojourn time (or response time) of a job in this G/M/1 fork‐join network is the total time it takes to complete the m tasks. Our main result is a closed‐form approximation of the sojourn‐time distribution of a job that arrives in equilibrium. This is obtained by the use of bounds, properties of D/M/1 and M/M/1 fork‐join networks, and exploratory simulations. Statistical tests show that our approximation distributions are good fits for the sojourn‐time distributions obtained from simulations. © 2008 Wiley Periodicals, Inc. Naval Research Logistics, 2008  相似文献   

20.
In this paper, two different kinds of (N, T)‐policies for an M/M/m queueing system are studied. The system operates only intermittently and is shut down when no customers are present any more. A fixed setup cost of K > 0 is incurred each time the system is reopened. Also, a holding cost of h > 0 per unit time is incurred for each customer present. The two (N, T)‐policies studied for this queueing system with cost structures are as follows: (1) The system is reactivated as soon as N customers are present or the waiting time of the leading customer reaches a predefined time T, and (2) the system is reactivated as soon as N customers are present or the time units after the end of the last busy period reaches a predefined time T. The equations satisfied by the optimal policy (N*, T*) for minimizing the long‐run average cost per unit time in both cases are obtained. Particularly, we obtain the explicit optimal joint policy (N*, T*) and optimal objective value for the case of a single server, the explicit optimal policy N* and optimal objective value for the case of multiple servers when only predefined customers number N is measured, and the explicit optimal policy T* and optimal objective value for the case of multiple servers when only predefined time units T is measured, respectively. These results partly extend (1) the classic N or T policy to a more practical (N, T)‐policy and (2) the conclusions obtained for single server system to a system consisting of m (m ≥ 1) servers. © 2000 John Wiley & Sons, Inc. Naval Research Logistics 47: 240–258, 2000  相似文献   