Motivated by the flow of products in the iron and steel industry, we study an identical and parallel machine scheduling problem with batch deliveries, where jobs finished on the parallel machines are delivered to customers in batches. Each delivery batch has a capacity and incurs a cost. The objective is to find a coordinated production and delivery schedule that minimizes the total flow time of jobs plus the total delivery cost. This problem is an extension of the problem considered by Hall and Potts, Ann Oper Res 135 (2005) 41–64, who studied a two‐machine problem with an unbounded number of transporters and unbounded delivery capacity. We first provide a dynamic programming algorithm to solve a special case with a given job assignment to the machines. A heuristic algorithm is then presented for the general problem, and its worst‐case performance ratio is analyzed. The computational results show that the heuristic algorithm can generate near‐optimal solutions. Finally, we offer a fully polynomial‐time approximation scheme for a fixed number of machines. © 2016 Wiley Periodicals, Inc. Naval Research Logistics 63: 492–502, 2016  相似文献   

2.
Most papers in the scheduling field assume that a job can be processed by only one machine at a time. Namely, they use a one‐job‐on‐one‐machine model. In many industry settings, this may not be an adequate model. Motivated by human resource planning, diagnosable microprocessor systems, berth allocation, and manufacturing systems that may require several resources simultaneously to process a job, we study the problem with a one‐job‐on‐multiple‐machine model. In our model, there are several alternatives that can be used to process a job. In each alternative, several machines need to process simultaneously the job assigned. Our purpose is to select an alternative for each job and then to schedule jobs to minimize the completion time of all jobs. In this paper, we provide a pseudopolynomial algorithm to solve optimally the two‐machine problem, and a combination of a fully polynomial scheme and a heuristic to solve the three‐machine problem. We then extend the results to a general m‐machine problem. Our algorithms also provide an effective lower bounding scheme which lays the foundation for solving optimally the general m‐machine problem. Furthermore, our algorithms can also be applied to solve a special case of the three‐machine problem in pseudopolynomial time. Both pseudopolynomial algorithms (for two‐machine and three‐machine problems) are much more efficient than those in the literature. © 1999 John Wiley & Sons, Inc. Naval Research Logistics 46: 57–74, 1999  相似文献   

3.
The scheduling problem addressed in this paper concerns a manufacturer who produces a variety of product types and operates in a make‐to‐order environment. Each customer order consists of known quantities of the different product types, and must be delivered as a single shipment. Periodically the manufacturer schedules the accumulated and unscheduled customer orders. Instances of this problem occur across industries in manufacturing as well as in service environments. In this paper we show that the problem of minimizing the weighted sum of customer order delivery times is unary NP‐hard. We characterize the optimal schedule, solve several special cases of the problem, derive tight lower bounds, and propose several heuristic solutions. We report the results of a set of computational experiments to evaluate the lower bounding procedures and the heuristics, and to determine optimal solutions. © 2005 Wiley Periodicals, Inc. Naval Research Logistics, 2005.  相似文献   

4.
We study the problem of minimizing the makespan in no‐wait two‐machine open shops producing multiple products using lot streaming. In no‐wait open shop scheduling, sublot sizes are necessarily consistent; i.e., they remain the same over all machines. This intractable problem requires finding sublot sizes, a product sequence for each machine, and a machine sequence for each product. We develop a dynamic programming algorithm to generate all the dominant schedule profiles for each product that are required to formulate the open shop problem as a generalized traveling salesman problem. This problem is equivalent to a classical traveling salesman problem with a pseudopolynomial number of cities. We develop and test a computationally efficient heuristic for the open shop problem. Our results indicate that solutions can quickly be found for two machine open shops with up to 50 products. © 2005 Wiley Periodicals, Inc. Naval Research Logistics, 2005  相似文献   

5.
We present a shifting bottleneck heuristic for minimizing the total weighted tardiness in a job shop. The method decomposes the job shop into a number of single‐machine subproblems that are solved one after another. Each machine is scheduled according to the solution of its corresponding subproblem. The order in which the single machine subproblems are solved has a significant impact on the quality of the overall solution and on the time required to obtain this solution. We therefore test a number of different orders for solving the subproblems. Computational results on 66 instances with ten jobs and ten machines show that our heuristic yields solutions that are close to optimal, and it clearly outperforms a well‐known dispatching rule enhanced with backtracking mechanisms. © 1999 John Wiley & Sons, Inc. Naval Research Logistics 46: 1–17, 1999  相似文献   

6.
In this paper we propose some non‐greedy heuristics and develop an Augmented‐Neural‐Network (AugNN) formulation for solving the classical open‐shop scheduling problem (OSSP). AugNN is a neural network based meta‐heuristic approach that allows integration of domain‐specific knowledge. The OSSP is framed as a neural network with multiple layers of jobs and machines. Input, output and activation functions are designed to enforce the problem constraints and embed known heuristics to generate a good feasible solution fast. Suitable learning strategies are applied to obtain better neighborhood solutions iteratively. The new heuristics and the AugNN formulation are tested on several benchmark problem instances in the literature and on some new problem instances generated in this study. The results are very competitive with other meta‐heuristic approaches, both in terms of solution quality and computational times. © 2005 Wiley Periodicals, Inc. Naval Research Logistics, 2005.  相似文献   

7.
We study a generalization of the weighted set covering problem where every element needs to be covered multiple times. When no set contains more than two elements, we can solve the problem in polynomial time by solving a corresponding weighted perfect b‐matching problem. In general, we may use a polynomial‐time greedy heuristic similar to the one for the classical weighted set covering problem studied by D.S. Johnson [Approximation algorithms for combinatorial problems, J Comput Syst Sci 9 (1974), 256–278], L. Lovasz [On the ratio of optimal integral and fractional covers, Discrete Math 13 (1975), 383–390], and V. Chvatal [A greedy heuristic for the set‐covering problem, Math Oper Res 4(3) (1979), 233–235] to get an approximate solution for the problem. We find a worst‐case bound for the heuristic similar to that for the classical problem. In addition, we introduce a general type of probability distribution for the population of the problem instances and prove that the greedy heuristic is asymptotically optimal for instances drawn from such a distribution. We also conduct computational studies to compare solutions resulting from running the heuristic and from running the commercial integer programming solver CPLEX on problem instances drawn from a more specific type of distribution. The results clearly exemplify benefits of using the greedy heuristic when problem instances are large. © 2003 Wiley Periodicals, Inc. Naval Research Logistics, 2005  相似文献   

8.
We consider the nonpermutation flow shop problem with release dates, with the objective of minimizing the sum of the weighted completion times on the final machine. Since the problem is NP‐hard, we focus on the analysis of the performance of several approximation algorithms, all of which are related to the classical Weighted Shortest Processing Time Among Available Jobs heuristic. In particular, we perform a probabilistic analysis and prove that two online heuristics and one offline heuristic are asymptotically optimal. © 2005 Wiley Periodicals, Inc. Naval Research Logistics, 2005.  相似文献   

9.
The parallel machine replacement problem consists of finding a minimum cost replacement policy for a finite population of economically interdependent machines. In this paper, we formulate a stochastic version of the problem and analyze the structure of optimal policies under general classes of replacement cost functions. We prove that for problems with arbitrary cost functions, there can be optimal policies where a machine is replaced only if all machines in worse states are replaced (Worse Cluster Replacement Rule). We then show that, for problems with replacement cost functions exhibiting nonincreasing marginal costs, there are optimal policies such that, in any stage, machines in the same state are either all kept or all replaced (No‐Splitting Rule). We also present an example that shows that economies of scale in replacement costs do not guarantee optimal policies that satisfy the No‐Splitting Rule. These results lead to the fundamental insight that replacement decisions are driven by marginal costs, and not by economies of scale as suggested in the literature. Finally, we describe how the optimal policy structure, i.e., the No‐Splitting and Worse Cluster Replacement Rules, can be used to reduce the computational effort required to obtain optimal replacement policies. © 2005 Wiley Periodicals, Inc. Naval Research Logistics, 2005  相似文献   

10.
In this paper we study the scheduling problem that considers both production and job delivery at the same time with machine availability considerations. Only one vehicle is available to deliver jobs in a fixed transportation time to a distribution center. The vehicle can load at most K jobs as a delivery batch in one shipment due to the vehicle capacity constraint. The objective is to minimize the arrival time of the last delivery batch to the distribution center. Since machines may not always be available over the production period in real life due to preventive maintenance, we incorporate machine availability into the models. Three scenarios of the problem are studied. For the problem in which the jobs are processed on a single machine and the jobs interrupted by the unavailable machine interval are resumable, we provide a polynomial algorithm to solve the problem optimally. For the problem in which the jobs are processed on a single machine and the interrupted jobs are nonresumable, we first show that the problem is NP‐hard. We then propose a heuristic with a worst‐case error bound of 1/2 and show that the bound is tight. For the problem in which the jobs are processed on either one of two parallel machines, where only one machine has an unavailable interval and the interrupted jobs are resumable, we propose a heuristic with a worst‐case error bound of 2/3. © 2006 Wiley Periodicals, Inc. Naval Research Logistics, 2007  相似文献   

11.
Consider a supplier offering a product to several potential demand sources, each with a unique revenue, size, and probability that it will materialize. Given a long procurement lead time, the supplier must choose the orders to pursue and the total quantity to procure prior to the selling season. We model this as a selective newsvendor problem of maximizing profits where the total (random) demand is given by the set of pursued orders. Given that the dimensionality of a mixed‐integer linear programming formulation of the problem increases exponentially with the number of potential orders, we develop both a tailored exact algorithm based on the L‐shaped method for two‐stage stochastic programming as well as a heuristic method. We also extend our solution approach to account for piecewise‐linear cost and revenue functions as well as a multiperiod setting. Extensive experimentation indicates that our exact approach rapidly finds optimal solutions with three times as many orders as a state‐of‐the‐art commercial solver. In addition, our heuristic approach provides average gaps of less than 1% for the largest problems that can be solved exactly. Observing that the gaps decrease as problem size grows, we expect the heuristic approach to work well for large problem instances. © 2008 Wiley Periodicals, Inc. Naval Research Logistics 2008  相似文献   

12.
We focus on the concave‐cost version of a production planning problem where a manufacturer can meet demand by either producing new items or by remanufacturing used items. Unprocessed used items are disposed. We show the NP‐hardness of the problem even when all the costs are stationary. Utilizing the special structure of the extreme‐point optimal solutions for the minimum concave‐cost problem with a network flow type feasible region, we develop a polynomial‐time heuristic for the problem. Our computational study indicates that the heuristic is a very efficient way to solve the problem as far as solution speed and quality are concerned. © 2005 Wiley Periodicals, Inc. Naval Research Logistics, 2005  相似文献   

13.
We study a single batching machine scheduling problem with transportation and deterioration considerations arising from steel production. A set of jobs are transported, one at a time, by a vehicle from a holding area to the single batching machine. The machine can process several jobs simultaneously as a batch. The processing time of a job will increase if the duration from the time leaving the holding area to the start of its processing exceeds a given threshold. The time needed to process a batch is the longest of the job processing times in the batch. The problem is to determine the job sequence for transportation and the job batching for processing so as to minimize the makespan and the number of batches. We study four variations (P1, P2, P3, P4) of the problem with different treatments of the two criteria. We prove that all the four variations are strongly NP‐hard and further develop polynomial time algorithms for their special cases. For each of the first three variations, we propose a heuristic algorithm and analyze its worst‐case performance. For P4, which is to find the Pareto frontier, we provide a heuristic algorithm and an exact algorithm based on branch and bound. Computational experiments show that all the heuristic algorithms perform well on randomly generated problem instances, and the exact algorithm for P4 can obtain Pareto optimal schedules for small‐scale instances. © 2014 Wiley Periodicals, Inc. Naval Research Logistics 61: 269–285, 2014  相似文献   

14.
We consider a short‐term capacity allocation problem with tool and setup constraints that arises in the context of operational planning in a semiconductor wafer fabrication facility. The problem is that of allocating the available capacity of parallel nonidentical machines to available work‐in‐process (WIP) inventory of operations. Each machine can process a subset of the operations and a tool setup is required on a machine to change processing from one operation to another. Both the number of tools available for an operation and the number of setups that can be performed on a machine during a specified time horizon are limited. We formulate this problem as a degree‐constrained network flow problem on a bipartite graph, show that the problem is NP‐hard, and propose constant factor approximation algorithms. We also develop constructive heuristics and a greedy randomized adaptive search procedure for the problem. Our computational experiments demonstrate that our solution procedures solve the problem efficiently, rendering the use of our algorithms in real environment feasible. © 2005 Wiley Periodicals, Inc. Naval Research Logistics, 2005  相似文献   

15.
We consider a make‐to‐order production–distribution system with one supplier and one or more customers. A set of orders with due dates needs to be processed by the supplier and delivered to the customers upon completion. The supplier can process one order at a time without preemption. Each customer is at a distinct location and only orders from the same customer can be batched together for delivery. Each delivery shipment has a capacity limit and incurs a distribution cost. The problem is to find a joint schedule of order processing at the supplier and order delivery from the supplier to the customers that optimizes an objective function involving the maximum delivery tardiness and the total distribution cost. We first study the solvability of various cases of the problem by either providing an efficient algorithm or proving the intractability of the problem. We then develop a fast heuristic for the general problem. We show that the heuristic is asymptotically optimal as the number of orders goes to infinity. We also evaluate the performance of the heuristic computationally by using lower bounds obtained by a column generation approach. Our results indicate that the heuristic is capable of generating near optimal solutions quickly. Finally, we study the value of production–distribution integration by comparing our integrated approach with two sequential approaches where scheduling decisions for order processing are made first, followed by order delivery decisions, with no or only partial integration of the two decisions. We show that in many cases, the integrated approach performs significantly better than the sequential approaches. © 2005 Wiley Periodicals, Inc. Naval Research Logistics, 2005  相似文献   

16.
In hinterland container transportation the use of barges is getting more and more important. We propose a real‐life operational planning problem model from an inland terminal operating company, in which the number of containers shipped per barge is maximized and the number of terminals visited per barge is minimized. This problem is solved with an integer linear program (ILP), yielding strong cost reductions, about 20%, compared to the method used currently in practice. Besides, we develop a heuristic that solves the ILP in two stages. First, it decides for each barge which terminals to visit and second it assigns containers to the barges. This heuristic produces almost always optimal solutions and otherwise near‐optimal solutions. Moreover, the heuristic runs much faster than the ILP, especially for large‐sized instances.  相似文献   

17.
We consider server scheduling on parallel dedicated machines to minimize the makespan. Each job has a loading operation and a processing operation. The loading operation requires a server that serves all the jobs. Each machine has a given set of jobs to process, and the processing sequence is known and fixed. We design a polynomial‐time algorithm to solve the two‐machine case of the problem. When the number of machines is arbitrary, the problem becomes strongly NP‐hard even if all the jobs have the same processing length or all the loading operations require a unit time. We design two heuristic algorithms to treat the case where all the loading times are unit and analyze their performance.  相似文献   

18.
This paper considers a finite horizon parallel machine replacement problem where a fixed number of machines is in operation at all times. The operating cost for a machine goes up as the machine gets older. An older machine may have to be replaced by a new one when its operating cost becomes too high. There is a fixed order cost associated with the purchase of new machines. Machine purchase prices and salvage values may depend on the period in which they were purchased. The objective is to find a replacement plan that minimizes the total discounted cost over the problem horizon. We believe that the costs in our model are more commonly observed in practice than those previously used in the literature. The paper develops properties of optimal solutions and an efficient forward‐time algorithm to find an optimal replacement plan. A dominance property is developed that further limits the options to be considered, and a simple forecast horizon result is also presented. Future research possibilities are mentioned. © 2002 Wiley Periodicals, Inc. Naval Research Logistics 49: 275–287, 2002; Published online in Wiley InterScience (http://www.interscience.wiley.com). DOI 10.1002/nav.10012  相似文献   

19.
We consider the problem of scheduling customer orders in a flow shop with the objective of minimizing the sum of tardiness, earliness (finished goods inventory holding), and intermediate (work‐in‐process) inventory holding costs. We formulate this problem as an integer program, and based on approximate solutions to two different, but closely related, Dantzig‐Wolfe reformulations, we develop heuristics to minimize the total cost. We exploit the duality between Dantzig‐Wolfe reformulation and Lagrangian relaxation to enhance our heuristics. This combined approach enables us to develop two different lower bounds on the optimal integer solution, together with intuitive approaches for obtaining near‐optimal feasible integer solutions. To the best of our knowledge, this is the first paper that applies column generation to a scheduling problem with different types of strongly ????‐hard pricing problems which are solved heuristically. The computational study demonstrates that our algorithms have a significant speed advantage over alternate methods, yield good lower bounds, and generate near‐optimal feasible integer solutions for problem instances with many machines and a realistically large number of jobs. © 2004 Wiley Periodicals, Inc. Naval Research Logistics, 2004.  相似文献   

20.
We study optimal age‐replacement policies for machines in series with non‐instantaneous repair times by formulating two nonlinear programs: one that minimizes total cost‐rate subject to a steady‐state throughput requirement and another that maximizes steady‐state throughput subject to a cost‐rate budget constraint. Under reasonable assumptions, the single‐machine cost‐optimal and throughput‐optimal solutions are unique and orderable, and the multi‐machine optimal solutions have appealing structure. Furthermore, we establish equivalence between the two formulations and provide an illustrative numerical example. © 2006 Wiley Periodicals, Inc. Naval Research Logistics, 2006  相似文献   