首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 31 毫秒
1.
A system undergoes minimal repair during [0, T] with a failure replacement on first failure during [T, a], or a planned replacement if the system is still functioning at elapsed time a. Repairs and replacements are not necessarily instantaneous. An expression is obtained for the asymptotic expected cost rate, and sufficient conditions are obtained for the optimum T* > 0. Several special cases are considered. A numerical investigation for a Weibull distributed time to first failure compares this elapsed-time policy with replacement on failure only, and also a policy based on system operating time or age. It is found that in many cases the elapsed-time-based policy is only marginally worse than one based on system age, and may therefore be preferred in view of its administrative convenience. © 1994 John Wiley & Sons, Inc.  相似文献   

2.
A generalized parallel replacement problem is considered with both fixed and variable replacement costs, capital budgeting, and demand constraints. The demand constraints specify that a number of assets, which may vary over time, are required each period over a finite horizon. A deterministic, integer programming formulation is presented as replacement decisions must be integer. However, the linear programming relaxation is shown to have integer extreme points if the economies of scale binary variables are fixed. This allows for the efficient computation of large parallel replacement problems as only a limited number of 0–1 variables are required. Examples are presented to provide insight into replacement rules, such as the “no‐splitting‐rule” from previous research, under various demand scenarios. © 2000 John Wiley & Sons, Inc. Naval Research Logistics 47: 40–56, 2000  相似文献   

3.
We consider state-age-dependent replacement policies for a multistate deteriorating system. We assume that operating cost rates and replacement costs are both functions of the underlying states. Replacement times and sojourn times in different states are all state-dependent random variables. The optimization criterion is to minimize the expected long-run cost rate. A policy-improvement algorithm to derive the optimal policy is presented. We show that under reasonable assumptions, the optimal replacement policies have monotonic properties. In particular, when the failure-rate functions are nonincreasing, or when all the replacement costs and the expected replacement times are independent of state, we show that the optimal policies are only state dependent. Examples are given to illustrate the structure of the optimal policies in the special case when the sojourntime distributions are Weibull. © 1994 John Wiley & Sons, Inc.  相似文献   

4.
This paper studies three tool replacement/operation sequencing strategies for a flexible manufacturing system over a finite time horizon: (1) failure replacement—replace the tool only upon failure, (2) optimal preventive tool replacement for a fixed sequence of operations, and (3) joint scheduling of the optimal preventive tool replacement times and the optimal sequence of operations. Stochastic dynamic decision models are used for strategies 2 and 3. The optimization criterion for strategies 2 and 3 is the minimization of the total expected cost over the finite time horizon. We will show through numerical studies that, with the same amount of information, the total expected costs can be reduced considerably by choosing an optimal strategy. Our conclusion is that in flexible manufacturing, optimal tool replacement and optimal operations sequencing are not separate issues. They should be considered jointly to minimize the expected total cost. © 2000 John Wiley & Sons, Inc. Naval Research Logistics 47: 479–499, 2000  相似文献   

5.
Most maintenance and replacement models for industrial equipment have been developed for independent single-component machines. Most equipment, however, consists of multiple components. Also, when the maintenance crew services several machines, the maintenance policy for each machine is not independent of the states of the other machines. In this paper, two dynamic programming replacement models are presented. The first is used to determine the optimal replacement policy for multi-component equipment. The second is used to determine the optimal replacement policy for a multi-machine system which uses one replacement crew to service several machines. In addition, an approach is suggested for developing an efficient replacement policy for a multi-component, multi-machine system.  相似文献   

6.
We consider the optimal replacement problem for a fault tolerant system comprised of N components. The components are distingushable, and the state of the system is given by knowing exactly which components are operationl and which have failed. The individual component failure rates depend on the state of the entire system. We assume that the rate at which the system produces income decreases as the system deteriorates and the system replacement cost rises. Individual components cannot be replaced. We give a greedy-type algorithm that produces the replacement policy that maximizes the long-run net system income per unit time.  相似文献   

7.
A reliability model for multicomponent multistate systems is presented. This is a generalization of a model previously studied by Hirsch, Meisner, and Boll. In the earlier model, when a failure occurs for which no replacement spare is available, the locations using the same type of part as that having failed are “cannibalized” so as to allocate the shortages to locations where they are least detrimental to system performance. Here, we permit certain restrictions to be imposed upon the cannibalization procedure, and develop effective techniques for relating the probability laws governing the level of system performance to the system structure, cannibalization policy, kit of spare parts, and part reliabilities.  相似文献   

8.
复杂系统复合维修间隔期优化模型   总被引:1,自引:0,他引:1  
采用组合策略对复杂系统辅以功能检测的定期更换维修工作进行综合优化.在分析复杂系统维修费用结构和组成的基础上,建立了其无限使用期条件下单位时间期望费用的数学模型,从而获得系统最佳的功能检测间隔期、定期更换周期内的检测次数和最优总费用.最后通过一个算例验证了该策略和模型的有效性.  相似文献   

9.
In this article, an optimal replacement policy for a cold standby repairable system consisting of two dissimilar components with repair priority is studied. Assume that both Components 1 and 2, after repair, are not as good as new, and the main component (Component 1) has repair priority. Both the sequence of working times and that of the components'repair times are generated by geometric processes. We consider a bivariate replacement policy (T,N) in which the system is replaced when either cumulative working time of Component 1 reaches T, or the number of failures of Component 1 reaches N, whichever occurs first. The problem is to determine the optimal replacement policy (T,N)* such that the long run average loss per unit time (or simply the average loss rate) of the system is minimized. An explicit expression of this rate is derived, and then optimal policy (T,N)* can be numerically determined through a two‐dimensional‐search procedure. A numerical example is given to illustrate the model's applicability and procedure, and to illustrate some properties of the optimal solution. We also show that if replacements are made solely on the basis of the number of failures N, or solely on the basis of the cumulative working time T, the former class of policies performs better than the latter, albeit only under some mild conditions. © 2010 Wiley Periodicals, Inc. Naval Research Logistics, 2010  相似文献   

10.
Burn‐in is a widely used method to improve the quality of products or systems after they have been produced. In this paper, we consider the problem of determining bounds to the optimal burn‐in time and optimal replacement policy maximizing the steady state availability of a repairable system. It is assumed that two types of system failures may occur: One is Type I failure (minor failure), which can be removed by a minimal repair, and the other is Type II failure (catastrophic failure), which can be removed only by a complete repair. Assuming that the underlying lifetime distribution of the system has a bathtub‐shaped failure rate function, upper and lower bounds for the optimal burn‐in time are provided. Furthermore, some other applications of optimal burn‐in are also considered. © 2004 Wiley Periodicals, Inc. Naval Research Logistics, 2004  相似文献   

11.
针对单部件系统工龄更换策略下备件需求的特点,建立了工龄更换策略与备件库存控制的联合优化模型。该模型通过分析一个订购期内工龄更换间隔期T及备件最大库存水平S对系统寿命分布的影响,建立了工龄更换间隔期、订购间隔期及最大库存水平与单位时间总费用(包括维修费用和库存费用)的关系,然后以单位时间总费用最小为目标,优化工龄更换间隔期T、订购间隔期t0及最大库存水平S。最后,基于案例,运用Matlab对模型进行数值计算,结果表明模型能有效地降低单位时间的总费用。  相似文献   

12.
A policy of periodic replacement with minimal repair at failure is considered for a complex system. Under such a policy the system is replaced at multiples of some period T while minimal repair is performed at any intervening system failures. The cost of a minimal repair to the system is assumed to be a nonde-creasing function of its age. A simple expression is derived for the expected minimal repair cost in an interval in terms of the cost function and the failure rate of the system. Necessary and sufficient conditions for the existence of an optimal replacement interval are exhibited in the case where the system life distribution is strictly increasing failure rate (IFR).  相似文献   

13.
A production system which generates income is subject to random failure. Upon failure, the system is replaced by a new identical one and the replacement cycles are repeated indefinitely. In our breakdown model, shocks occur to the system in a Poisson stream. Each shock causes a random amount of damage, and these damages accumulate additively. The failure time depends on the accumulated damage in the system. The income from the system and the cost associated with a planned replacement depend on the accumulated damage in the system. An additional cost is incurred at each failure in service. We allow a controller to replace the system at any stopping time T before failure time. We will consider the problem of specifying a replacement rule that is optimal under the following criteria: maximum total long-run average net income per unit time, and maximum total long-run expected discounted net income. Our primary goal is to introduce conditions under which an optimal policy is a control limit policy and to investigate how the optimal policy can be obtained. Examples will be presented to illustrate computational procedures.  相似文献   

14.
The parallel machine replacement problem consists of finding a minimum cost replacement policy for a finite population of economically interdependent machines. In this paper, we formulate a stochastic version of the problem and analyze the structure of optimal policies under general classes of replacement cost functions. We prove that for problems with arbitrary cost functions, there can be optimal policies where a machine is replaced only if all machines in worse states are replaced (Worse Cluster Replacement Rule). We then show that, for problems with replacement cost functions exhibiting nonincreasing marginal costs, there are optimal policies such that, in any stage, machines in the same state are either all kept or all replaced (No‐Splitting Rule). We also present an example that shows that economies of scale in replacement costs do not guarantee optimal policies that satisfy the No‐Splitting Rule. These results lead to the fundamental insight that replacement decisions are driven by marginal costs, and not by economies of scale as suggested in the literature. Finally, we describe how the optimal policy structure, i.e., the No‐Splitting and Worse Cluster Replacement Rules, can be used to reduce the computational effort required to obtain optimal replacement policies. © 2005 Wiley Periodicals, Inc. Naval Research Logistics, 2005  相似文献   

15.
从无动力逃生梯的工作原理、自身优点、疏散能力和产品造价等方面与安全疏散楼梯进行比较,对无动力逃生梯部分替代疏散楼梯的可行性进行了深入分析和探讨,最后得出可以根据建筑的消防安全疏散的实际情况部分替代疏散楼梯。  相似文献   

16.
Block replacement and modified block replacement policies for two‐component systems with failure dependence and economic dependence are considered in this paper. Opportunistic maintenance policies are also considered. Where tractable, long‐run costs per unit time are calculated using renewal theory based arguments; otherwise simulation studies are carried out. The management implications for the adoption of the various policies are discussed. The usefulness of the results in the paper is illustrated through application to a particular two‐component system. © 2002 Wiley Periodicals, Inc. Naval Research Logistics, 2003  相似文献   

17.
The replacement or upgrade of productive resources over time is an important decision for a manufacturing organization. The type of technology used in the productive resources determines how effectively the manufacturing operations can support the product and marketing strategy of the organization. Increasing operating costs (cost of maintenance, labor, and depreciation) over time force manufacturing organizations to periodically consider replacement or upgrade of their existing productive resources. We assume that there is a setup cost associated with the replacement of a machine, and that the setup cost is a nonincreasing function of the number of replacements made so far due to learning in setups. The operating cost of a newer machine is assumed to be lower than the operating cost of an older machine in any given period, except perhaps in the first period of operation of the new machine when the cost could be unusually high due to higher initial depreciation. A forward dynamic programming algorithm is developed which can be used to solve finite-horizon problems. We develop procedures to find decision and forecast horizons such that choices made during the decision horizon based only on information over the forecast horizon are also optimal for any longer horizon problem. Thus, we are able to obtain optimal results for what is effectively an infinite-horizon problem while only requiring data over a finite period of time. We present a numerical example to illustrate the decision/forecast horizon procedure, as well as a study of the effects of considering learning in making a series of machine replacement decisions. © 1993 John Wiley & Sons. Inc.  相似文献   

18.
Burn‐in is a widely used method to improve the quality of products or systems after they have been produced. In this paper, we study burn‐in procedure for a system that is maintained under periodic inspection and perfect repair policy. Assuming that the underlying lifetime distribution of a system has an initially decreasing and/or eventually increasing failure rate function, we derive upper and lower bounds for the optimal burn‐in time, which maximizes the system availability. Furthermore, adopting an age replacement policy, we derive upper and lower bounds for the optimal age parameter of the replacement policy for each fixed burn‐in time and a uniform upper bound for the optimal burn‐in time given the age replacement policy. These results can be used to reduce the numerical work for determining both optimal burn‐in time and optimal replacement policy. © 2007 Wiley Periodicals, Inc. Naval Research Logistics, 2007  相似文献   

19.
主要介绍哈龙灭火系统替代技术的现状 ,分析气体灭火系统、非气体灭火系统及传统替代技术的主要特点与现存缺陷 ,总结研究方向。  相似文献   

20.
This paper describes a method of solving aircraft service life problems. The particular application concerns aircraft in the Naval Advanced Jet Training Command. The method of solution is comparative present value analysis of alternative replacement policies. The likely risks of estimation errors are reflected in the comparisons of present values. Differences are noted in the benefits associated with each policy, but external to Naval Aviation. Since the values of these benefits can be determined only at a higher level of decision-making, the result of the study is not a conclusive selection among policies, but a schedule of present values on the basis of which, together with values of the external benefits, a decision can be reached. This paper discusses replacement policies for aircraft used in the Naval Advanced Jet Pilot Training mission. Taking engineering technology and the training syllabus as given, four feasible plans for introducing replacement aircraft into service are evaluated in terms of the present values of differential costs associated with the plans and in terms of the likely errors in cost estimates used in calculation of the present values. The trade-off between present value of costs and planning flexibility is emphasized in choosing a recommended time pattern of aircraft replacement. The specific aircraft mixes considered are the TF–9J/TAF–9J and the TA–4F/A–4B. The first is the currently employed mix; the second is the proposed replacement. The problem is to select an optimal time-pattern of replacement of F–9's by A–4's, given technological differences favoring the A–4 and increasing costs of maintaining squadrons of F–9's. Replacements by aircraft types other than the A–4 are considered impractical. Four feasible plans for introducing A–4's through a 5-year period are evaluated in terms of current best estimates of the related costs of the plans and in terms of the flexibility of modifying each plan given future better information concerning the relevant costs. The method of analysis is comparative present value of expected costs.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号