首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 31 毫秒
1.
In a recent paper, Hamilton Emmons has established theorems relating to the order in which pairs of jobs are to be processed in an optimal schedule to minimize the total tardiness of performing n jobs on one machine. Using these theorems, the algorithm of this paper determines the precedence relationships among pairs of jobs (whenever possible) and eliminates the first and the last few jobs in an optimal sequence. The remaining jobs are then ordered by incorporating the precedence relationships in a dynamic programming framework. Propositions are proved which considerably reduce the total computation involved in the dynamic programming phase. Computational results indicate that the solution time goes up less than linearly with the size (n) of the problem. The median solution time for solving 50 job problems was 0.36 second on UNIVAC 1108 computer.  相似文献   

2.
In this paper, we consider the problem of minimizing the mean flow time of jobs to be processed on two machines. The jobs have a predetermined order, perhaps reflecting the order of arrival, and each job has a known processing time. We wish to assign the jobs to machines so as to minimize the mean flow time, with the constraint that the original order must be preserved within the subset of jobs assigned to each machine. An efficient algorithm based on dynamic programming is developed.  相似文献   

3.
In the flow shop delivery time problem, a set of jobs has to be processed on m machines. Every machine has to process each one of the jobs, and every job has the same routing through the machines. The objective is to determine a sequence of the jobs on the machines so as to minimize maximum delivery completion time over all the jobs, where the delivery completion time of a job is the sum of its completion time, and the delivery time associated with that job. In this paper, we prove the asymptotic optimality of the Longest Delivery Time algorithm for the static version of this problem, and the Longest Delivery Time among Available Jobs (LDTA) algorithm for the dynamic version of this problem. In addition, we present the result of computational testing of the effectiveness of these algorithms. © 2003 Wiley Periodicals, Inc. Naval Research Logistics, 2003  相似文献   

4.
In this paper we study the scheduling problem that considers both production and job delivery at the same time with machine availability considerations. Only one vehicle is available to deliver jobs in a fixed transportation time to a distribution center. The vehicle can load at most K jobs as a delivery batch in one shipment due to the vehicle capacity constraint. The objective is to minimize the arrival time of the last delivery batch to the distribution center. Since machines may not always be available over the production period in real life due to preventive maintenance, we incorporate machine availability into the models. Three scenarios of the problem are studied. For the problem in which the jobs are processed on a single machine and the jobs interrupted by the unavailable machine interval are resumable, we provide a polynomial algorithm to solve the problem optimally. For the problem in which the jobs are processed on a single machine and the interrupted jobs are nonresumable, we first show that the problem is NP‐hard. We then propose a heuristic with a worst‐case error bound of 1/2 and show that the bound is tight. For the problem in which the jobs are processed on either one of two parallel machines, where only one machine has an unavailable interval and the interrupted jobs are resumable, we propose a heuristic with a worst‐case error bound of 2/3. © 2006 Wiley Periodicals, Inc. Naval Research Logistics, 2007  相似文献   

5.
In many practical manufacturing environments, jobs to be processed can be divided into different families such that a setup is required whenever there is a switch from processing a job of one family to another job of a different family. The time for setup could be sequence independent or sequence dependent. We consider two particular scheduling problems relevant to such situations. In both problems, we are given a set of jobs to be processed on a set of identical parallel machines. The objective of the first problem is to minimize total weighted completion time of jobs, and that of the second problem is to minimize weighted number of tardy jobs. We propose column generation based branch and bound exact solution algorithms for the problems. Computational experiments show that the algorithms are capable of solving both problems of medium size to optimality within reasonable computational time. © 2003 Wiley Periodicals, Inc. Naval Research Logistics 50: 823–840, 2003.  相似文献   

6.
We consider sequencing of n jobs which will arrive intermittently and are to be processed on a single machine; the arrival and the processing times of each jobs are assumed known. A schedule is to be developed that minimizes the mean flow time. Two models are considered: (i) when no pre-emption or inserted idle time is allowed in the schedule, and (ii) when pre-emption is allowed but the jobs follow a pre-empt-repeat discipline We illustrate that Cobham's and Phipp's SPT dispatching rule does not guarantee the optimum F? even for the non-preemptive model We propose a branch and bound algorithm for both models and discuss our computational experience We also examine the relative performances of the optimum nonpre-emptive sequence, and the optimum pre-empt-repeat sequence over that resulting from SPT dispatching rule on a large number of sets of jobs of varying sizes and tightness.  相似文献   

7.
In the last decade, there has been much progress in understanding scheduling problems in which selfish jobs aim to minimize their individual completion time. Most of this work has focused on makespan minimization as social objective. In contrast, we consider as social cost the total weighted completion time, that is, the sum of the agent costs, a standard definition of welfare in economics. In our setting, jobs are processed on restricted uniform parallel machines, where each machine has a speed and is only capable of processing a subset of jobs; a job's cost is its weighted completion time; and each machine sequences its jobs in weighted shortest processing time (WSPT) order. Whereas for the makespan social cost the price of anarchy is not bounded by a constant in most environments, we show that for our minsum social objective the price of anarchy is bounded above by a small constant, independent of the instance. Specifically, we show that the price of anarchy is exactly 2 for the class of unit jobs, unit speed instances where the finite processing time values define the edge set of a forest with the machines as nodes. For the general case of mixed job strategies and restricted uniform machines, we prove that the price of anarchy equals 4. From a classical machine scheduling perspective, our results establish the same constant performance guarantees for WSPT list scheduling. © 2012 Wiley Periodicals, Inc. Naval Research Logistics, 2012  相似文献   

8.
We consider the problem of scheduling n independent and simultaneously available jobs without preemption on a single machine, where the machine has a fixed maintenance activity. The objective is to find the optimal job sequence to minimize the total amount of late work, where the late work of a job is the amount of processing of the job that is performed after its due date. We first discuss the approximability of the problem. We then develop two pseudo‐polynomial dynamic programming algorithms and a fully polynomial‐time approximation scheme for the problem. Finally, we conduct extensive numerical studies to evaluate the performance of the proposed algorithms. © 2016 Wiley Periodicals, Inc. Naval Research Logistics 63: 172–183, 2016  相似文献   

9.
We consider the problem of scheduling a set of n jobs on a single batch machine, where several jobs can be processed simultaneously. Each job j has a processing time pj and a size sj. All jobs are available for processing at time 0. The batch machine has a capacity D. Several jobs can be batched together and processed simultaneously, provided that the total size of the jobs in the batch does not exceed D. The processing time of a batch is the largest processing time among all jobs in the batch. There is a single vehicle available for delivery of the finished products to the customer, and the vehicle has capacity K. We assume that K = rD, where and r is an integer. The travel time of the vehicle is T; that is, T is the time from the manufacturer to the customer. Our goal is to find a schedule of the jobs and a delivery plan so that the service span is minimized, where the service span is the time that the last job is delivered to the customer. We show that if the jobs have identical sizes, then we can find a schedule and delivery plan in time such that the service span is minimum. If the jobs have identical processing times, then we can find a schedule and delivery plan in time such that the service span is asymptotically at most 11/9 times the optimal service span. When the jobs have arbitrary processing times and arbitrary sizes, then we can find a schedule and delivery plan in time such that the service span is asymptotically at most twice the optimal service span. We also derive upper bounds of the absolute worst‐case ratios in both cases. © 2015 Wiley Periodicals, Inc. Naval Research Logistics 62: 470–482, 2015  相似文献   

10.
This paper deals with flowshop/sum of completion times scheduling problems, working under a “no-idle” or a “no-wait” constraint, the former prescribes for the machines to work continuously without idle intervals and the latter for the jobs to be processed continuously without waiting times between consecutive machines. Under either of the constraints the problem is unary NP-Complete for two machines. We prove some properties of the optimal schedule for n/2/F, no-idle/σCi. For n/m/P, no-idle/σCi, and n/m/P, no-wait/σCi, with an increasing or decreasing series of dominating machines, we prove theorems that are the basis for polynomial bounded algorithms. All theorems are demonstrated numerically.  相似文献   

11.
We consider problem of scheduling jobs on‐line on batch processing machines with dynamic job arrivals to minimize makespan. A batch machine can handle up to B jobs simultaneously. The jobs that are processed together from a batch, and all jobs in a batch start and complete at the same time. The processing time of a batch is given by the longest processing time of any job in the batch. Each job becomes available at its arrival time, which is unknown in advance, and its processing time becomes known upon its arrival. In the first part of this paper, we address the single batch processing machine scheduling problem. First we deal with two variants: the unbounded model where B is sufficiently large and the bounded model where jobs have two distinct arrival times. For both variants, we provide on‐line algorithms with worst‐case ratio (the inverse of the Golden ratio) and prove that these results are the best possible. Furthermore, we generalize our algorithms to the general case and show a worst‐case ratio of 2. We then consider the unbounded case for parallel batch processing machine scheduling. Lower bound are given, and two on‐line algorithms are presented. © 2001 John Wiley & Sons, Inc. Naval Research Logistics 48: 241–258, 2001  相似文献   

12.
A set of jobs can be processed without interruption by a flexible machine only if the set of tools required by all jobs can be loaded in the tool magazine. However, in practice the total number of tools required by a job set would exceed the tool magazine capacity. In such situations, the job set has to be carefully partitioned at the start of the production run such that each partition can be processed without interruption. During the production run, if there are unscheduled machine downtimes due to machine failure, this provides an additional opportunity to optimally retool the magazine for a smaller job set consisting of just the unprocessed jobs. In this paper, we study job sequencing rules that allow us to minimize the total expected cost of machine down time due to machine failures and magazine retooling, assuming a dynamic re‐sequencing of the unprocessed jobs after each machine failure. Using these rules, we develop a branch‐and‐bound heuristic that allows us to solve problems of reasonable size. © 2001 John Wiley & Sons, Inc. Naval Research Logistics 48: 79–97, 2001  相似文献   

13.
We consider server scheduling on parallel dedicated machines to minimize the makespan. Each job has a loading operation and a processing operation. The loading operation requires a server that serves all the jobs. Each machine has a given set of jobs to process, and the processing sequence is known and fixed. We design a polynomial‐time algorithm to solve the two‐machine case of the problem. When the number of machines is arbitrary, the problem becomes strongly NP‐hard even if all the jobs have the same processing length or all the loading operations require a unit time. We design two heuristic algorithms to treat the case where all the loading times are unit and analyze their performance.  相似文献   

14.
In many practical multiserver queueing systems, servers not only serve randomly arriving customers but also work on the secondary jobs with infinite backlog during their idle time. In this paper, we propose a c‐server model with a two‐threshold policy, denoted by (e d), to evaluate the performance of this class of systems. With such a policy, when the number of idle servers has reached d (<c), then e (<d) idle agents will process secondary jobs. These e servers keep working on the secondary jobs until they find waiting customers exist in the system at a secondary job completion instant. Using the matrix analytic method, we obtain the stationary performance measures for evaluating different (e, d) policies. © 2006 Wiley Periodicals, Inc. Naval Research Logistics, 2007.  相似文献   

15.
In this paper the problem of finding an optimal schedule for the n-job, M-machine flowshop scheduling problem is considered when there is no intermediate space to hold partially completed jobs and the objective function is to minimize the weighted sum of idle times on all machines. By assuming that jobs are processed as early as possible, the problem is modeled as a traveling salesman problem and solved by known solution techniques for the traveling salesman problem. A sample problem is solved and a special case, one involving only two machines, is discussed.  相似文献   

16.
We use the matrix‐geometric method to study the MAP/PH/1 general preemptive priority queue with a multiple class of jobs. A procedure for obtaining the block matrices representing the transition matrix P is presented. We show that the special upper triangular structure of the matrix R obtained by Miller [Computation of steady‐state probabilities for M/M/1 priority queues, Oper Res 29(5) (1981), 945–958] can be extended to an upper triangular block structure. Moreover, the subblock matrices of matrix R also have such a structure. With this special structure, we develop a procedure to compute the matrix R. After obtaining the stationary distribution of the system, we study two primary performance indices, namely, the distributions of the number of jobs of each type in the system and their waiting times. Although most of our analysis is carried out for the case of K = 3, the developed approach is general enough to study the other cases (K ≥ 4). © 2003 Wiley Periodicals, Inc. Naval Research Logistics 50: 662–682, 2003.  相似文献   

17.
Consider a threshold control policy for an imperfect production system with only a work center handling both regular and rework jobs. An imperfect production system studied here, generates defect jobs by factors other than machine failures. A threshold control or (ω, s) policy sets the guideline for a work center to switch between regular and rework jobs. A production cycle begins with loading and processing of several batches of regular jobs with a lot size equal to s. The outcome of each completed regular job is an independent Bernoulli trial with three possibilities: good, rework, or scrap. Once the work center accumulates more than a threshold ω of rework jobs, it finishes the last batch of regular jobs and switches to rework jobs. The objective of this research is to find a threshold ω and a lot size s that maximize the average long‐term profit. The ultimate goal is to construct a simple algorithm to search for ω and s that can be implemented directly in production management systems, as a result of this work. © 1999 John Wiley & Sons, Inc. Naval Research Logistics 46: 273–301, 1999  相似文献   

18.
Most papers in the scheduling field assume that a job can be processed by only one machine at a time. Namely, they use a one‐job‐on‐one‐machine model. In many industry settings, this may not be an adequate model. Motivated by human resource planning, diagnosable microprocessor systems, berth allocation, and manufacturing systems that may require several resources simultaneously to process a job, we study the problem with a one‐job‐on‐multiple‐machine model. In our model, there are several alternatives that can be used to process a job. In each alternative, several machines need to process simultaneously the job assigned. Our purpose is to select an alternative for each job and then to schedule jobs to minimize the completion time of all jobs. In this paper, we provide a pseudopolynomial algorithm to solve optimally the two‐machine problem, and a combination of a fully polynomial scheme and a heuristic to solve the three‐machine problem. We then extend the results to a general m‐machine problem. Our algorithms also provide an effective lower bounding scheme which lays the foundation for solving optimally the general m‐machine problem. Furthermore, our algorithms can also be applied to solve a special case of the three‐machine problem in pseudopolynomial time. Both pseudopolynomial algorithms (for two‐machine and three‐machine problems) are much more efficient than those in the literature. © 1999 John Wiley & Sons, Inc. Naval Research Logistics 46: 57–74, 1999  相似文献   

19.
We deal with the problem of minimizing makespan on a single batch processing machine. In this problem, each job has both processing time and size (capacity requirement). The batch processing machine can process a number of jobs simultaneously as long as the total size of these jobs being processed does not exceed the machine capacity. The processing time of a batch is just the processing time of the longest job in the batch. An approximation algorithm with worst‐case ratio 3/2 is given for the version where the processing times of large jobs (with sizes greater than 1/2) are not less than those of small jobs (with sizes not greater than 1/2). This result is the best possible unless P = NP. For the general case, we propose an approximation algorithm with worst‐case ratio 7/4. A number of heuristics by Uzosy are also analyzed and compared. © 2001 John Wiley & Sons, Inc. Naval Research Logistics 48: 226–240, 2001  相似文献   

20.
We study two‐agent scheduling on a single sequential and compatible batching machine in which jobs in each batch are processed sequentially and compatibility means that jobs of distinct agents can be processed in a common batch. A fixed setup time is required before each batch is started. Each agent seeks to optimize some scheduling criterion that depends on the completion times of its own jobs only. We consider several scheduling problems arising from different combinations of some regular scheduling criteria, including the maximum cost (embracing lateness and makespan as its special cases), the total completion time, and the (weighted) number of tardy jobs. Our goal is to find an optimal schedule that minimizes the objective value of one agent, subject to an upper bound on the objective value of the other agent. For each problem under consideration, we provide either a polynomial‐time or a pseudo‐polynomial‐time algorithm to solve it. We also devise a fully polynomial‐time approximation scheme when both agents’ scheduling criteria are the weighted number of tardy jobs.  相似文献   